Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063P735 + (02:16:34, 17 December 2024)
- 05000272/LER-1982-067, Forwards LER 82-067/03L-0.Detailed Event Analysis Encl + (02:16:35, 17 December 2024)
- 05000311/LER-1982-104-03, /03L-0:on 820908,vital Bus 2A Would Not Transfer Automatically from One 4 Kv Transformer to Another.Caused by Dirt in Undervoltage Relay.Relay Cleaned + (02:16:38, 17 December 2024)
- 05000219/LER-1982-050-03, /03L-0:on 820828,reactor Vessel Pressurized in Excess of 110 Psig W/Reactor Water Temp Greater than 212 F. Caused by Inadequate Procedure 602.4.001.Test Procedure Will Be Reviewed to Redefine Temp/Pressure Requirements + (02:16:40, 17 December 2024)
- 05000311/LER-1982-104, Forwards LER 82-104/03L-0.Detailed Event Analysis Encl + (02:16:42, 17 December 2024)
- BSEP-82-1952, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-26 & 50-325/82-26.Corrective Actions:New Comprehensive post-testing Program Being Developed + (02:16:42, 17 December 2024)
- 05000219/LER-1982-050, Forwards LER 82-050/03L-0.Detailed Event Analysis Encl + (02:16:45, 17 December 2024)
- ML20063P698 + (02:16:49, 17 December 2024)
- 05000311/LER-1982-073-01, /01T-0:on 820813,during Containment entry,1.5 Gpm Svc Water Leak Discovered on Containment Fan Coil Unit 23. Caused by Failed Cooling Coil Due to Erosion by Silt Particles.Leak Repaired W/Belzona Metal Filler + (02:16:50, 17 December 2024)
- 05000311/LER-1981-002-03, /03L-0:on 810117,during Routine Surveillance Test, 2A Diesel Generator Failed to Accelerate to 875 Rpm within 10-s.Caused by Failure of Solenoid Pilot Valves 21DA23A & 22DA23B.Valves Replaced + (02:16:53, 17 December 2024)
- 05000311/LER-1982-073, Forwards LER 82-073/01T-0 + (02:16:54, 17 December 2024)
- 05000269/LER-1981-001-03, /03L-0:on 810105,turbine Trip from 90% Full Power Occurred.Caused by Loss of Excitation on Generator Field Resulting from Mismatch During Personnel Attempt to Raise Volt Amperes Reactive on Units 1 & 2 + (02:16:55, 17 December 2024)
- 05000311/LER-1981-002, Forwards LER 81-002/03L-0.Detailed Event Analysis Encl + (02:16:56, 17 December 2024)
- 05000269/LER-1981-001, Forwards LER 81-001/03L-0.Detailed Event Analysis Encl + (02:16:57, 17 December 2024)
- ML20063P676 + (02:16:59, 17 December 2024)
- 0CAN108203, Forwards Addl Info Re Safe Shutdown Capability,In Response to NRC 820903 Request + (02:17:00, 17 December 2024)
- ML20063P669 + (02:17:01, 17 December 2024)
- ML20063P668 + (02:17:02, 17 December 2024)
- 05000311/LER-1982-086-03, /03L-0:on 820915,water Observed Dripping from Oil Level Sightglass on Svc Water Pump Motor.Caused by Failed Motor Bearing Oil Cooler Due to Accelerated Erosion & Corrosion.Failed Cooler Repaired + (02:17:06, 17 December 2024)
- 05000311/LER-1982-086, Forwards LER 82-086/03L-0.Detailed Event Analysis Encl + (02:17:07, 17 December 2024)
- 05000280/LER-1981-027-03, /03L-0:on 810726,PT-27 Revealed Low Current Readings for Circuit 30,Panels 8 & 9 (Boron Injection Tank Recirculation Line),Rendering Both Channels of Heat Tracing Inoperable.Caused by Boric Acid build-up on Tracing Tapes + (02:17:09, 17 December 2024)
- 05000237/LER-1981-059-03, /03L-0:on 810910,while Conducting Insp on Pump 2A,CCSW Outboard Bearing Found Burned Out.Caused by Lack of Lubrication in Sealed Bearing.Bearing Replaced + (02:17:11, 17 December 2024)
- 05000324/LER-1981-032-03, /03L-0:on 810223,while Performing Required Testing as Result of Diesel Generator 2 Being Out of Svc for Maint, Diesel Generator 3 Declared Inoperable Due to Low Control Air Pressure.Caused by Misaligned Valve Disc + (02:17:13, 17 December 2024)
- 05000237/LER-1981-059, Forwards LER 81-059/03L-0 + (02:17:14, 17 December 2024)
- BSEP-82-1781, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-20 & 50-325/82-20.Corrective Actions: Procedure Cqad 80-1 Revised & Frequency of Plant Audits Increased to Reduce Audit Scope + (02:17:14, 17 December 2024)
- 05000324/LER-1981-032, Forwards LER 81-032/03L-0 + (02:17:15, 17 December 2024)
