ML20043A994
| ML20043A994 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/10/1990 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| References | |
| NUDOCS 9005240025 | |
| Download: ML20043A994 (4) | |
Text
.
[
e.
MAY 101990 4
Docket Nos. 50-424,.50-425.
License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. W. G, Hairston - III Senior Vice President -
Nuclear Operations-P. O. Box 1295 Birmingham, AL 35201
- Gentlemen:
a l
SUBJECT:
CONFIRMATION OF MEETING - ENFORCEMENT CONFERENCE - V0GTLE UNITS-1 AND 2 l
This confirms a telephone conversation _between Mr. C. K. McCoy of your; staff.
and Mr. K. Brockman of my staff on May 4,1990, concerning an Enforcement-Conference to be conducted at the NRC Region-II Office at 1:00 p.m....on May 22, 1990.
This meeting was requested in: order.to discuss-the circumstances of an
-unsecured safeguards' container discovered on-April 1 25, 1990, accountability and--
control of safeguards documents to include ~ reproduction andt. uncontrolled copies, and your proposed corrective actions to preclude further occurrences.~of failure to protect safeguards information.
1 Should you have any questions regarding these arrangements, we will be pleased' to discuss them.
l
' Sincerely...
I l
);
L D/
l Luis A.-.Reyes, Director l
Division of Reactor Projects.
l l
Enclosure:
l Preposed Meeting Agenda 1a l
cc w/ encl:
R. P. Mcdonald Executive Vice President-Nuclear h
Operations Georgia Power Company i
P. O. Box 1295 Birmingham, AL '35201 (cc w/enci cont'd - see page 2) 9005240025 900510 4
PDR ADOCK 05000424 g
PDC N/
, Georgia Power Company 2
NY 101990 cc w/ encl:~ (Continued)
C' K.--McCoy i
Vice President-Nuclear Georgia Power Company P. 0. 1295 i
Birmingham, AL 35201 G. Bockhold, Jr.
General Manager, Nuclear _0perations Georgia. Power Company P. O. 1600
.n.
Waynesboro, GA 30830 3
J. A. Bailey Manager-Licensing Georgia Power Company P
0._ Box 1295 4
Birmingham, AL 35201 Ernest L. Blake, Esquire Shaw,.Pittman, Potts and Trowbridge 2300 N Street, NW Washington,.D. C.
20037
.l L
J. E. Joiner. Esquire.
l Troutman, Sanders, Lockerman, and Ashmore l
1400 Candler Building l
127 Peachtree Street, NE l
Atlanta, GA 30303 i
D. Kirkland, III, Counsel Office of the Consumer's L
Utility Council l-Suite 225, 32 Peachtree Street, NE Atlanta, GA 30302 Office of Planning and Budget Room 615B' 270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner
~
Burke County Commission Waynesboro, GA 30830 J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street, SE, Suite 1252
' Atlanta, GA 30334 (cc w/ enc 1 cont'd - see page 3)
I r
m, Georgia Power Company 3
NM 10 Gg cc w/ enc 1:
(Continued)
Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 State'of Georgia bec w/ enc 1:
E. Reis,=0GC T. Reed, NRR G. Jenkins, RII-K. Brockman, RII A. Herdt. RII.
j Document Control Desk i
NRC Resident Inspector l
U.S. Nuclear Regulatory Commission P. O. Box 572 Waynesboro, GA 30830 i
l i
l 1
l l
l i
.RII RII RI RII hR I gar p an v
' Trocine KBrockman AHerdt LReyes p dStohr JMi ioan I
5/t9/90 5/e /90 5/po/90 5/ /90 5p/90-0
/
ENCLOSURE PROPOSED MEETING AGENDA i
Georgia Power Company 1:00 p.m...May 22, 1990 A.
Opening Remarks 4 S. D. Ebneter W..G. Hairston, III B.
General Discussion C. K. McCoy 1.
Circumstances of Unsecured E. M. Dannemiller Safeguards Container Discovered l
April.25, 1990 2.
Accountability and Control of E. M. Dannemiller Safeguards Documents Including Reproduction and Uncontrolled-Copies 3.
Corrective' Actions to Preclude E. M.'Dannemiller' Further Occurrences of Failure to Protect Safeguards Information C.
Closing Remarks W. G. Hairston, III S. D.-Ebneter i
i l
l i
l.
L L
1 h
5 s
4