Text
g, May 26o 1990 E
VIHOINIA ELECTRIC AND Powan COMPANY R a cir >s own,Vinorn A 20201 l
o i
90L 74-U.S. Nuclear Regulatory Commission' Serial No.:-
1_
Attention: Document Control Desk NL&P/RMN R1-Washington, D.C. ~20555 -
Docket Nos.: 50-338 L
50-339 ~
i License Nos.: NPF-4' i
. N PF-7 j
Gentlemen:-
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 i
PROPOSED TECHNICAL SPECIFICATION CHANGES
- ]
RADIATION MONITOR SETPOINT UPDATE Pursuant to 10 CFR '50.90, the< Virginia Electric and Power Company requests
.j amendments, in the form ofichanges'to the Technical Specifications,.to Operating 1
License Numbers NPF 4 and NPF-7'for North Anna Power Station Units 01.and 2, respectively.
a
' The proposed Technical Specifications changes will update the clarm setpoints for the i
high range effluent ~ monitors. _The high range effluent monitors:and associated Technical Specifications were added due to accident monitoring concerns in NUREG 0737. The "Hi" and "Hi Hi" alarms were intended to provide warnings of impending site-1 area or general emergencies. The criteria for. declaring a site-area or ge_neral emergency are in our Emergency Plan Implementing Procedures (EPIPs),Lwhich have j
been revised-since the original setpoint' calculations were done. We wish to change l
the setpoints to be consistent with currently' accepted EPIPs. Also, the Ventilation. Vent and Process Vent monitors have.been modified to multiply the concentration by the-flow rate and report releases in units of-Ci/sec, a more relevant measure than the i
currently approved Ci/cc.
1 The proposed changes are presented in' Attachments 1 and 2 for Units 1 and 2, l
o respectively. The setpoints are not in our proposed MERITS Technical Specifications, j
therefore a MERITS change is not attached. A. discussion of the proposed changes l
i:
Lwith the technical justification and safety evaluation of thel proposed changes is.
provided in Attachment 3.
This request has been reviewed by the Station Nuclear -Safety and Operating Committee. It has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59 orLa significant hazards consideration as i
defined in 10 CFR 50.92. The basis for our determination that no signification hazards consideration is involved is presented in Attachment 4.
900523o358 900516 "i
l f
8N PDR ADOCK 05o00338 a
P PDC
)
j,
- i
};
Should you have any questions or require additional information, please contact us at '
your earliest convenience, l
l Very truly yours,.
J
[/)
J%_
hh
'V L. Stewart _
j enior Vice President - Nuclear j
Attachments.
1.
Proposed Technical Specification Change for North Anna. Unit 1 2.
Proposed Technical Specification Change for North Anna Unit 2 i
3.
Discussion of Proposed Changes.
4.
~10 CFR 50.92 Evaluation cc; U.S. Nuclear Regulatory Commission Region 11
~
101.Marietta Streeti N.W.
'i
- Suite 2900
-1 Atlanta, GA 30323 '
' Mr. M. S. Lesser NRC Sealor Resident Inspector j
North Anna Power Station Commissioner Department of Health Room 400 109 Governor Street i
Richmond, Virginia 23219 l
1
-i
)
- l k
'j l
p i
I
f-3 i
'.,s
..n r,.
l 1
l COMMONWEALTH OF VIRGINIA.- )-
)
1
- COUNTYOFHENRICO -
. ).
)
.l The' foregoing : document was acknowledged befora me, fin 7andL for. the:
County-and Commonwealth aforesaid,' 'today; f by. J, L; : Wilson whol isl:
1
~
' Assistant ViceL President -- Nuclear; Operations, forLW, L.L Stew'artfwho..is-J
' Senior Vice President - Nucisar, of Virginia' Electric l'and l Power Company; o
He'is duly authorized to execute'and file the' foregoing' document'in b_ehalfL
,of that Company, and the statementsiin the' document.'are true' tot the best of his knowledge and belief.
- Acknowledged _before.me this. /d>, day : of..
I dor 19 1 g
My Commission Expires:
(
4/A
/
. 19f k.'
4
[.
- p C
L l.
/bef aff a
'Notaryj Public
~
L L
i (SEAL)-
s
..i.'
~
-