Text
- - _ _ -
t Socramento Municipal Utility District 3
Rancho Seco Nuclear Station i
RP Responder OJr Check Sheet Approval
)
l
_ILP RESPONDER i
OUALIFICATION DOCUMENTATION REVISION 0 Trainee Name
-tt.cu.~~ Cl MA% k'6ckq3 Prepared By Date Reviewed By~~
~
Me au h bate' RP Operations Superintendent
-i 4AV/ah
,/7/c7; dpproved By Da'te Operations Manager 4-h-97 l
Approved By Date i
Nuclear RP/ EM/ EP/ Chemistry Manager i
l 9307210198 930712 T3 ADOCK 0500 Q2 Page 'l of 40
.{
DR-
t-Sacramento Municipal Utiftty District Rancho Seco Nuclear Station ~
RP Responder OJT Check Sheet Approval
+
RADIATION RESPONSE PERSONNEL QUALIFICATION OBJECTIVEE i
Qualification under this program allows personnel to respond to non-routine radiological events. - These events are those which require:
1.
Immediate attention by onsite personnel and i
2.
An evaluation for the assistance of additional offsite personnel to implement additional actions.
Qualification for the specific tasks shall be done with a through 1
understanding of the applicable procedure (s). Tasks shall be completed as " hands-on" evolution's as much as practical with the actual equipment.
Listed with each task are objectives that shall be included in the qualification process. These objectives are considered to be a minimum for successful completion of the indicated task. Also included with each task description is a reference to the controlling procedure (s) which' were used as guidance for the RP Responder procedure, RP-305-40.
These referenced procedures shall be used for instructions regarding..
the complete requirements for each task.
Verbal walk-throughs should be avoided. _ Personnel conducting the -
task evaluations shallinsure the qualification process covers all-aspects of the indicated task.
j Page 2 of 40
...=
i Socramento Municipal Utility District i
Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval q
1 RADIATION RESPONSE PERSONNEI OUALIFICATION OUALIFICATION TOPICS:
?
i Radiation Pmtection Radiological Contamination a
Instrumentation Control Radiacs Personnel Monitoring I
Air Sampling Eqmpment Personnel Contamination Monitors Decontamination Hot Particle Control 4
Large Area Surveys Radiation Protection Support Dosimetry i
Emergencv Response Abnormal Dosimetry Teams Emergency Plan Fire Brigade requirements 1
Off-site fire suppression j
personnel Effluents Sampling '
Area Posting Airborne Liquid j
1 Page 3 of 40 y
I Sacramento Municipal Utility District l
Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name I.
RADIATION PROTECTION INSTRUMENTATION A.
OBJECTIVES 1.
Operate portable radiation dose rate instruments.
a.
Preoperational checks (daily prior to use) b.
Source checks (daily prior to use) c.
Calibration due date d.
Range selection e.
Response times f.
Betal Gamma window g.
Beta correction factor h.
Geotropic effects i.
Energy response 2.
Operate portable count rate instruments a.
Preoperational checks (daily prior to use) b.
Source response check (daily prior to use) c.
Calibration due date d.
Documentation 3.
Contamination Monitors a.
Source check for PCM-1B (daily) b.
Source check for Gamma-10 (daily) 4.
Operate portable low volume air sampling equipment a.
Set-up of sampling head b.
Operation c.
Calibration due date d.
Volume calculations e.
Determining location for representative air sample l
Page 4 of 40
n Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name P
I.
RADIATION PROTECTION INSTRUMENTATION Trainer Evaluator Method Signature /
Signature / (P or W)
Date Date B.
TASKS:
Instrumentation 1
1.
Dose rate instrument; RO-2 a.
Preoperational Checks (daily prior to use)
(RP.311.II.01, section 6.1) l I
b.
Source Check (daily prior to use)
(RP.311.VI.02, section 6.2) l I
c.
Oper'ation (RP.311.II.01, section 6.2) l I
Page 5 of 40
. d
\\
l Socramento Municj ol Utility District p
Rancho Seco Nuclear Station
-l RP Responder OJT Check Sheet Approval
.l u
l OBJECTIVES / TASKS i
Trainee Name y
5 I.
RADIATION PROTECTION INSTRUMENTATION Trainer Evaluator Method i
Signature /
Signature / (P or W)
Date Date B.
TASKS:
Instrumentation (continued) i 2.
Portable count rate meters; RM-14 / Ludlum-177 a.
