Forwards 830210 Affidavit of KA Ainger Re Potential for Bubble Collapse Water Hammer in Feedwater Bypass Line.Temp Sensors Will Be Installed in Bypass Sys Piping.Check Valve Upstream of Auxiliary Nozzle Removed from Plant Design
ML20064N409
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/10/1983
From: Copeland V
COMMONWEALTH EDISON CO., ISHAM, LINCOLN & BEALE
To: Callihan A, Cole R, Smith I
Atomic Safety and Licensing Board Panel
Shared Package
ML20064N412 List:
References
NUDOCS 8302160223
Download: ML20064N409 (2)


Text

.

.f y

' DOCKETED ISHAM, LINCOLN & BEALE usmc COUNSELORS AT t.AW 1120 CONPdCTICUT AVENUE. N W. = SUITE 840 WASHINGTON. D.C 20036

'h ] j } g EDWARD S. lSHAM. 1872 1902 202 833-9730 CHICAGO OFFICE ROBERTT UNCOLN. 1872-1889 THREE FIRST NATIONAL PLAZA WILUAM G. BEALE. 1885-19*1 -

. CHICAGO. ILUNOIS 60002

["':,, ' TELEPHONE T2 558-7500 February 10, 1983 "~" '.j @ $*""1 Ivan W. Smith Dr. Richard F. Cole Administrative Judge and Administrative Judge Chairman Atomic Safety and Licensing Atomic Safety and Licensing Board Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. A. Dixon Callihan Administrative Judge Atomic Safety and Licensing Board c/o Union Carbide Corporation P.O. Box Y Oak Ridge, Tennessee 37830 Re: In the Matter of Commonwealth Edison Company (Byron Nuclear Power Station, Units 1 and 2)

Docket Nos. 50-454 and 50-455 Gentlemen:

In, 9ccordance with the disclosure requirements of the McGuire case, I am enclosing the Affidavit of Kenneth A. Ainger, dated February 10, 1983. Mr. Ainger's affidavit provides information pertinent to DAARE/ SAFE Contention 9a which, as limited by the Atomic Safety and Licensing Board, concerns the potential for a bubble collapse waterhammer in the feedwater bypass line similar to the one that occurred at the KRSKO plant in Yugoslavia.

The purpose of this filing is to apprise the Licensing Board and parties of two changes to the feedwater bypass system. As more fully explained in Mr. Ainger's affidavit, these changes are as follows:

1. In her affidavit, dated October 5, 1982, which was served on the Licensing Board and all parties by letter of counsel, dated October 14, 1982, Ms. Leslie A. Bowen stated
  • / Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), ALAB-143, 6 AEC, 623, 625 (1973).

8302160223 830210 PDR ADOCK 05000454 g PDR

4 that Commonwealth Edison Company no longer intended to install temperature sensors on the bypass system piping. Edison has reconsidered this position and now intends to install such sensors.

2. In her prior affidavit, dated June 6, 1982, which was filed on June 7 3 1982 in connection with Edison's motion for summary disposition, Ms. Bowen stated that the Byron System design had a check valve upstream of the auxiliary nozzle which was not present in the KRSKO design.

(This valve was also referenced in Edison's response to questions posed by the NRC Staff with respect to the KRSKO event. A copy of this response was submitted to the Licensing Board and all parties by the aforementioned letter of counsel, dated October 14, 1982 as an attachment to Ms. Bowen's October 5, 1982 affidavit.) For reasons stated in Mr. Ainger's affidavit, and the letter from Westinghouse, dated February 9, 1983, attached thereto, this valve has been removed from the Byron Station design.

Also, please find enclosed my entry of appearance in this proceeding.

Very truly yours, Y .

0J Victor G. Copeland One of the Attorneys for Commonwealth Edison Company Enclosures cc: Service List

- _ _