- 05000335/LER-1981-002-03, /03L-0:on 810122,digital Data Processing Sys Computer Dropped off-line,resulting in Loss of Control Element Assembly Pulse Counting Backup Position Indication. Caused by Software Problem.Problem Under Investigation + (02:17:16, 17 December 2024)
- BSEP-82-2027, Suppls 820816 Response to NRC Re Violations Noted in IE Insp Repts 50-324/82-20 & 50-325/82-20.Addl Info Re Revision to Procedure Cqad 80-1 to Assure Timely Corrective Actions to Future Audit Findings Provided + (02:17:17, 17 December 2024)
- 05000335/LER-1981-002, Forwards LER 81-002/03L-0 + (02:17:18, 17 December 2024)
- ML20063P627 + (02:17:18, 17 December 2024)
- AECM-82-376, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-55.Corrective actions:10CFR50.59 Evaluations Performed for Temporary Alterations & Temporary Alteration Procedure Revised + (02:17:19, 17 December 2024)
- BSEP-82-1789, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-23 & 50-325/82-23.Corrective Actions: post-maint Testing Program Revised & Inservice Insp Program Under Review + (02:17:19, 17 December 2024)
- AECM-82-388, Suppls 820831 Response to NRC Re Violations Noted in IE Insp Rept 50-416/82-55.Corrective Actions:Plant Administrative Procedure Will Be Revised to Clarify Temporary Alteration Program & Delete Use of Chit Log Sys + (02:17:20, 17 December 2024)
- ML20063P616 + (02:17:20, 17 December 2024)
- BSEP-82-2005, Revises Response to NRC Ltr Re Violations Noted in IE Insp Repts 50-324/82-23 & 50-325/82-23.Corrective Actions: Assessment of Inservice Insp Program in Progress.Violation Will Be Fully Addressed by 821231 + (02:17:21, 17 December 2024)
- AECM-82-252, Responds to Noncompliance Re Emergency Accountablility Noted in IE Insp Rept 50-416/82-27.Interpretion of Onsite Questionable.Other Utils Make Same Distinction of Site Boundary Being Same as Protected Area + (02:17:22, 17 December 2024)
- ML20063P608 + (02:17:25, 17 December 2024)
- AECM-82-411, Suppls 820831 Response to NRC Re Violations Noted in IE Insp Rept 50-416/82-55.Corrective Actions:Anubar Installations Will Be Identified as Temporary Alterations & Placed Under Temporary Alteration Program + (02:17:26, 17 December 2024)
- 0CAN108204, Forwards Response to 820120 & 0301 Requests for Addl Info Re RCS High Point Vents.Credible Missiles Generated by Failure of RCS Vent Valves Not Postulated Based on Valve Design.Leak Detection Provided for by Monitoring Pressure + (02:17:26, 17 December 2024)
- 05000331/LER-1982-059-03, /03L-0:on 820910,workmen in Reactor Core Isolation Cooling (RCIC) Room Reported Marked Increase in Room Temp. Caused by Broken Drive Belt in RCIC Room Cooling Unit 1V-AC-15A Due to Random Failure + (02:17:28, 17 December 2024)
- 05000331/LER-1982-059, Forwards LER 82-059/03L-0 + (02:17:29, 17 December 2024)
- 05000328/LER-1982-110-03, /03L-0:on 820907,in Mode 1,one Train of Automatic Trip Logic Declared Inoperable.Caused by Inability to Clear First Out Annunciators for Intermediate & Low Power Range Flux Reactor Trips.Annunciators Cleared & Logic Restored + (02:17:31, 17 December 2024)
- 05000317/LER-1982-054-03, /03L-0:on 820831,12 Auxiliary Feedwater Pump Governor Linkage Vibrated Loose,Rendering Pump Inoperable. Caused by Loose Nut Connecting Governor Lever to Connecting Rod Backed Off Pin Causing Pin to Come Out.Pin Reinserted + (02:17:33, 17 December 2024)
- ML20063P573 + (02:17:34, 17 December 2024)
- ML20063P572 + (02:17:35, 17 December 2024)
- 05000328/LER-1982-110, Forwards LER 82-110/03L-0 + (02:17:36, 17 December 2024)
- ML20063P569 + (02:17:36, 17 December 2024)
- 05000317/LER-1982-054, Forwards LER 82-054/03L-0 + (02:17:37, 17 December 2024)
- ML20063P557 + (02:17:43, 17 December 2024)
- L-82-426, Interim Deficiency Rept Re Fan Belts on Diesel Generators 2A & 2B.Initially Reported on 820210.Final Rept Will Be Submitted by 821130 + (02:17:48, 17 December 2024)
- 05000282/LER-1982-016-03, /03L-0:on 820906,spike Occurred in RCS Activity Up to 1.38 Uci/G Dose Equivalent I-131.Caused by Reactor Trip & Subsequent Washout of Fission Product from Existing Fuel Defects.Region 9 Fuel Will Be Removed + (02:17:50, 17 December 2024)