Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-90-0083, Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 900525 + (21:28:29, 19 December 2024)
- ML20043A998 + (21:28:30, 19 December 2024)
- ML20043A997 + (21:28:31, 19 December 2024)
- ML20043A996 + (21:28:32, 19 December 2024)
- ST-HL-AE-3463, Discusses Actions Taken Re Prompt Notification Sys.Util Found Autodialer Sys Offer Acceptable Alternative to Replacing Majority of Tone Alert Radios + (21:28:33, 19 December 2024)
- ML20043A994 + (21:28:36, 19 December 2024)
- ML20043A992 + (21:28:38, 19 December 2024)
- PNO-II-90-023, during 900504-06,Campbell Pacific,Model MC-1, Moisture Density Gauge Stolen from Southern Earth Sciences. Gauge Stolen from Locked Truck Parked in secured,fenced-in Area.Info Notice Issued & Investigation Continuing + (21:28:38, 19 December 2024)
- ML20043A991 + (21:28:39, 19 December 2024)
- ML20043A990 + (21:28:41, 19 December 2024)
- ML20043A989 + (21:28:42, 19 December 2024)
- 05000311/LER-1990-016, :on 900420,discovered That Containment Pressure Relief Conducted W/Associated Radiation Monitoring Sys Channels Inoperable.Caused by Inoperability of Control Room Pump Low Flow Alarm.Procedures Revised + (21:28:44, 19 December 2024)
- 05000295/LER-1990-009, :on 900418-21,incorrect Samples of Vent Stack & Gas & Particulate Activity Taken When Radiation Monitor ORT-PR18 Out of Svc on 900418.Caused by Personnel Error. Stricter Mgt Controls Imposed Re Monitors + (21:28:46, 19 December 2024)
- HL-1111, Special Rept 90-002:on 900328,portions of Recirculation Pump Motor Generator Set Room Wall Declared Inoperable.On 900327,electrical Raceways Declared Inoperable Due to Damaged Fire Wrapping.Hourly Fire Watch Initiated + (21:28:47, 19 December 2024)
- IR 05000321/1990012 + (21:28:50, 19 December 2024)
- ML20043A983 + (21:28:52, 19 December 2024)
- U-601671, Ro:On 900508,discovered That Replacement Bellows Had Tie Rods Installed to Limit Bellows Expansion.Div I & II Diesel Generators Declared Inoperable & Controlled Plant Shutdown Initiated.Unusual Event Terminated on 900509 + (21:28:52, 19 December 2024)
- U-601670, Notifies That Wc Metzner Resigned from Position of Licensed Operator W/Util,Effective 900430 + (21:28:54, 19 December 2024)
- ML20043A980 + (21:28:56, 19 December 2024)
- ML20043A978 + (21:28:56, 19 December 2024)
- ML20043A977 + (21:28:57, 19 December 2024)
- ML20043A974 + (21:28:58, 19 December 2024)
- ML20043A976 + (21:28:58, 19 December 2024)
- SNRC-1723, Advises That,Effective 900501,LJ Calone & Ja Notaro Will No Longer Need to Maintain Senior Operator Licenses + (21:29:00, 19 December 2024)
- ML20043A973 + (21:29:00, 19 December 2024)
- ML20043A971 + (21:29:03, 19 December 2024)
- ML20043A969 + (21:29:04, 19 December 2024)
- ML20043A966 + (21:29:05, 19 December 2024)
- AECM-90-0089, Forwards Draft Tech Specs for Power Distribution Limits,Rcs, ECCS & Plant Sys as Part of Util Involvement W/Bwr Owners Group as BWR-6 Lead Plant + (21:29:07, 19 December 2024)
- ML20043A964 + (21:29:09, 19 December 2024)
- NRC-90-0074, Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members + (21:29:10, 19 December 2024)
- ML20043A961 + (21:29:10, 19 December 2024)
- 05000333/LER-1990-015, :on 900420,discovered That Prerequisite Surveillance Test of source-range Monitors Not Performed Prior to Beginning Replacement of LPRMs on 900419.Caused by Procedure Deficiency.Lprm Procedure Revised + (21:29:11, 19 December 2024)
- TAC:76453 + (21:29:12, 19 December 2024)
- ML20043A959 + (21:29:13, 19 December 2024)
- IR 05000302/1990012 + (21:29:16, 19 December 2024)
- ML20043A954 + (21:29:18, 19 December 2024)
- ML20043A953 + (21:29:20, 19 December 2024)
- IR 05000348/1990009 + (21:29:23, 19 December 2024)
- ML20043A950 + (21:29:24, 19 December 2024)
- ML20043A949 + (21:29:28, 19 December 2024)
- ML20043A947 + (21:29:29, 19 December 2024)
- IR 05000413/1990009 + (21:29:38, 19 December 2024)
- ML20043A942 + (21:29:40, 19 December 2024)
- ML20043A936 + (21:29:41, 19 December 2024)
- ML20043A935 + (21:29:42, 19 December 2024)
- ML20043A933 + (21:29:43, 19 December 2024)
- 05000413/LER-1989-030-01, :on 890726,Tech Spec Violation Occurred Due to Shipment of Two Liners of Secondary Bead & Powdex Resin Mixture.On 891215,same Tech Spec Violation Occurred.Caused by Mgt Deficiency.Shipments Suspended + (21:29:44, 19 December 2024)
- ML20043A922 + (21:29:46, 19 December 2024)
- ML20043A921 + (21:29:47, 19 December 2024)
- ML20043A919 + (21:29:48, 19 December 2024)