ML20044D208

From kanterella
Jump to navigation Jump to search
Discusses 930330 Transmittal of Project Interface Documents 06-S-023,06-S-024 (Rev 1) & 06-S-025,indicating Documents Were Class 2 Changes Revising Vol 3 of Remedial Action Plan. Staff Suggests 06-S-024 Is Class 1 Change Needing Approval
ML20044D208
Person / Time
Issue date: 04/23/1993
From: Surmeier J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Chernoff A
ENERGY, DEPT. OF
References
REF-WM-62 NUDOCS 9305180232
Download: ML20044D208 (1)


Text

i

- Albert R. Chernoff, Project Manager Uranium Mill Tailings Remedial Action 4pg 2 31933 Project Office U.S. Department of Energy Alouquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Chernoff:

Your letter of March 30, 1993, transmitted copies of Project Interface Documents (PID) Numbered 06-S-023, 06-S-024 (Revision 1), and 06-S-025 and indicated that these were Class II changes revising Volume III of the Remedial Action Plan for stabilization of the inactive uranium mill tailings site at Rifle, Colorado. We concur that PID's 06-S-023 and 06-S-025 are Class II which do not require approval by the Nuclear Regulatory Commission staff.

However, we believe that PID 06-S-024 (Revision 1), which revises the cutoff liner, geotextile fabric, and sand bedding, should be Class I and requires NRC approval for the change. Based on this, NRC staff has reviewed this PID and concurs in the change as written.

You do not need to resubmit this PID.

l Although our concurrence is not needed for PID 06-S-23, an observation from our review should be brought to your attention.

If the drain material thickness in the vicinity of wells one and two is about 9" thick, as indicated l

in drawing RFL-DS-10-0731, then the specified screen openings of "one-half l

inch holes on six-inch centers" (RFL-DS-10-0732, Detail 3) may not provide adequate hydraulic communication for future monitoring or pumping.

If you have any questions regarding this review, please contact me at 301-504-3439 or the NRC Project Manager, Allan Mullins, at 301-504-2578.

Sincerely, r- -

John J. Surmeier, Chie

. At Clf:NthBT Uranium Recovery Branch l

Division of Low-level Waste Management and Decommissioning Office of Nuclear Material Safety and Safeguards cc:

S. Arp, DOE, Al S. Hamp, DOE, AL Mark?Ssall Bosesiin?ConEUFisnce'BlocKtoLDefihelDistFibUtibn Copp!Prsference!

2 In sniall"B6x~on~"0FCi" line"enthr: C = Cove' ~~ E ~= C6veM Enclosurs"N E No ' Copy r'

~

0FC LLUR c-LLUR._

C LLUR

,k NAME AMullins/D DGill M 0 f JSurmeierII DATE 4/7//93 B

4/7493 M

4/d/93f b

/ /93

/ /93 S:\\LLWMTYPE\\EDIE\\RIFL-PID.ATM OFFICIAL RECORD COPY In small Box on "DATE:" line enter: M = E-Mail Distribution Copy H = Hard Copy PDR : YES V

NO Category: Proprietary or CF Only ACNW: YES 1 NO Delete file after distribution Yes _X_ No _.

IG: YES NO

.,X_

j p

! O piff DISTRIBUTION:. Central File LLWM r/f PLohaus RBangart WBrach Mlayton DRom LJCallan,RIV RHall,URF0

/v JAustin NMSj g g g 9305180232 930423 i

PDR WASTE WM-62 PDR