. Pre-operational Checks (daily prior j
to use) l (1)
RM 14 (RP.311.I.01, section 6.1) l I
. l (2)
Ludlum-177 (RP.311.I.02,
'I.
section 6.1) l b.
Source Checks l
(daily prior to use)
(1)
- RM-14 (RP.311.VI.02, l
section 6.3) l I
(2)
Ludlum 177 (RP.311.VI.02, section 6.3)
I I
-i
.1 Page 6 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS i
Trainee Name I.
RADIATION PROTECTION INSTRUMENTATION P
Trainer Evaluator - Method '
Signature /
Signature / (P or W)
-i Date Date B.
TASKS:
Instrumentation (continued) 2.
Portable count rate meters; RM-14 / Ludlum-177 c.
Operation l
(1)
RM-14
.{'
(RP.311.I.01, section 6.2)
I
'l
.1 (2)
Ludlum-177
. (RP.311.I.02, section 6.2)
I l
3.
Contamination Monitors; i
PCM 1B / Gamma-10 l
a.
Daily Source Check (1)
PCM-1B (RP.311.VI.02, section 6.4) 1 I
(2)
Gamma 10 (RP.311.VI.02, section 6.5)~
l I
i i
Page 7 of 40 i
.,,-m.,
~
]
Socramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval
[
OBJECTWES/ TASKS Trainee Name i
I.
RADIATION PROTECTION INSTRUMENTATION Trainer Evaluator Method -
2 Signature /
Signature / (P or W)
Date Date B.
TASKS:
Instrumentation (continued) 4.
Portable low volume air sampling equipment (H-809V-1) a.
Sample head set-up -
(RP.311.III.04 section G.1) 1 I
i b.
Operation (RP.311.III.04 section G.2) l I
e c.
Sample volume calculations l
l d.
Documentation (RP.305.80 section 6.5.1 and 6.5.2) i I-
.l Page 8 of 40
l Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder Off Check Sheet Approval-1
_O_ EJECTIVES / TASKS Trainee Name 3
II.
RADIATION PROTECTION SUPPORT A.
OBJECTIVES 1.
Respond to a fire to provide radiological support for on site Fire Brigade or off site fir ~ suppression personnel.
e a.
Dose rate surveys b.
Airborne activity considerations (low volume air sample) c.
Dose evaluations for team members 2.
Respond as a radiological emergency team member to an Unusual Event or Alert Emergency / Drillin accordance with EPIP-5305 a.
Dose rate surveys b.
Dose evaluations for team members c.
. Dosimetry requirements 1)
On-site support 2)
Off-site support d.
Airborne activity considerations (low volume air sample) _
s 3.
Set up a controlled area (non routine or declared Emergency) a.
Posting requirements 1)
Radiation areas 2)'
Contaminated areas 3)
Airborne areas b.
Signs / barrier materials 1
1)
Locations a
Page 9 of 40
=
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder Off Check Sheet Approval QBJECTIVES/ TASh3 Trainee Name II.
RADIATION PROTECTION SUPPORT B.
TASKS:
Radiological Support Trainer Evaluator Method Signature /
Signature / (P or W)
Date Date 1.
Radiological Support for Fire Brigade / Emergency Team / Off site fire suppression personnel.
(EPIP-5305) a.
Dos., ate surveys / dose evaluations for response teams.(Fire Brigade / EP) l I
b.
Airborne activity considerations.
(low volume air sample RP.305.8C, section G.2.2 collection cidample) l I
c.
Dosimetry requirements for on site support.
(RP.312.I.14, EPIP-5360) l I
d.
Dosimetry requirements for off site support.
(EPlP-53GO) i I
Page 10 of 40
I J
Socramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name II.
RADIATION PROTECTION SUPPORT B.
TASKS:
Radiological Support
~
Trainer Evaluator Method Signature /
Signature / (P or W).
Date Date 1
1.
Radiological Support for Fire Brigade / Emergency Team' Off-site fire suppression personnel.
(EPIP-5305)
(continued) e.
Response actions for radiological support of the on site Fire Brigade.
(Drill scenario format) l l
I f.
Response actions for radiological support of off site fire suppression personnel.
. 1 I
(Drill scenario format) r i
I Page 11 of 40 5
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name II.
RADIATION PROTECTION SUPPORT B.
TASKS:
Radiolorkal Support Trainer Evaluator Method Signature /
Signature / (P or W)
Date Date 1.
Radiological Support for Fire Brigade / Emergency Team / Off site fire suppression personnel.
(EPIP-5305)
(continued) g.
