- ML20053B762 + (09:01:31, 18 December 2024)
- ML20053B760 + (09:01:32, 18 December 2024)
- 05000348/LER-1982-016-03, /03L-0:on 820403,pressurizer Level Indicator LI- 459Z on Hot Shutdown Panel Declared Inoperable.Caused by Faulty Transmitter Amplifier Card.Card Replaced & Instrumentation Channel Returned to Svc + (09:01:34, 18 December 2024)
- 05000348/LER-1982-016, Forwards LER 82-016/03L-0 + (09:01:36, 18 December 2024)
- ML20053B755 + (09:01:37, 18 December 2024)
- ML20053B754 + (09:01:38, 18 December 2024)
- 05000325/LER-1982-038-03, /03L-0:on 820419,reactor Scrammed Due to Opening of 125-volt Battery Charger Output Breaker While Removing Electrical Clearance on Div II Battery.Caused by Operator Error.Breaker Reclosed & Power Restored to 1B-1 Bus + (09:01:40, 18 December 2024)
- ML20053B751 + (09:01:41, 18 December 2024)
- AECM-82-223, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re O Ring Seals on Rosemount Transmitters, Initially Reported 820421.Lubrication Procedure Written. Unit 2 Final Rept by 821029.Also Reported Per Part 21 + (09:01:43, 18 December 2024)
- AECM-82-226, Interim Deficiency Rept 1 Re Corroded Terminal Boards on Pressure,Flow & Level Transmitters Utilized in safety- Related Applications,Initially Reported 820421.Definite Corrective Actions Not Formulated.Final Rept by 820806 + (09:01:50, 18 December 2024)
- 05000260/LER-1982-014-03, /03L-0:on 820420,HPCI Sys Made Inoperable for Calibr of Speed Sensing & Control Circuits W/O Performing Surveillance Tests.Caused by Personnel Error in Failing to Determine Inoperability + (09:01:56, 18 December 2024)
- ML20053B743 + (09:01:58, 18 December 2024)
- ML20053B740 + (09:02:01, 18 December 2024)
- 05000260/LER-1982-014, Forwards LER 82-014/03L-0 + (09:02:03, 18 December 2024)
- ML20053B737 + (09:02:04, 18 December 2024)
- ML20053B736 + (09:02:05, 18 December 2024)
- ML20053B735 + (09:02:06, 18 December 2024)
- ML20053B732 + (09:02:09, 18 December 2024)
- ML20053B731 + (09:02:10, 18 December 2024)
- ML20053B729 + (09:02:11, 18 December 2024)
- ML20053B727 + (09:02:15, 18 December 2024)
- ML20053B723 + (09:02:18, 18 December 2024)
- ML20053B722 + (09:02:19, 18 December 2024)
- ML20053B720 + (09:02:23, 18 December 2024)
- 05000369/LER-1982-032-03, /03L-0:on 820415,snubber Restored to Operability After Being Removed on 820408 W/O Being Declared Inoperable. Caused by Lack of Administrative Controls Allowing Rescheduling of Work Request W/Unreviewed Job Changes + (09:02:24, 18 December 2024)
- ML20053B716 + (09:02:28, 18 December 2024)
- ML20053B715 + (09:02:29, 18 December 2024)
- 05000369/LER-1982-032, Forwards LER 82-032/03L-0 + (09:02:34, 18 December 2024)
- 05000321/LER-1982-027-03, /03L-0:on 820412,site Failed to Prove Operability for Two Trains within 4-h W/Standby Gas Treatment Filter Train 1T46-C001B Inoperable.Caused by Manometer Failure. Manometers Replaced + (09:02:36, 18 December 2024)
- ML20053B709 + (09:02:38, 18 December 2024)
- ML20053B706 + (09:02:42, 18 December 2024)
- 05000321/LER-1982-027, Forwards LER 82-027/03L-0 + (09:02:44, 18 December 2024)
- ML20053B703 + (09:02:45, 18 December 2024)
- 05000325/LER-1982-022-03, /03L-0:on 820417,reactor Circulation Pump 1A Tripped Due to Motor Generator Set Undervoltage,Resulting from Spurious Opening & Closing of Unit Switchyard Pcb 23A & 23B.Caused by Transmission Line Perturbations + (09:02:50, 18 December 2024)
- ML20053B699 + (09:02:51, 18 December 2024)
- ML20053B695 + (09:02:55, 18 December 2024)
- 05000325/LER-1982-022, Forwards LER 82-022/03L-0 + (09:02:57, 18 December 2024)
- 05000324/LER-1982-072-03, /03L-0:on 820411,RHR Pump 2C Motor Breaker Tripped Upon Start.Cause Not Determined.Breaker 5HK250 Racked Out,Inspected & Tested.Pump Started + (09:03:01, 18 December 2024)
- ML20053B689 + (09:03:04, 18 December 2024)
- 05000280/LER-1982-052-03, /03L-0:on 820428,amplifier for Heat Tracing Panel B,Circuit 2B,read Below Acceptance Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested. Design Change Initiated + (09:03:09, 18 December 2024)
- ML20053B687 + (09:03:11, 18 December 2024)
- 05000324/LER-1982-072, Forwards LER 82-072/03L-0 + (09:03:16, 18 December 2024)
- 05000280/LER-1982-046-03, /03L-0:on 820419,process Vent Particulate Radiation Monitor Filter Fault Alarm Observed.Filter Paper Unable to Advance Due to Swelling Caused by Water Absorption.Caused by Lifting of Relief Valve RV-GW-107 + (09:03:18, 18 December 2024)
- ML20053B683 + (09:03:19, 18 December 2024)
- ML20053B682 + (09:03:20, 18 December 2024)
- ML20053B681 + (09:03:21, 18 December 2024)
- ML20053B678 + (09:03:26, 18 December 2024)
- ML20053B677 + (09:03:27, 18 December 2024)
- 05000328/LER-1982-044-01, /01T-0:on 820409,containment Purge Air Exhaust Radiation Monitor Declared Inoperable Due to Inadequate Sample Points.Caused by Const Drawing Failure to Indicate Flows to & from Radiation Monitors.Piping Reworked + (09:03:29, 18 December 2024)
- ML20053B672 + (09:03:38, 18 December 2024)
- 05000328/LER-1982-044, Forwards LER 82-044/01T-0 + (09:03:39, 18 December 2024)