Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246M562 + (03:22:06, 2 December 2024)
- ML20246M559 + (03:22:07, 2 December 2024)
- ML20246M557 + (03:22:07, 2 December 2024)
- ML20246M553 + (03:22:08, 2 December 2024)
- ML20246M550 + (03:22:09, 2 December 2024)
- IR 05000338/1989027 + (03:22:11, 2 December 2024)
- ML20246M544 + (03:22:12, 2 December 2024)
- ML20246M538 + (03:22:13, 2 December 2024)
- ML20246M540 + (03:22:13, 2 December 2024)
- ML20246M537 + (03:22:14, 2 December 2024)
- ML20246M534 + (03:22:14, 2 December 2024)
- ML20246M530 + (03:22:15, 2 December 2024)
- ML20246M529 + (03:22:16, 2 December 2024)
- ML20246M526 + (03:22:17, 2 December 2024)
- ML20246M525 + (03:22:17, 2 December 2024)
- IR 05000413/1989022 + (03:22:22, 2 December 2024)
- ML20246M518 + (03:22:23, 2 December 2024)
- ML20246M519 + (03:22:23, 2 December 2024)
- ML20246M516 + (03:22:24, 2 December 2024)
- ML20246M515 + (03:22:25, 2 December 2024)
- ML20246M510 + (03:22:26, 2 December 2024)
- ML20246M508 + (03:22:27, 2 December 2024)
- ML20246M506 + (03:22:28, 2 December 2024)
- ML20246M503 + (03:22:29, 2 December 2024)
- ML20246M502 + (03:22:29, 2 December 2024)
- ML20246M497 + (03:22:30, 2 December 2024)
- ML20246M495 + (03:22:31, 2 December 2024)
- ML20246M496 + (03:22:31, 2 December 2024)
- ML20246M492 + (03:22:32, 2 December 2024)
- ML20246M487 + (03:22:33, 2 December 2024)
- ML20246M488 + (03:22:33, 2 December 2024)
- W3P88-1258, Application for Amend to License NPF-38,clarifying Operability Criteria for Various HVAC Components Servicing Control Room Including,Control Room Air Filtration Sys,Air Temp & Isolation & Pressure.Fee Paid + (03:22:34, 2 December 2024)
- BSEP-89-0434, Responds to NRC 890404 Request for Info to Support Upcoming 10CFR50,App R Audit at Plant,Scheduled for Wk of 890522. Informs That Requested Info Sent to D Ward on 890421 + (03:22:35, 2 December 2024)
- IR 05000416/1989010 + (03:22:35, 2 December 2024)
- ML20246M480 + (03:22:36, 2 December 2024)
- ML20246M479 + (03:22:36, 2 December 2024)
- ML20246M478 + (03:22:37, 2 December 2024)
- ML20246M475 + (03:22:38, 2 December 2024)
- ML20246M476 + (03:22:38, 2 December 2024)
- 05000369/LER-1989-014, :on 890713,discovered That Part of Tech Spec 3.12.2 Re Land Use Census Never Fulfilled.Caused by Mgt Deficiency Because of Poor Interface Between Groups.Meetings Held W/Radiation Protection Personnel + (03:22:41, 2 December 2024)
- NRC-89-0198, Advises That Automatic Depressurization Sys Scheduled to Be Modified During First Refueling Outage,Per TMI Action Item II.K.3.18 of NUREG-0737.Bypass Timer Function Described in 890403 Tech Spec Change Request Re ECCS Instrumentation + (03:22:42, 2 December 2024)
- NRC-89-0175, Responds to 890627 Request for Addl Info Re Flow & Pressure Setpoints for Low Pressure Eccs,Per Insp Rept 50-341/88-21. LPCI Sys Operability Test Performed Using Installed Control Room Instrumentation for Measuring Flow & Pressure + (03:22:43, 2 December 2024)
- ML20246M466 + (03:22:44, 2 December 2024)
- ML20246M459 + (03:22:45, 2 December 2024)
- ST-HL-AE-3217, Forwards risk-based Evaluation of Plant Tech Specs + (03:22:45, 2 December 2024)
- ML20246M456 + (03:22:46, 2 December 2024)
- ML20246M452 + (03:22:47, 2 December 2024)
- ML20246M451 + (03:22:47, 2 December 2024)
- ML20246M448 + (03:22:48, 2 December 2024)
- ML20246M443 + (03:22:49, 2 December 2024)
- ML20246M431 + (03:22:54, 2 December 2024)
- ML20246M428 + (03:22:54, 2 December 2024)