Response actions for radiological support for a declared Emergency Plan U'nusual Event.
(Drill scenario format) l I
h.
Response actions for radiological support for a declared Emergency Plan Alert.
(Drill scenario format)
I l
Page 12 of 40
Socramento Municipal Utility District Rancho Seco Nuclear Station
' RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS i
Trainee Name II.
RADIATION PROTECTION SUPPORT B.
TASKS:
Radiological Support Trainer Evaluator Method Signature /
Signature / (P or W)
Date Date 2.
Controlled area posting (non-routine and/
or Emergency) a.
Radiation areas (RP.305.7, section 3.11,6.1, and 6.2) l l
b.
Contaminated areas (RP.305.7, section 3.12,0.1, and 6.7)
I i
c.
Airborne areas (RP.305.7, section 3.2,6.1, and 6.9) i I
~ +
d.
Location of posting materials (EPIP-5GG0) l 1
i l
I l
Page 13 of 40 i
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name -
f III.
RADIOLOGICAL CONTAMINATION CONTROL A.
OBJECTIVES 1.
Monitor workers exiting controlled area 1
2.
Respond to a portal alarm at the Restricted Area (Industrial Area) exit 3.
Monitor workers exiting Hot Partide Zones (HPZ) (work in HPZ will be scheduled during normal working hours when Chem /
Rad Decommissioning Technicians are available) a.
Perform personnel hot partide contamination
-t survey of outer protective dothing 4.
Decontaminate personnel and document results a.
Hot Particle Contamination t
1.)
Locate partide and remove 2.)
Removal techniques 3.)
Documentation (time, location, cpm, etc.).
4).
Perform Seld dose calculations of suspected hot partide b.
Non-Hot Particle contamination c.
Facial contamination Page 14 of 40
1 Socramento Municipal Utility District Rancho Seco Nuclear Station RP ResponderOJTCheckSheet Approval l
J OBJECTIVES / TASKS Trainee Name t
III.
RADIOLOGICAL CONTAMINATION CONTROL A.
OBJECTIVES (continued) 4.
Decontaminate personnel and document results d.
Noble Gas contamination e.
Documentation of contamination 5.
Provide radiological coverage of contaminated and/ or injured person (s) during emergency / drill 6.
Perform large area surveys (LAS) of walkways and stairwells.
Surveys will be conducted to evaluate the effectiveness of contamination control during the back shifts, weekends, and-holidays. Surveys will be conducted in the " street clothes area -
of the radiological controlled area (RCA) on a daily frequency.
i i
i Page 15 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval RBJECTIVES/ TASKS Trainee Name III.
RADIOLOGICAL CONTAMINATION CONTROL B.
TASKS:
Personnel Monitoring /
Decontamination Trainer Evaluator Method Signature / Signature /
(P or %9 Date Date 1.
Exiting Controlled Area (RP.305.9B, section 6.4) l I
2.
Portal alarms (Site Exit Point)
(RP.305.9B section 6.5) l l
3.
Hot Particles Zone Monitoring (contact RP after initial action, RP.305.9E, section 6.3) a.
Contamination survey for exiting Hot Particle Zone (RP.305.9E, section G 3) l i
1 Page 16 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name III.
RADIOLOGICAL CONTAMINATION CONTROL B.
TASKS:
(Continued)
Personnel Monitoring /
Decontamination Trainer Evaluator Method Signature / Signature /
(P or W)
Date Date 4.
Personnel decontamination (contact RP after initial action, RP.305.9D, section 1.0 to 6.2) a.
Hot particles (RP.305.9D, section 6.2) l I
b.
Field dose readings (RP.305.9D, section G.12) l I
c.
Non-Hot Particle contamination (RP.305.9D, section G.4)
I l
d.
Facial contamination; nose, mouth, eye (RP.305.9D, section 6.5 to G.8)
I I
Page 17 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name III.
RADIOLOGICAL CONTAMINATION CONTROL B.
TASKS:
(Continued)
Personnel Monitoring /
Decontamination Trainer Evaluator Method Signature / Signature /
(P or %)
Date Date 4.
Personnel decontamination (contact RP after initial action, RP.305.9D, section 1.0 to 6.2) e.
Noble Gas Contamination; radon daughters, naturally occurring (RP.305.9D, section 6.11) l I
f.
Documentation (RP.305.9D, RAD-79 and RAD-80) l I
1 5.
Contaminated / injured personnel coverage; contact RP after initial action (EPIP-5330, section 5.3) l 1
Page 18 of 40
=.
