- ML20247L548 + (00:54:09, 2 December 2024)
- 05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced + (00:54:11, 2 December 2024)
- 05000458/LER-1989-020, :on 890419,freeze Plug on Standby Svc Water Line in Auxiliary Bldg Failed Resulting in Leakage of Svc Water & Selective Power Outage.Caused by Procedural Inadequacy.Personnel Secured Sys for Leak + (00:54:14, 2 December 2024)
- ML20247L544 + (00:54:15, 2 December 2024)
- ML20247L542 + (00:54:15, 2 December 2024)
- 05000263/LER-1998-003, Forwards LER 98-003-00 Re Transgranular Stress Corrosion Cracking Identified in Control Rod Drive Lines.Rept Contains Listed New NRC Commitments + (00:54:16, 2 December 2024)
- ML20247L540 + (00:54:16, 2 December 2024)
- PNO-IV-89-060, on 890918,spent Tc-99m Inadvertently Placed in Hospital Incinerator.Area Sealed Off Pending Arrival of Health Physicist or State Radiation Control Staff Member + (00:54:17, 2 December 2024)
- ML20247L538 + (00:54:18, 2 December 2024)
- ML20247L535 + (00:54:18, 2 December 2024)
- ML20247L534 + (00:54:19, 2 December 2024)
- ML20247L532 + (00:54:21, 2 December 2024)
- ML20247L530 + (00:54:21, 2 December 2024)
- PNO-I-89-038, on 890525,confirmatory Action Ltr Issued, Confirming Licensee Commitment to Maintain Units in Shutdown Condition Until Matl Conditions Re Unit 2 Pressurizer Penetrations Resolved & Weaknesses Re Procedures Corrected + (00:54:22, 2 December 2024)
- ML20247L527 + (00:54:23, 2 December 2024)
- ML20247L526 + (00:54:24, 2 December 2024)
- ML20247L525 + (00:54:24, 2 December 2024)
- ML20247L524 + (00:54:25, 2 December 2024)
- ML20247L522 + (00:54:26, 2 December 2024)
- ML20247L523 + (00:54:26, 2 December 2024)
- ML20247L521 + (00:54:27, 2 December 2024)
- ML20247L518 + (00:54:27, 2 December 2024)
- ML20247L517 + (00:54:28, 2 December 2024)
- ML20247L514 + (00:54:29, 2 December 2024)
- ML20247L515 + (00:54:29, 2 December 2024)
- ML20247L513 + (00:54:30, 2 December 2024)
- 05000440/LER-1989-022, :on 890627,deficient Surveillance Instruction Resulted in Scram Discharge Vol High Level Instrument Outside Tech Spec Allowable Values.Caused by Procedural Deficiency.Surveillance Instructions Revised + (00:54:32, 2 December 2024)
- 05000298/LER-1989-014, :on 890424 & 26,unplanned Actuation of Group 6 Isolation Occurred.Caused by Loose Terminal Board Connection.Loose Terminal Board Connection Retightened + (00:54:34, 2 December 2024)
- ML20247L510 + (00:54:35, 2 December 2024)
- ML20247L508 + (00:54:35, 2 December 2024)
- ML20247L507 + (00:54:36, 2 December 2024)
- ML20247L506 + (00:54:36, 2 December 2024)
- ML20247L504 + (00:54:37, 2 December 2024)
- ML20247L503 + (00:54:38, 2 December 2024)
- ML20247L502 + (00:54:38, 2 December 2024)
- ML20247L500 + (00:54:39, 2 December 2024)
- ML20247L498 + (00:54:40, 2 December 2024)
- 05000285/LER-1989-011, :on 890418,hourly Fire Watch Patrol at Door 1025-2 Not Performed & Penetration Seal Not Restored to Operable Status within 7 Days.Caused by Use of Uncontrolled Working List.Security Bulletin Issued + (00:54:47, 2 December 2024)
- ML20247L492 + (00:54:48, 2 December 2024)
- ML20247L491 + (00:54:48, 2 December 2024)
- ML20247L488 + (00:54:51, 2 December 2024)
- IR 05000006/1989002 + (00:54:52, 2 December 2024)
- AECM-89-0070, Advises That Listed Property Insurance Coverage Will Be in Effect on 890401.Certificates of Coverage from Maelu & Nelia Encl + (00:54:53, 2 December 2024)
- ML20247L482 + (00:54:54, 2 December 2024)
- PY-CEI-NRR-1042, Forwards LERs 89-004-01 & 89-022-00 for Plant + (00:54:54, 2 December 2024)
- ML20247L479 + (00:54:55, 2 December 2024)
- ML20247L480 + (00:54:55, 2 December 2024)
- ML20247L478 + (00:54:56, 2 December 2024)
- 05000482/LER-1989-012, :on 890626,control Room Ventilation Isolation Signal Initiated When Control Room Air Intake Radiation Monitor GKRE-04 Experienced Loss of Power.Caused by Blown Fuse.Fuse Replaced + (00:54:58, 2 December 2024)
- ML20247L476 + (00:54:59, 2 December 2024)