Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-374, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/82-24 & 50-251/82-24.Corrective Actions:Plant Manager Discussed Need for Increased Control of Activities Affecting Fire Barrier Penetrations W/Const Personnel + (00:51:42, 17 December 2024)
- ML20065F304 + (00:51:43, 17 December 2024)
- LIC-94-0074, Submits Rev to Commitment in Analysis Supporting Compliance w/NUREG-0737,Item II.D.1 Re Relief & Safety Valve Test Requirements + (00:51:44, 17 December 2024)
- ML20065F298 + (00:51:44, 17 December 2024)
- ML20065F295 + (00:51:45, 17 December 2024)
- ML20065F276 + (00:51:46, 17 December 2024)
- RC-94-0096, Forwards Technical Rept 93-3, Seismic Activity Near Vsns for Period Jul-Sept 1993 & Technical Rept 93-4, Seismic Activity Near Vsns for Period Oct-Dec 1993 + (00:51:46, 17 December 2024)
- 05000395/LER-1994-002-01, :on 940128,pressure & Flow Data for Charging/ Safety Injection Pumps Identified Condition Outside of Design Basis.Caused by Personnel Error.Controls Established & Test Procedures Revised + (00:51:48, 17 December 2024)
- ML20065F270 + (00:51:49, 17 December 2024)
- 05000324/LER-1982-083-03, Performance of PT-20.6 Revealed That Drywell to Torus Vacuum Breakers X18A,C & E Were Leaking Excessively.Caused by Accumulation of Dirt, Scale & Silicone Base Sealant on Valve Seating Surfaces + (00:51:52, 17 December 2024)
- ML20065F260 + (00:51:53, 17 December 2024)
- 05000324/LER-1982-083, Forwards Updated LER 82-083/03L-1 + (00:51:54, 17 December 2024)
- ML20065F238 + (00:51:55, 17 December 2024)
- ML20065F251 + (00:51:55, 17 December 2024)
- ML20065F223 + (00:51:56, 17 December 2024)
- ML20065F209 + (00:51:57, 17 December 2024)
- ML20065F205 + (00:51:58, 17 December 2024)
- ML20065F208 + (00:51:58, 17 December 2024)
- ML20065F197 + (00:51:59, 17 December 2024)
- ML20065F203 + (00:51:59, 17 December 2024)
- ML20065F196 + (00:52:00, 17 December 2024)
- RBG-40449, Forwards Rev 0 to Rept EA-PT-91-0003-SP4, Responses to Addl NRC Questions on River Bend Station Plant Transient Analysis Methodology,EA-PT-91-0003-M. Encl Withheld,Per 10CFR2.790 + (00:52:01, 17 December 2024)
- ML20065F195 + (00:52:01, 17 December 2024)
- ML20065F179 + (00:52:02, 17 December 2024)
- ML20065F170 + (00:52:02, 17 December 2024)
- PLA-1306, Interim Deficiency Rept Re Inadequate Clearance in Pacific Scientific Shock Suppressors & Itt Grinnell Pipe Clamps. Initially Reported on 820820.Final Rept Will Be Submitted by 830201.Also Reported Per Part 21 + (00:52:03, 17 December 2024)
- ML20065F163 + (00:52:04, 17 December 2024)
- ML20065F146 + (00:52:05, 17 December 2024)
- ML20065F143 + (00:52:05, 17 December 2024)
- 3F0990-10, Summarizes Util Vendor Interface Program,Per Generic Ltr 90-03 Re Vendor Interface for safety-related Components. Reevaluation of Vendor Interface Controls Demonstrated That Programs Effective + (00:52:06, 17 December 2024)
- ML20065F133 + (00:52:06, 17 December 2024)
- HL-1255, Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components. Util in Process of Establishing Addl Contact Program W/Ge Re Technical Info Received + (00:52:07, 17 December 2024)
- 3F0990-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/90-24.Corrective Actions:Shift Supervisor & Operator Causing Partial Loss of Instrument Air on 900710 Counseled Re Incident & Clearance Order Form Will Be Revised + (00:52:10, 17 December 2024)
- ML20065F114 + (00:52:10, 17 December 2024)
- ML20065F113 + (00:52:11, 17 December 2024)
- 05000416/LER-1982-055-03, /03L-0:during 820829-0908,discharge Basin Flow Trip Channel Inoperable.Caused by Approved Alteration of Trip Circuitry to Discharge glycol-contaminated Water W/O Normal Dilution.Trip Circuitry Restored After Discharge + (00:52:13, 17 December 2024)
- ML20065F103 + (00:52:14, 17 December 2024)
- ML20065F099 + (00:52:15, 17 December 2024)
- ML20065F102 + (00:52:15, 17 December 2024)
- 05000416/LER-1982-055, Forwards LER 82-055/03L-0 + (00:52:16, 17 December 2024)
- ML20065F095 + (00:52:16, 17 December 2024)
- W3P90-1512, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (00:52:20, 17 December 2024)
- ELV-02126, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/90-15 & 50-425/90-15 on 900730-0803.Corrective Action:Survey of All Emergency Facility Documents Conducted to Identify & Correct Discrepancies + (00:52:21, 17 December 2024)
- ML20065F081 + (00:52:21, 17 December 2024)
- 05000311/LER-1982-090-03, /03L-0:on 820822,operator Discovered Seal Cut on 100-ft Elevation Containment Air Lock Outer Door.Caused by Rubber Seal Partially Leaving Retaining Groove Due to Personnel Closing Door W/Excessive Force.Seal Replaced + (00:52:23, 17 December 2024)
- 05000311/LER-1982-090, Forwards LER 82-090/03L-0.Detailed Event Analysis Encl + (00:52:24, 17 December 2024)
- 05000285/LER-1994-002, :on 940308,boric Acid Pump Declared Inoperable Due to Inability to Ensure Reliable Starting of CH-4B Motor. Breaker Replaced W/Appropriate Model Breaker & Breaker for Boric Acid Pump Verified Appropriate + (00:52:26, 17 December 2024)
- 05000339/LER-1982-059-03, /03L-0:on 820830,steam Generator B Steam Flow Channel Iv,Providing Steam Line Break & Loss of Heat Sink Protection,Failed High.Cause Not Determined.Channel Placed in Tripped Condition.Problem Cleared During Troubleshooting + (00:52:28, 17 December 2024)
- AECM-82-407, Forwards Revision 5 to Physical Security Plan.Revision Withheld (Ref 10CFR2.790) + (00:52:29, 17 December 2024)
- 05000339/LER-1982-059, Forwards LER 82-059/03L-0 + (00:52:30, 17 December 2024)
- ML20065F017 + (00:52:30, 17 December 2024)