Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043A998 + (21:28:30, 19 December 2024)
- ML20043A997 + (21:28:31, 19 December 2024)
- ML20043A996 + (21:28:32, 19 December 2024)
- ST-HL-AE-3463, Discusses Actions Taken Re Prompt Notification Sys.Util Found Autodialer Sys Offer Acceptable Alternative to Replacing Majority of Tone Alert Radios + (21:28:33, 19 December 2024)
- ML20043A994 + (21:28:36, 19 December 2024)
- ML20043A992 + (21:28:38, 19 December 2024)
- PNO-II-90-023, during 900504-06,Campbell Pacific,Model MC-1, Moisture Density Gauge Stolen from Southern Earth Sciences. Gauge Stolen from Locked Truck Parked in secured,fenced-in Area.Info Notice Issued & Investigation Continuing + (21:28:38, 19 December 2024)
- ML20043A991 + (21:28:39, 19 December 2024)
- ML20043A990 + (21:28:41, 19 December 2024)
- ML20043A989 + (21:28:42, 19 December 2024)
- 05000311/LER-1990-016, :on 900420,discovered That Containment Pressure Relief Conducted W/Associated Radiation Monitoring Sys Channels Inoperable.Caused by Inoperability of Control Room Pump Low Flow Alarm.Procedures Revised + (21:28:44, 19 December 2024)
- 05000295/LER-1990-009, :on 900418-21,incorrect Samples of Vent Stack & Gas & Particulate Activity Taken When Radiation Monitor ORT-PR18 Out of Svc on 900418.Caused by Personnel Error. Stricter Mgt Controls Imposed Re Monitors + (21:28:46, 19 December 2024)
- HL-1111, Special Rept 90-002:on 900328,portions of Recirculation Pump Motor Generator Set Room Wall Declared Inoperable.On 900327,electrical Raceways Declared Inoperable Due to Damaged Fire Wrapping.Hourly Fire Watch Initiated + (21:28:47, 19 December 2024)
- IR 05000321/1990012 + (21:28:50, 19 December 2024)
- ML20043A983 + (21:28:52, 19 December 2024)
- U-601671, Ro:On 900508,discovered That Replacement Bellows Had Tie Rods Installed to Limit Bellows Expansion.Div I & II Diesel Generators Declared Inoperable & Controlled Plant Shutdown Initiated.Unusual Event Terminated on 900509 + (21:28:52, 19 December 2024)
- U-601670, Notifies That Wc Metzner Resigned from Position of Licensed Operator W/Util,Effective 900430 + (21:28:54, 19 December 2024)
- ML20043A980 + (21:28:56, 19 December 2024)
- ML20043A978 + (21:28:56, 19 December 2024)
- ML20043A977 + (21:28:57, 19 December 2024)
- ML20043A974 + (21:28:58, 19 December 2024)
- ML20043A976 + (21:28:58, 19 December 2024)
- SNRC-1723, Advises That,Effective 900501,LJ Calone & Ja Notaro Will No Longer Need to Maintain Senior Operator Licenses + (21:29:00, 19 December 2024)
- ML20043A973 + (21:29:00, 19 December 2024)
- ML20043A971 + (21:29:03, 19 December 2024)
- ML20043A969 + (21:29:04, 19 December 2024)
- ML20043A966 + (21:29:05, 19 December 2024)
- AECM-90-0089, Forwards Draft Tech Specs for Power Distribution Limits,Rcs, ECCS & Plant Sys as Part of Util Involvement W/Bwr Owners Group as BWR-6 Lead Plant + (21:29:07, 19 December 2024)
- ML20043A964 + (21:29:09, 19 December 2024)
- NRC-90-0074, Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members + (21:29:10, 19 December 2024)
- ML20043A961 + (21:29:10, 19 December 2024)
- 05000333/LER-1990-015, :on 900420,discovered That Prerequisite Surveillance Test of source-range Monitors Not Performed Prior to Beginning Replacement of LPRMs on 900419.Caused by Procedure Deficiency.Lprm Procedure Revised + (21:29:11, 19 December 2024)
- TAC:76453 + (21:29:12, 19 December 2024)
- ML20043A959 + (21:29:13, 19 December 2024)
- IR 05000302/1990012 + (21:29:16, 19 December 2024)
- ML20043A954 + (21:29:18, 19 December 2024)
- ML20043A953 + (21:29:20, 19 December 2024)
- IR 05000348/1990009 + (21:29:23, 19 December 2024)
- ML20043A950 + (21:29:24, 19 December 2024)
- ML20043A949 + (21:29:28, 19 December 2024)
- ML20043A947 + (21:29:29, 19 December 2024)
- IR 05000413/1990009 + (21:29:38, 19 December 2024)
- ML20043A942 + (21:29:40, 19 December 2024)
- ML20043A936 + (21:29:41, 19 December 2024)
- ML20043A935 + (21:29:42, 19 December 2024)
- ML20043A933 + (21:29:43, 19 December 2024)
- 05000413/LER-1989-030-01, :on 890726,Tech Spec Violation Occurred Due to Shipment of Two Liners of Secondary Bead & Powdex Resin Mixture.On 891215,same Tech Spec Violation Occurred.Caused by Mgt Deficiency.Shipments Suspended + (21:29:44, 19 December 2024)
- ML20043A922 + (21:29:46, 19 December 2024)
- ML20043A921 + (21:29:47, 19 December 2024)
- ML20043A919 + (21:29:48, 19 December 2024)
- ML20043A918 + (21:29:49, 19 December 2024)