Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044D245 + (18:31:42, 19 December 2024)
- ML20044D240 + (18:31:44, 19 December 2024)
- ML20044D238 + (18:31:45, 19 December 2024)
- ML20044D236 + (18:31:45, 19 December 2024)
- ML20044D235 + (18:31:46, 19 December 2024)
- ML20044D233 + (18:31:47, 19 December 2024)
- ML20044D234 + (18:31:47, 19 December 2024)
- ML20044D232 + (18:31:48, 19 December 2024)
- ML20044D230 + (18:31:49, 19 December 2024)
- LIC-93-0144, Advises That Util Revised Milestone Completion Date for PRA to 930831.Submittal of Completed PRA to NRC Still Scheduled by 931201.Milestone of 930501 for Completion of Final Level I/Ii/Iii Models Not Met Due to Modeling Complexities + (18:31:50, 19 December 2024)
- 05000339/LER-1993-003-02, :on 930424,manual Reactor Trip Initiated Due to Erratic Feedwater Flow Indications to SG C & Excessive Main Feedwater Regulating Valve Oscillations.Caused by Design Instabilities.Secondary Sys Secured + (18:31:53, 19 December 2024)
- ML20044D225 + (18:31:55, 19 December 2024)
- ML20044D219 + (18:31:59, 19 December 2024)
- 05000306/LER-1993-002-02, :on 930403,containment Isolation Valve Which Controls Reactor Makeup Water to Containment Exceeded Max Time for Closure.On 930413,lockwire & Safety Tag Removed. Caused by Communication Errors.Safety Tag Process Reviewed + (18:32:00, 19 December 2024)
- 05000306/LER-1993-002, Forwards LER 93-002-00 Re Loss of Administrative Control of Inoperable Containment Isolation Valve Due to Personnel Error.Process for Use of Safety Tags Being Reviewed & Revs Will Be Made,Where Needed + (18:32:02, 19 December 2024)
- ML20044D214 + (18:32:03, 19 December 2024)
- ML20044D211 + (18:32:04, 19 December 2024)
- 05000302/LER-1993-004, :on 930408,inappropriate Personnel Action Resulted in Degraded Class 1E Bus Voltage & Actuation of Edg.Licensee Established Addl Administrative Controls on Switchyard Activities + (18:32:06, 19 December 2024)
- ML20044D208 + (18:32:08, 19 December 2024)
- 05000457/LER-1993-002-10, :on 930414,unplanned ESF Actuation Occurred When All Four SI Accumulator Isolation Valves Closed & Accumulator Pressure Reduced.Caused by Mgt Deficiency. Training Will Be Conducted + (18:32:09, 19 December 2024)
- 05000301/LER-1993-003-01, :on 930328,Point Beach Unit 2 Tripped Due to Surveillance Testing Problems.Test Procedures Can Trip Unit Due to Equipment or Human Failure.Failure Tests Delayed Until Unit 1 & Knpp Restored to Power + (18:32:12, 19 December 2024)
- 05000333/LER-1993-008-01, :on 930412,identified That SJAE Radiation Monitor Had Increased.Caused by Failure to Identify Need to Obtain an Offgas Sample.Daily Instrument Surveillance Test Changed + (18:32:13, 19 December 2024)
- 05000298/LER-1993-011, :on 930308,max Differential Pressure Between Reactor Bldg & External Environ of -0.22-inches Water Gauge Exceeded TS Required Min.Caused by Lack of Loop Seal on Rupture Seal Drain Line.Seals Replaced + (18:32:15, 19 December 2024)
- HL-3256, Forwards Rev 11C to FSAR & Rev 8C to Fire Hazards Analysis for Ei Hatch Nuclear Plant Units 1 & 2,per 10CFR50.71 + (18:32:16, 19 December 2024)
- 05000266/LER-1993-004, :on 930408,employee Found Third Door to Unit 2 Containment Hatch Secured Open.Personnel Ignored Signs to Close Door While Refueling.Door Immediately Shut & Security Posted at Access.Fuel Procedures Modified + (18:32:19, 19 December 2024)
- ML20044D194 + (18:32:20, 19 December 2024)
- 05000213/LER-1992-005, :on 920212,discovered That 31-day Surveillance of Visual Insp of Fire Stations,Yard Fire Hydrants & Fire Hose Houses Not Performed in Jan.Caused by Personnel Error. Manual Tracking Methods Enhanced + (18:32:22, 19 December 2024)
- ML20044D192 + (18:32:24, 19 December 2024)
- ML20044D191 + (18:32:25, 19 December 2024)
- ML20044D190 + (18:32:26, 19 December 2024)
- ML20044D188 + (18:32:34, 19 December 2024)
- ML20044D187 + (18:32:35, 19 December 2024)
- ML20044D186 + (18:32:37, 19 December 2024)
- ML20044D185 + (18:32:44, 19 December 2024)
- ML20044D184 + (18:32:44, 19 December 2024)
- ML20044D182 + (18:32:45, 19 December 2024)
- ML20044D180 + (18:32:52, 19 December 2024)
- ML20044D177 + (18:32:53, 19 December 2024)
- ML20044D179 + (18:32:53, 19 December 2024)
- 05000352/LER-1987-028-01, :on 870610,hourly Fire Watch Required by TS 3.7.7 Not Performed Due to Personnel Error.Plant Security Organization Accepted Responsibility for Hourly Firewatch Patrol Required by Ts,Effective 930104 + (18:32:55, 19 December 2024)
- ML20044D174 + (18:32:57, 19 December 2024)
- ML20044D175 + (18:32:57, 19 December 2024)
- ML20044D170 + (18:32:59, 19 December 2024)
- ML20044D169 + (18:33:00, 19 December 2024)
- ML20044D168 + (18:33:00, 19 December 2024)
- ML20044D167 + (18:33:01, 19 December 2024)
- ML20044D166 + (18:33:01, 19 December 2024)
- 05000302/LER-1993-003, :on 930408,determined That Insufficient Instrument Error Considered When Operating Limits for Core Flood Tank Selected.Caused by Programmatic Deficiency.Alarm Bistables Reset & Allowed Margin Expanded + (18:33:03, 19 December 2024)
- ML20044D164 + (18:33:05, 19 December 2024)
- ML20044D162 + (18:33:06, 19 December 2024)
- ML20044D161 + (18:33:07, 19 December 2024)