Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059A488 + (12:14:47, 17 December 2024)
- ML20059A487 + (12:14:48, 17 December 2024)
- LIC-93-0297, Documents Completion of Requests Contained in SD Bloom to Util Forwarding Safety Evaluation for C-E Rept CUN-387-P,Rev 1, Pressurizer Surge Line Thermal Stratification Evaluation, Per NRC Bulletin 88-011 + (12:14:49, 17 December 2024)
- ML20059A486 + (12:14:49, 17 December 2024)
- ML20059A483 + (12:14:50, 17 December 2024)
- LIC-93-0302, Forwards Certificate of Nuclear Energy Liability Insurance for ANI Policy NF-207 & Maelu Policy MF-63 + (12:14:51, 17 December 2024)
- ML20059A481 + (12:14:51, 17 December 2024)
- ML20059A480 + (12:14:52, 17 December 2024)
- LD-93-172, Provides Material to Close follow-on to Dser Responses Re System 80+ Info for Issue Closure + (12:14:56, 17 December 2024)
- NRC-93-0146, Forwards Response to NRC Questions Re Suppl 1 to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount + (12:14:57, 17 December 2024)
- ET-NRC-93-3995, Forwards Westinghouse Responses to NRC Request for Addl Info on AP600 from Ltrs & 20 + (12:14:58, 17 December 2024)
- ML20059A475 + (12:14:58, 17 December 2024)
- ML20059A472 + (12:14:59, 17 December 2024)
- 0CAN129302, Submits Progress of Historical Review Project in Reviewing Past NRC Correspondence for Commitments.Summary of 9 Items Resolved During Past Three Months Encl + (12:15:03, 17 December 2024)
- ML20059A471 + (12:15:03, 17 December 2024)
- ML20059A466 + (12:15:04, 17 December 2024)
- ML20059A465 + (12:15:06, 17 December 2024)
- 05000364/LER-1993-004, :on 931202,reactor Tripped on SG low-low Following Turbine Trip.Caused by SG Feed Pump Speed Control Maintained at Excessive Pressure as Result of Speed Failure of Controller Card + (12:15:08, 17 December 2024)
- ML20059A462 + (12:15:10, 17 December 2024)
- JPN-93-082, Forwards Application for Amend to License DPR-59,reflecting Full Area Fire Suppression in East & West Cable Tunnels + (12:15:11, 17 December 2024)
- ML20059A458 + (12:15:12, 17 December 2024)
- 0CAN129304, Forwards Response to Violations Noted in Insp Repts 50-313/93-30 & 50-368/93-30.Corrective Actions:Licensee Identified That on 930818,surveys Were Not Made to Assure Compliance w/10CFR20.301 + (12:15:13, 17 December 2024)
- ML20059A455 + (12:15:14, 17 December 2024)
- ML20059A453 + (12:15:15, 17 December 2024)
- B14677, Responds to NRC 920413 Safety Evaluation Re Conformance to Reg Guide 1.97,Rev 2.Util Requests Rev to Exception Re Vent from SG Safety Relief Valves or Atmospheric Dump Valve Variable + (12:15:16, 17 December 2024)
- ML20059A449 + (12:15:20, 17 December 2024)
- 3F1093-12, Proposed Tech Specs Reflecting Results of Numerous Meetings Re Improved TS + (12:15:21, 17 December 2024)
- ML20059A447 + (12:15:21, 17 December 2024)
- RBG-39796, Application for Amend to License NPF-47,revising Applicable Tech Specs for one-time Extension Re Valve Leak Rate Testing + (12:15:22, 17 December 2024)
- IR 05000346/1993017 + (12:15:25, 17 December 2024)
- ML20059A443 + (12:15:26, 17 December 2024)
- ML20059A439 + (12:15:33, 17 December 2024)
- ML20059A438 + (12:15:34, 17 December 2024)
- ML20059A434 + (12:15:52, 17 December 2024)
- ML20059A433 + (12:15:53, 17 December 2024)
- U-602222, Notifies That Eb Reich Resigned Position W/Ip,Effective 931217 + (12:15:54, 17 December 2024)
- ML20059A431 + (12:15:54, 17 December 2024)
- ML20059A428 + (12:16:00, 17 December 2024)
- PNO-I-93-071, on 931221,first Two Dry Storage Canisters Loaded Into Independent Spent Fuel Storage Facility May Not Have Been Dried to Vacuum Required by Ts.Util Currently Conducting Investigation of Issue + (12:16:01, 17 December 2024)
- ULNRC-02922, Special Rept 93-04:on 931119,channel 7 of loose-part Detection Sys Determined Inoperable for Greater than 30 Days.Charge Converter Replaced.Troubleshooting Revealed Problem W/Sensor Mounting or Associated Sensor Cabling + (12:16:07, 17 December 2024)
- ML20059A423 + (12:16:08, 17 December 2024)
- IR 05000338/1993025 + (12:16:09, 17 December 2024)
- ML20059A416 + (12:16:10, 17 December 2024)
- ML20059A415 + (12:16:11, 17 December 2024)
- ML20059A414 + (12:16:11, 17 December 2024)
- B14699, Responds to Unresolved Item 50-336/93-81-08 from Insp Rept 50-336/93-81.Scheduled Completion Date for EDG Fuel Oil Consumption Calculation Delayed Unitl 940630 + (12:16:12, 17 December 2024)
- ML20059A411 + (12:16:12, 17 December 2024)
- ML20059A410 + (12:16:13, 17 December 2024)
- IR 05000416/1993014 + (12:16:17, 17 December 2024)
- IR 05000528/1993049 + (12:16:39, 17 December 2024)
- BSEP-93-0243, Responds to Request for Addl Info Re Limestone Quarry Near Facility.Sufficient Info Does Not Exist to Evaluate Impact. Recommends Mining Application Be Approved + (12:16:46, 17 December 2024)