ML20247L525

From kanterella
Jump to navigation Jump to search
Advises That 880923 Rev 20 to Security Plan Consistent W/ 10CFR50.54(p) & Acceptable.Chapter 13, Security Records, Should Be Revised in Next Plan Rev to Include New Records Retention Practices,Per 10CFR50 & 73
ML20247L525
Person / Time
Site: Yankee Rowe
Issue date: 03/22/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Drawbridge B
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8904050483
Download: ML20247L525 (3)


Text

_

I

, J.,

?

.I I

liar 2 21939 Docket No. 50 Yankee Atomic Electric Company ATTN: Mr. Bruce L. Drawbridge Vice President and Manager

)

of. Operations 1671 Worcester Road Framingham, Massachusetts 01740-1398 Gentlemen:

SUBJECT:

SECURITY PLAN REVISION UNDER 10 CFR 50.54(p)-YANKEE NUCLEAR POWER STATION Your letter of September 23, 1988, transmitted Revision No. 20 to the Yankee Nuclear Power Station Security Plan.

This revision included changes to the security organization and minor editorial changes.

i L

We have reviewed the plan revision and have determined that the changes are l

consistent with tne provisions of 10 CFR 50.54(p), and are considered acceptable for inclusion into the plan.

I However, v:e noticed that Chapter 13 " Security Records", was. not revised to l

i conform to the 1988 revision of 10 CFR Parts 50 and 73 relative to the retention of security records.

This has been discussed with Mr. J. Palmieri of your staff.

It.is our understanding that Mr. Palmieri will include the new records retention requirements of 10 CFR Parts 50 an? 73 in the next plan revision, and that your current records retention practices do not constitute noncompliance with the revised NRC requirements.

If our understanding is incorrect, please advise us within ten days of receipt of this letter.

The enclosure to your letter contains Safeguards Information of a type specified in 10 CFR 73.21, and is being withheld from public disclosure.

E. D. Sylvester (215-337-5308) is our contact should these be any questions

'ing this matter.

e r

Sincerely, 0-1d elSi-H B4:1 Ronald R. Bellamy, Chief Facilities Radiological' Safety and Safeguards Branch 0FFICIAL RECORD COPY YANKEE SEC PLAN - 0001.0.0 5

89040504e3 890322 03/09/89 ADOCK0500g9 PDR F

l

~ 2 cc:.

Dr. Andrew'Kadak,' President Mr. George Papanic, Jr.

Yankee Atomic Electric Company Senior Project Engineer-Licensing 1671 Worcester Road Yankee Atomic Electric Company Framingham, Massachusetts 01701 1671 Worcester Road Framingham, Massachusetts 01701 Thomas Dignan, Esquire Ropes and Gray 225 Franklin Street Boston, Massachusetts 02110 Mr. N.-N. St. Laurent

' Plant Superintendent Yankee Atomic Electric Company Star Route Rowe, Massachusetts 01367 Chairman Board of Selectmen Town of Rowe Rowe, Massachusetts 01367 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 28 Monroe Bridge, Massachusetts 01350

)

Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 7th Floor Boston, iiassachusetts 02111 Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)-

1 0

0FFICIAL RECORD COPY YANKEE SEC PLAN - 0002.0.0 03/08/89

1 j

3 bec:

Chief, NRR/RSGB NRR Docket File l

Doc.ument Control Desk, Of ficial Record Copy - RID Code RC01 Region I Docket Room, w/ concurrence l

Region I Licensing File, w/ concurrence l

Region I Safeguards Files, w/ concurrence

{

Region I Section Chief DRP-3C l

h I

i l

J l

l l

I RI:DRSS RI:DRSS RI S

Sylvegr K

i Bellamy 03/2N89 03/g2-/89 03/>"/Ct OFFICIAL RECC'RD COPY YANKEE SEC PLAN - 0003.0.0 03/08/89 I

1