Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045H849 + (15:33:51, 19 December 2024)
- ML20045H848 + (15:33:52, 19 December 2024)
- IR 05000324/1993020 + (15:33:53, 19 December 2024)
- ML20045H843 + (15:33:55, 19 December 2024)
- ML20045H838 + (15:33:57, 19 December 2024)
- ML20045H835 + (15:33:59, 19 December 2024)
- ML20045H833 + (15:34:00, 19 December 2024)
- TAC:M86696 + (15:34:01, 19 December 2024)
- HL-3397, Responds to NRC 930626 Request for Addl Info Re Thermal Ceramics FP-60 Fire Barrier Matl Installed at Facility. FP-60 Fire Master Blanket Equivalent Substitute for Kaowool Fire Master Blanket Based on Listed Discussion + (15:34:02, 19 December 2024)
- ML20045H827 + (15:34:04, 19 December 2024)
- ML20045H824 + (15:34:06, 19 December 2024)
- ML20045H823 + (15:34:07, 19 December 2024)
- ML20045H819 + (15:34:08, 19 December 2024)
- ML20045H815 + (15:34:08, 19 December 2024)
- ML20045H811 + (15:34:09, 19 December 2024)
- ML20045H805 + (15:34:10, 19 December 2024)
- ML20045H803 + (15:34:11, 19 December 2024)
- ML20045H800 + (15:34:12, 19 December 2024)
- ML20045H797 + (15:34:13, 19 December 2024)
- ML20045H795 + (15:34:14, 19 December 2024)
- ML20045H792 + (15:34:15, 19 December 2024)
- ML20045H789 + (15:34:16, 19 December 2024)
- ML20045H782 + (15:34:17, 19 December 2024)
- ML20045H778 + (15:34:17, 19 December 2024)
- JPN-93-051, Forwards 1993 FSAR Update for Ja FitzPatrick Nuclear Power Plant, Containing Annual Update of QA Program Description + (15:34:18, 19 December 2024)
- ET-NRC-93-3926, Forwards Nonproprietary & Proprietary AP600 Testing Repts, WCAP-13414,WCAP-13415,WCAP-13419,WCAP-13420,WCAP-13756 & WCAP-13757.Affidavit for Withholding Encl.Proprietary Repts Withheld,Per 10CFR2.790.Proprietary Rept WCAP-13413 Encl + (15:34:20, 19 December 2024)
- BSEP-93-0110, Forwards Response to NRC 930507 Request for Addl Info Re GL 92-01, Reactor Vessel Structural Integrity. Calculation Change in nil-ductility for 32 EFPY Listed + (15:34:22, 19 December 2024)
- ML20045H765 + (15:34:25, 19 December 2024)
- ML20045H764 + (15:34:27, 19 December 2024)
- 05000445/LER-1993-007, :on 930626,CR Alarm Received,Indicating Excessive Temp on Reactor Coolant Pump Motor Stator 1-04 & Manual Trip Initiated.Caused by RTD Failure.Rtd Terminations Disconnected & AOP Revised + (15:34:28, 19 December 2024)
- ML20045H759 + (15:34:30, 19 December 2024)
- ML20045H756 + (15:34:31, 19 December 2024)
- ML20045H754 + (15:34:31, 19 December 2024)
- ML20045H753 + (15:34:32, 19 December 2024)
- ET-NRC-93-3918, Forwards Nonproprietary & Proprietary WCAP-13759 & WCAP-13758, High Inertia Rotor Test Phase 3 Rept. Affidavit for Withholding Encl.Proprietary Rept Withheld,Per 10CFR2.790 + (15:34:33, 19 December 2024)
- ML20045H750 + (15:34:35, 19 December 2024)
- ML20045H745 + (15:34:45, 19 December 2024)
- 05000321/LER-1993-012, :on 930615,automatic Reactor Scram & Isolation of Inboard Group 2 PCIS Valves Occurred.Caused by Loose Packing Nut on Instrument Isolation Valve.Valve Repaired & Similar Installations on Units Checked + (15:34:46, 19 December 2024)
- ML20045H743 + (15:34:47, 19 December 2024)
- NG-93-2771, Documents Util Response to Questions Raised by NRC in 930628 Telcon Re Acceptability of Interruptible Power Supplies to Certain Containment Isolation Valve Position Indications,Per Reg Guide 1.97 + (15:34:48, 19 December 2024)
- ML20045H741 + (15:34:53, 19 December 2024)
- ML20045H740 + (15:34:54, 19 December 2024)
- ML20045H737 + (15:34:56, 19 December 2024)
- ML20045H736 + (15:34:58, 19 December 2024)
- ML20045H735 + (15:34:59, 19 December 2024)
- ML20045H733 + (15:35:01, 19 December 2024)
- ML20045H730 + (15:35:02, 19 December 2024)
- TAC:M76792 + (15:35:03, 19 December 2024)
- ML20045H725 + (15:35:04, 19 December 2024)
- ML20045H721 + (15:35:06, 19 December 2024)
- SNRC-2092, Responds to NRC Re Violations Noted in IR 50-322/93-02 on 930506-07.C/As:one or More Load Tests of Jib Crane Lifting Device Will Be Conducted Away from Sfsp to Confirm Device Capable of Safely Lifting Weight of Crane + (15:35:06, 19 December 2024)