Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064N469 + (01:13:43, 17 December 2024)
- 05000333/LER-1994-001-01, :on 940224,HPCI Sys Declared Inoperable Due to Minor Corrosion on Gland Seal Casing & Pitting of Turbine Shaft in Seal Area.New Turbine Shaft Seals Installed + (01:13:45, 17 December 2024)
- ML20064N467 + (01:13:46, 17 December 2024)
- ML20064N464 + (01:13:47, 17 December 2024)
- ML20064N465 + (01:13:47, 17 December 2024)
- ML20064N463 + (01:13:48, 17 December 2024)
- ML20064N462 + (01:13:49, 17 December 2024)
- ML20064N461 + (01:13:49, 17 December 2024)
- ML20064N457 + (01:13:50, 17 December 2024)
- ML20064N456 + (01:13:51, 17 December 2024)
- ML20064N455 + (01:13:51, 17 December 2024)
- ST-HL-AE-4741, Forwards South Tx Project Electric Generating Station Operational Readiness Plan Unit 2. Plan Is Refinement of Process Utilized for Unit 1 + (01:13:52, 17 December 2024)
- ML20064N451 + (01:13:53, 17 December 2024)
- ML20064N448 + (01:13:54, 17 December 2024)
- 05000317/LER-1994-002, :on 940224,EDG Load Sequencer Timer Not Consistently Tested in Modes 5 & 6.Caused by Misunderstood Applicability.Ts Amended to Delete Unnecessary Test.W/ + (01:13:56, 17 December 2024)
- RBG-14-293, Interim Deficiency Rept Re Installation of Nonseismic Pipe Supports Over Category I Components in Control Bldg. Initially Reported on 820615.Util Currently Evaluating Info by S&W.Final Rept Expected by 830531 + (01:13:57, 17 December 2024)
- ML20064N444 + (01:13:57, 17 December 2024)
- ML20064N433 + (01:13:58, 17 December 2024)
- ML20064N432 + (01:13:59, 17 December 2024)
- ML20064N429 + (01:13:59, 17 December 2024)
- ML20064N424 + (01:14:01, 17 December 2024)
- ML20064N423 + (01:14:02, 17 December 2024)
- ML20064N422 + (01:14:02, 17 December 2024)
- ML20064N421 + (01:14:03, 17 December 2024)
- 05000237/LER-1983-004-03, /03L-0:on 830113,during Core Unloading Operations, Grapple Control Rod Interlock Would Intermittently Clear While Grapple Was Over Core.Caused by Grapple Not Maintaining Full Contact W/Rail.Limit Switch Adjusted + (01:14:05, 17 December 2024)
- ML20064N413 + (01:14:06, 17 December 2024)
- ML20064N409 + (01:14:07, 17 December 2024)
- ML20064N410 + (01:14:07, 17 December 2024)
- ML20064N408 + (01:14:08, 17 December 2024)
- ML20064N406 + (01:14:08, 17 December 2024)
- 05000237/LER-1983-004, Forwards LER 83-004/03L-0 + (01:14:09, 17 December 2024)
- ML20064N394 + (01:14:10, 17 December 2024)
- ML20064N393 + (01:14:14, 17 December 2024)
- ML20064N392 + (01:14:14, 17 December 2024)
- ML20064N390 + (01:14:15, 17 December 2024)
- ML20064N391 + (01:14:15, 17 December 2024)
- ML20064N387 + (01:14:16, 17 December 2024)
- 05000325/LER-1982-081-03, /03L-0:on 820804,during Surveillance Test Requirements Review,Oil Sampling Requirements for Diesel Fuel Oil Sys Not Performed Per ASTM-D270-65.Caused by Absence of Sample Points on Tanks.Tanks Modified + (01:14:18, 17 December 2024)
- ML20064N379 + (01:14:19, 17 December 2024)
- ST-HL-AE-4743, Responds to Verbal Request from L Kokajko & Forwards Authorization to Place American Warming & Ventilating,Inc, Documentation in PDR + (01:14:20, 17 December 2024)
- ML20064N377 + (01:14:20, 17 December 2024)
- NRC-94-4085, Advises That No Proprietary Info Contained in 940316 Request for Addl Info on AP600 + (01:14:21, 17 December 2024)
- ML20064N371 + (01:14:22, 17 December 2024)
- ML20064N370 + (01:14:22, 17 December 2024)
- 05000325/LER-1982-081, Forwards LER 82-081/03L-0 + (01:14:23, 17 December 2024)
- RBG-40422, Advises That Due to Merger W/Entergy Operations,Inc All Invoices Re River Bend Station Should Be Mailed to Listed Address + (01:14:23, 17 December 2024)
- ML20064N358 + (01:14:24, 17 December 2024)
- 05000311/LER-1982-077-01, /01T-0:on 820818,containment Sump Pump Discovered Leaking & Containment Fan Coil Unit 21 Indicated Increased Humidity & Rising Drain Pot Level.Caused by Leaking Secondary Coil Due to Erosion of Piping + (01:14:25, 17 December 2024)
- 05000237/LER-1983-005-03, /03L-0:on 830112,during Refueling Outage,While Local Leak Rate Testing,Outboard MSIV 2-203-2B Leaking in Excess of Tech Specs.Caused by Valve Packing Leakage.Packing Tightened + (01:14:28, 17 December 2024)
- ML20064N353 + (01:14:29, 17 December 2024)
- ML20064N351 + (01:14:29, 17 December 2024)
- 05000361/LER-1982-083-03, /03L-0:on 820807,condensate Storage Tank T-121 Water Level Fell Below Tech Spec.Caused by Inadequate Makeup Water Control to Tank & More Restrictive than Necessary Tech Spec + (01:14:31, 17 December 2024)