Sacramento Municipal Utility District.
Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name 4
t III.
RADIOLOGICAL CONTAMINATION CONTROL B.
TASKS:
(Continued)
Personnel Monitoring /
Decontamination Trainer Evaluator Method Signature / Signature /
(P or W)
~ Date Date-G.
Large Area Surveys (LAS) a.
Location and frequency (RP.305.40, i
section 8.4.2) 1 I
b.
Coundng l
Techniques (RP.305.40, section 8.4.4) l I
c.
Documentation /
NotiEcation of results (RP.305.40, i
section 8.4.5 and 8.4.6) l I
s i
Page -19 of 40
Socramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval
' OBJECTIVES / TASKS i
Trainee Name -
1 IV.
DOSIMETRY l
t A.
OBJECTIVES l
1.
Initiate Abnormal Dosimetry Report f
- a. Contact RP and document event 2.
Issue Emergency Dosimetry (TLD's) to offsite support and I
response agencies. (Fire Suppression, Ambulance, Paramedic, Life Flight personnel) e t
i s
I i
l l
Page 20 of 40
Sacramento Municipal Utility DisMet Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OB.JECTIVES/ TASKS Trainee Name IV.
DOSIMETRY B.
TASKS:
Personnel Dosimetry Trainer Evaluator Method Signature / Signature /
(P or W)
Date Date 1.
Abnormal Dosimetry Report (RP.312.I.13, section G.1 and RAD-167) 1 I
2.
Emergency Dosimetry (EPIP-5220)
I I
9 Page 21 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval 1
OBJECTIVES / TASKS Trainee Name
.t V.
EFFLUENTS SAMPLING A.
OBJECTIVES 1.
Obtain Auxiliary Building Stack samples i
a.
Initiate and document alternate particulate sampler when continuous sampler is out of service.
1)
Within one hour 2)
Hourly fuse check b.
Time constraints of sampling and notifications required q
2.
Obtain Auxiliary Building Grade Level Vent (Radwaste Area -
Vent) samples a.
Initiate and document alternate particulate sampler when
~'
continuous sampler is out of service b.
Time constraints of sampling and notifications required -
-I 3.
Obtain Reactor Building Stack samples.
a.
Initiate and document alternate particulate sampler when
-i continuous sampler is out of service -
b.
Time constraints of sampling and notifications required Page 22 of 40
)
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval '
OBJECTIVES / TASKS Trainee Name -
f V.
EFFLUENTS SAMPLING A.
OBJECTIVES (continued) 4.
Obtain IOS Building Vent samples a.
Initiate and documer t alternate particulate sampler when continuous sampler is o,ut of service i
b.
Time constraints of sampling and notifications required i
i 5.
Obtain Plant Efiluent samples when high efDuent activity suspected or R15017A causes divert and document on divert.
a.
Time constraints of sampling and notifications required
.i i
t
(
Page 23 of 40 f
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS f
Trainee Name V.
EFFLUENTS SAMPLING B.
TASKS:
Sample Collection Trainer Evaluator Method l
Signature / Signature /
(P or W).
Date Date 1.
Auxiliary Building a.
Alternate Particulate sample (CAP-009, section 6.4.1 and CIB1-1000, section 5.4 and i
6.6)
I I
b.
Document samples and j
complete required notification (CIni-5109 and form CIBI-088) i I
f i
4
[
i y
i Page 24 of 40 t
Sacramento Municipal Utility District Rancho Seco Nuclear Station i
RP Responder OJT Check Sheet Approval i
OHJECTIVES/ TASKS
{
Trainee Name V.
EFFLUENTS SAMPLING i
i B.
TASKS:
Sample Collection (continued)
Trainer Evaluator Method Signature / Signature /
(P or W)
Date Date 2.
Auxiliary Building Grade Level Vent madwaste Area Vent) a.
Alternate Particulate sample
]
(CAP-009, section 6.4.1 and CHM-1000, section 5.4 and 6.6) i I
b.
Document samples and complete required notification (CHM-5109 and form CHM-088)
I I
-l 1
1 Page 25 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station.
RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name V.
EFFLUENTS SAMPLING B.
TASKS:
Sample Collection (continued)
Trainer Evaluator Method Signature / Signature /
(P or W)
Date Date 3.
Reactor Building a.
Alternate Particulate sample (CAP-009, section 6.4.1 and CIBI-1000, section 5.4 and 6.6) l l
b.
