ML20044D190
| ML20044D190 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 05/07/1993 |
| From: | Stewart Magruder Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| NUDOCS 9305170356 | |
| Download: ML20044D190 (4) | |
Text
'
-cM Y4 e
je Mcg?*
UNITED STATES f.[ i W [,j NUCLEAR REGULATORY COMMISSION
'"r WASHINGTON, D.C. 205W0001 0,
2 l
%d May 7, 1993 Docket No.52-002 1
MEMORANDUM FOR:
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, EDO A. Gody, Acting B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU:
Richard W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FP,0M:
Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (HUMAN FACTORS MEETING) i DATES & TIMES:
May 13, 1993 (10:15 a.m. - 5 p.m.)
May 14, 1993 (8 a.m. - 4:30 p.m.)
LOCATION:
ABB-Combustion Engineering Building 4 29 Griffin Road South Windsor, Connecticut 06095 PURPOSE:
Meeting to discuss design features review results and complete onsite followup regarding design features evaluation. A proposed agenda is enclosed.
1100As
- npo ' n e ~;:7:q (Cay 9305170356 930507 I
~
~~
PDR ADOCK 05200002
,o l,
A PDR e
- l
i I
t May 7, 1993 j
PARTICIPANTS *:
NRC ABB-CE G. West D. Harmon l
et al.
l
}
RNL i
1 W. Stubler l
J. Higgins
~j i
(Original signed by T. V. Wambach for) l Stewart L. Magruder, Project Manager Standardization Project Directorate l
Associate Directorate for Advanced Reactors U
and License Renewal Office of Nuclear Reactor Regulation l
Enclosure:
i Meeting Agenda cc w/ enclosure:
See next page L
- Meetings between the NRC technical staff and applicants or licensees. are 1
i open for interested members of the public, petitioners, intervenors, or
'l other parties to attend.as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the j
s,ublic who wish to attend should contact me at (301)- 504-3139.
i DISTRIBUTION:
1 Docket File PDST R/F SBajwa,12G18 MXFranovich PDR JNWilson TVWambach' RBorchardt PShea OPA EJordan, MNBB 3701 GGrant, E00 j
ACRS (11), w/o encl.
RPerch, 801 NRR Mailroom,12G18 P0' Dell, PTSB i
JMoore, 15B18 J0'Brien RES CMcCracken, 801 GWest, 10D24 MPratt,1E4
.l
'I 0FC:
LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR n i n, <
r,
,, s PSheV/h {t[a'g/uder':
M$'ssfg NAME:
1z DATE: 05/7 /93
(
05/9/93 05/9/93 l
0FFICIAL DOCUMENT COPY: CEHFMTG.5LM f
i
ABB-Combustion Engineering, Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330
-l Rockville, Maryland 20852 I
F Mr. Stan Ritterbusch Nuclear Systems Licensing
{
ABB-Combustion Engineering, Inc.
i 1000 Prospect Hill Road
[
Post Office Box 500 Windsor, Connecticut 06095-0500
.j Mr. Sterling Franks U. S. Department of Energy HE-42 i
l Washington, D.C.
20585 Mr. Steve Goldberg
~
Budget Examiner j
725 17th Street, N.W.
j Washington, D.C.
20503 j
i Mr. Raymond Ng 1776 Eye Street, N.W.
i Suite 300 i
Washington, D.C.
20005 i
Joseph R. Egan, Esquire l
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C.
20037-1128
{
Mr. Regis A. Matzie, Vice President j
Nuclear Systems Development ABB-Combustion Engineering, Inc.
!1 1000 Prospect Hill Road Post Office Box 500 i
Windsor, Connecticut 06095-0500 j
'[
t t
f
e Agenda System 80+
Human Factors Meeting May 13 and 14, 1993 Thursday. May 13. 1993 10:15 - 10:30
Introductions
10:30 - 12:30 Discuss Results of Onsite Design Features Evaluation 12:30 - 01:30 Lunch 01:30 - 03:00 Discuss Results of Desktop Review of Design Features 03:00 - 05:00 Onsite Design Features Followup Friday. May 14. 1993 08:00 - 11:00 Continue Onsite Design Features Followup 11:00 - 12:30 Complete Onsite Evaluation of Open HSI Issues from DSER 12:30 - 01:30 Lunch 01:30 - 04:00 Discuss Task Analysis Submittal 04:00 - 04:30 Wrapup Discuss schedule i
Enclosure 1
_ - _ - _ - _ _ _ - _ _ - _ _ _ _ _ - _.