ML20064N467
| ML20064N467 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 02/04/1983 |
| From: | Koester G KANSAS GAS & ELECTRIC CO. |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, KMLNRC-83-014, KMLNRC-83-14, NUDOCS 8302160245 | |
| Download: ML20064N467 (1) | |
Text
KANSAS GAS AND ELECTRIC COMPANY TPC ELECTAC COMPANY GLENN L ROESTER WCE PPE 5'UENT hvCLEade February 4, 1983 Mr. W.C. Seidle, Chief g
Reactor Projects Branch 2
[. [!s
.[;]
U.S. Nuclear Regulatory Commission
- j
-l l
Region IV l'
}-
FB3-71983 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
[
i KMINRC 83-014 Re:
Docket No. STN 50-482 Ref: 1) Interim Report KMLNRC 82-221 from GLKoester, KG&E, to WCSeidle, NRC
- 2) Interim Report KMLNRC 82-248 from GLKoester, KG&E, to WCSeidle, NRC Subj: Potential 10CFR50.55(e) Interim Report -
Diesel Generator Bolt Torque
Dear Mr. Seidle:
The purpose of this letter is to provide a status report on the potentially loose stud / nut combinations in the diesel generators at Wolf Creek Generating Station. This matter was reported to Region IV of the Nuclear Regulatory Commission on June 14, 1982, by Kansas Gas and Electric Company and subsequent status reports were submitted in References 1) and 2).
The rework plan for the inspection and retorquing of the stud / nut combinations in question has been finalized and seat to the job site.
The work will be scheduled when compatible with other work in progress.
The status of the inspection and evaluation will be reported on or before June 6, 1983.
In the interim, please direct any questions con-cerning this subject to me or to Mr. Otto Maynard of my staff.
Yours very truly,
{flO GLK:bb cc:FCDeYoung Tvandel/SSchum 8302160245 830204 PDR ADOCK 05000482 g
PDR 201 N. Market - Wichita, Kansas - Mail Address: RO. Box 208 I Wichita, Kansas 67201 - Telephone: Area Code (316) 261-6451