Document samples and complete required notification (CIBI-5109 and form CIBi-088) l l
R a
l 4
i i
'l Page 26 of 40 i
1
Sacramento Municipa'l Utility District Rancho Seco Nuclear Station RP Responder OTT Check Sheet Approval I
i i
~!
DBJECTIVES/ TASKS Trainee Name
-j i
V.
EFFLUENTS SAMPLING i
B.
TASKS:
i Sample Collection (continued)
Trainer Evaluator Method
-i Signature / Signature /
(P or W),
Date Date i
4.
IOS Building Vent a.
Alternate i
Particulate sample (CHM-1000, section 6.6) 1 I
b.
Document samples and complete required notification 1
(CHM 5109
-[
and form CIBi-088)
I 1
~)
2.
f Page 27 of 40
.j Sacramento Municipal Utility District j
Rancho Seco Nuclear Station j
RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS I
Trainee Name
.i V.
EFFLUENTS SAMPLING l
B.
TASKS:
-i Sample Collection (continued)
Trainer Evaluator Method Signature / Signature /
(P or W) l Date Date -
5.
Plant EfDuent a.
Grab sample (CHM-1005, section G.7.16)
I I
b.
Document samples and complete i
required notification (CHM-5109,
- section G.1 to j
G.1, and G.3) 1 I
t i
I Page 28 of 40
~
l I
Sacramento Municipal Utility District
)
Rancho Seco Nuclear Station i
RP Responder OJT Check Sheet Approval l
OBJECTIVES / TASKS Trainee Name VI.
FINAL QUALIFICATION AND REVIEW A.
Final qualification will be determined by a review by second level RP Supervision of the task qualifications and ' raining requirements completed.
B.
After successful completion of this review, an cral evaluation will be conducted to determine overall knowledge level of the trainee. The oral evaluation shallinclude a walk through and examination of a representative selection of the following topics to determine the trainee's ability to perform the required tasks.
Radiation Protection Instrumentation Radiation Protection Support Radiological Contamination Support Dosimetry Efiluents Sampling The oral evaluation will be conducted by RP Supervision designated by the RP Manager.
C.
After successful completion of the second level RP Supervision review and the oral examination the RP Manager will review the completed qualification documentation and determine if all required qualification has been completed. When this review is completed the initial task based qualification and trainingis completed.
Page 29 of 40
9 Sacramento Municipal Utility District Rancho Seco Nuclear Station '
RP Responder OJT Check Sheet Approval-OBJECTIVES / TASKS Trainee Name f
VII.
REVIEW APPROVALS l
A.
Second Level RP Supervision Review l
Reviewed By
-Date q
B.
Oral Examination / Walk through Completed -
l Reviewed By Date j
Reviewed By Date C.
RP Management j
l Reviewed By Date-i i
Page 30 of 40 h..
sa -
Socramento Municipal Utility District Rancho Seco NuclearStation RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name VIII. RETRAINING TASK EVALUATION e
A.
Task Evaluation After initial qualification a task evaluation shall be conducted to ensure all tasks are evaluated on a annual (z25%) basis. Evaluation of-the task should include an oral evaluation to determine technical knowledge of the task requirement and a performed walk through of the task. The walk through of the task is to evaluate the performance -
level for instrumentation and documentation requirements.
Additional task evaluations may be assigned as determined necessary -
by RP or Operations Supervision i
B.
Documentation 1
Completed task evaluations shall be recorded on the Task Evaluation' Sheet (Attachment 1).
- 'l C.
Records
]
Completed Task Evaluation Sheets shall be submitted to records as part of the completed qualification training documentation.
