Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064J134 + (01:36:51, 17 December 2024)
- ML20064J139 + (01:36:51, 17 December 2024)
- 05000361/LER-1982-158-03, /03L-0:on 821202,during Surveillance Testing,Rcs Water Inventory Balance Indicated Unidentified Leakage Exceeding Tech Specs.Caused by Isolated Chemical & Vol Control Sys Charging Pump P-192.Plungers Replaced + (01:36:53, 17 December 2024)
- ML20064J126 + (01:36:54, 17 December 2024)
- ML20064J125 + (01:36:55, 17 December 2024)
- ML20064J119 + (01:36:56, 17 December 2024)
- ML20064J112 + (01:36:58, 17 December 2024)
- 05000281/LER-1982-073-03, /03L-0:on 821207 & 24,FI-474 Drifted Low. Caused by Partial Loss of Fluid in Sensing Line to High Side of Transmitter.Valve Repaired & Sensing Line Filled + (01:37:00, 17 December 2024)
- ML20064J105 + (01:37:02, 17 December 2024)
- 05000338/LER-1982-076-03, /03L-0:on 821207,while in Mode 3,w/casing Cooling Pump 3A Removed from Svc to Perform Maint,Mode Change Made Due to Unscheduled Outage.Maint Completed in Mode 5 + (01:37:03, 17 December 2024)
- ML20064J102 + (01:37:06, 17 December 2024)
- ML20064J091 + (01:37:06, 17 December 2024)
- 05000338/LER-1982-076, Forwards LER 82-076/03L-0 + (01:37:07, 17 December 2024)
- ML20064J079 + (01:37:08, 17 December 2024)
- 05000361/LER-1982-158, Forwards LER 82-158/03L-0.Detailed Event Analysis Submitted + (01:37:09, 17 December 2024)
- ML20064J078 + (01:37:09, 17 December 2024)
- B14770, Proposed Tech Specs Supporting one-time Extension to 18- Month Surveillances + (01:37:10, 17 December 2024)
- ML20064J069 + (01:37:11, 17 December 2024)
- ML20064J061 + (01:37:12, 17 December 2024)
- ML20064J068 + (01:37:12, 17 December 2024)
- ML20064J056 + (01:37:13, 17 December 2024)
- ML20064J054 + (01:37:14, 17 December 2024)
- ML20064J053 + (01:37:15, 17 December 2024)
- LD-94-018, Suppls Submitted by Epri,Forwarding Rept on Technical Aspects of Emergency Planning for Alwrs + (01:37:16, 17 December 2024)
- ML20064J051 + (01:37:16, 17 December 2024)
- 05000395/LER-1982-054-03, /03L-0:on 821208,loose Part Detection Sys Failed Daily Channel Check.Caused by Microprocessor Failure. Microprocessor Replaced + (01:37:19, 17 December 2024)
- ML20064J048 + (01:37:20, 17 December 2024)
- ML20064J046 + (01:37:21, 17 December 2024)
- 05000387/LER-1982-067-01, /01T-0:on 821224,grab Samples Not Taken Every 4 H While Main Condenser Offgas Hydrogen Monitor Inoperable. Caused by Lack of Communication Between Operations & Chemistry Group.Incident Reporting Procedure Changed + (01:37:22, 17 December 2024)
- ML20064J040 + (01:37:23, 17 December 2024)
- ML20064J038 + (01:37:24, 17 December 2024)
- 05000395/LER-1982-054, Forwards LER 82-054/03L-0.Detailed Event Analysis Encl + (01:37:29, 17 December 2024)
- ML20064J034 + (01:37:29, 17 December 2024)
- 05000362/LER-1982-006, Ro:On 821217,incident Involving Emergency Safety Features Actuation Signal Occurred.Written Followup Rept W/Interim LER 82-006 Will Be Submitted by 821228 + (01:37:30, 17 December 2024)
- ML20064J028 + (01:37:31, 17 December 2024)
- ML20064J027 + (01:37:32, 17 December 2024)
- 05000416/LER-1982-164-03, /03L-0:on 821212 & 13,two Fire Doors in Auxiliary Bldg Blocked Open for Planned Maint Activities & to Support Plant Testing.Testing Completed,Hoses Removed & Doors Closed + (01:37:34, 17 December 2024)
- ML20064J018 + (01:37:35, 17 December 2024)
- ML20064J012 + (01:37:36, 17 December 2024)
- 05000387/LER-1982-067, Forwards LER 82-067/01T-0 + (01:37:37, 17 December 2024)
- ML20064J008 + (01:37:38, 17 December 2024)
- ML20064J005 + (01:37:38, 17 December 2024)
- ML20064J002 + (01:37:39, 17 December 2024)
- ML20064J001 + (01:37:40, 17 December 2024)
- 05000333/LER-1982-056-03, /03L-0:on 821215,LPCI Inverter a Tripped When Power Transferred to Maint Supply,Per Tech Spec 3.9.F. Redundant Sys Verified Operable.Caused by Failed Gate Timing Control Card.Card Returned to Vendor for Analysis & Repair + (01:37:46, 17 December 2024)
- 05000416/LER-1982-164, Forwards LER 82-164/03L-0 + (01:37:48, 17 December 2024)
- ML20064H970 + (01:37:50, 17 December 2024)
- 05000333/LER-1982-056, Forwards LER 82-056/03L-0 + (01:37:51, 17 December 2024)
- ML20064H964 + (01:37:51, 17 December 2024)
- ML20064H959 + (01:37:52, 17 December 2024)
- RC-94-0075, Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses + (01:37:53, 17 December 2024)