-)
i i
Page 31 of 40
Sacram:nto Municipal Utility District Rcncho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name ATTACHMENT 1 Task Evaluation Sheet Page 1 Of 9 Year Task Number Task Subject Evaluated Date Comments By I.B.1.a Dose rate instrument / pre op checks I.B.1.b Dose rate instrument /
soure.e checks I.B.1.c Dose rate instrument /
operation I.B.2.a.1 Count rate instrument (RM-14)/ pre op checks I.B.2.a.2 Count rate instrument (Ludlum-177)/
pre op checks I.B.2.b.1 Count rate instrument (RM-14)/ source check I.B.2.b.2 Count rate instrument (Ludlum-177)/
source check Page 32 of 40
Sacromonto Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name ATTACHMENT 1 Task Evaluation Sheet Page 2 of 9 Year Task Number Task Subject Evaluated Date
-Comments By I.B.2.c.1 Count rate instrument (RM-14)/
operation j
I.B.2.c.2 Count rate l
instrument (Ludlum-177/
operation I.B.3.a.1 Daily source' check (PCM-1B)
LB.3.a.2 Daily source check (Gamma-10)
I.B.4.a Air sampler /
Sample head set up I.B.4.b Air sampler /
operation I.B.4.c Air sampler /
Sample volume calculations i
Page 33 of 40
4 Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval
~
OBJECTIVES / TASKS Trainee Name ATTACHMENT 1 Task Evaluation Sheet Page 3 of 9 Year Task Number Task Subject Evaluated -
Date Comments By I.B.4.d Air sampler /
Documentation II.B.I.a Dose rate surveys for -
response teams II.B.1.b Airborne activity 4
considerations II.B.I.c Dosimetry requirements for
'I onsite support II.B.I.d Dosimetry j
requirements for off site support
' II.B.2.a Controlled area posting /
j radiation areas j
1 Page 34 of 40
.l a
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name ATTACHMENT 1 Task Evaluation Sheet Page 4 of 9 Year Task Number Task Subject Evaluated Date Comments By II.B.2.b Controlled area posting /
contaminated areas II.B.2.c Controlled area posting / airborne areas II.B.2.d Controlled area posting / location ofposting materials III.B.1 Exiting controlled areas III.B.2 Portal alarms III.B.3.a Hot particle zone monitoring /
contamination survey for exiting l
Page 35 of 40
Sacramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJECTIVES / TASKS Trainee Name i
ATTACIIMENT 1 Task Evaluation Sheet Page 5 of 9 Year
-t Task Number Task Subject Evaluated Date
- Comments By III.B.4.a Personnel-decontamination /
hot particles III.B.4.b Personnel decontamination /
field dose readings III.B.4.c Personnel decontamination /
non-hot particle contamination III.B.4.d Personnel decontamination /
facial contamination III.B.4.e Personnel decontamination /
noble gas III.B.4.f Personnel i
decontamination /
documentation -
P Page 36 of 40
~
~
- .1 i
i i
Sacramento Municipal Utility District i
Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval
- li 1
OBJECTIVES / TASKS Trainee Name ATTACHMENT 1 j
Task Evaluation Sheet PageBof9 Year Task Number Task Subject Evaluated Date Comments By III.B.5 Contaminated /
injured personnel coverage III.B.G.a Large Area Survey / Location and frequency III.B.G.b Large Area Survey / Counting Technique III.b.G.c Large Area Survey /
Documentation and NotiEcation IV.B.1 Abnormal dosimetry report IV.B.2 Emergency dosimetry Page 37 of 40
.l Sacramento Municipal Utility District Rancho Seco Nuclear Station-i RP Responder OJT Check Sheet Approval l
OBJECTIVES / TASKS
-[
Trainee Name 3
ATTACHMENT 1 Task Evaluation Sheet Page 7 of 9 Year
. Task j
Number Task Subject Evaluated -
Date Conunents
.i By V.B.I.a Aux Bldg./
Alternate particulate sample V.B.1.b Aux Bldg./
Document samples and complete required notification V.B.2.a Aux Bldg. Grade g
Level Vent /
Alternate particulate sample -
i V.B.2.b Aux Bldg. Grade Level Vent /
Document j
samples and '
complete ~
required j
notification Page 38 of 40
.. ~. -
.. I
Socramento Municipal Utility District Rancho Seco Nuclear Station RP Responder OJT Check Sheet Approval OBJE_CTIVFJ/ TASKS Trainee Name ATTACHMENT 1 Task Evaluation Sheet Page 8 of 9 Year Task Number Task Subject Evaluated Date Conunents By V.B.3.a Reactor Bldg./
Alternate particulate sample V.B.3.b Reactor Bldg./
Document samples and complete required notification V.B.4.a IOS Bldg. Vent./
Alternate particulate sample V.B.4.b IOS Bldg. Vent /
Document samples and complete required notification V.B.5.a Plant Eff. grab sample Page 39 of 40
n
?
Socramento Municipal' Utility District-Rancho Seco Nuclear Station RP Responder OTT Check Sheet Approval OBJECTIVES / TASKS Trainee Name i
ATTACHMENT 1 Task Evaluation Sheet Page 9 of 9 Year 1
Task Number Task Subject Evaluated Date Conunents By V.B.5.b Plant Eff/
Document samples and complete required notification s
t Page 40 of 40
-