Text
-
7,.~ -
e 3
if Georgta Power Company -
g.
i 1
333 Palmont Annue '.
- 4. =
- '. Atlanta. Ocorg,a 30308 Tobphone 404 6263195 -
1
'p Ma;hng Addroos :.
,4
-do inverness CeNet Parkway
-=
~ Pact Office Dos.1295 Dirming%% Alabama 35201.
[
~ Tdophone POS BG8 5581 -
- j September 13, 1990; W. G. Hairston, til l
son,or vice P,esioent MSV-00318 Nuciear operahons -
iF1073:
j u
1 s
Docket Nos. 50-424, 50-425-J U. S. Nuclear Regulatory Commission
)
, ATTN: Document Control Desk =
l 1
Washington,.D.'C.
20555-(
Gentlemen:
.V0GTLE' ELECTRIC GENERATING ~ PLANT IDENTIFICATION OF INSERVICE INSPECTION:
- l
' PLAN DIFFERENCES i
Georgia Power Company. (GFC),
in response to its June R 7,11990 f verbal commitment : to NRC staff-personnel, submits. the enclosed ~~information which; j
identifies the' differences between the Vogtle: Electric 1 Generating Plant; i
-(VEGP),
Units 1 and 2 Inservice:. Inspection E(ISI). Plans.
tThe(subject information is being provided to assist the.NRC:and.~its contractor,-
1 EG&G-Idaho, in the review and; approval process associated with the? ISI Programs at VEGP.
y L
The ISI P1an documents of~ record tused.'.it ; developing.the 'enclo_ sed information _are Revision 3 of document no.
ISI-P-005ifor~:VEGPaliand' Revision 2 of document no. ISI-P-013 for VEGP-2.
'Since the ISI Plans)are
+
"living" documents, there-are dffferences-between Revision.3'and. Revision:0l' t
t of the VEGP-1 ISI Plan, which was originally submitted to the. -NRC byl GPC L
letter SL-3321 dated October 21,- 1987.. Although theilSItPlan documents are.
L not. normally submitted' to the NRC,-Revision -0 of;-the VEGP-l' ISI Plan
'(ISI-P-005) was submitted to the NRC in response:-to!a verbal > request fromi l
NRC staff personnel in 1987. 'A similar. resuest was not made' at the time 1
for a copy of the VEGP-2 ISI Plan (ISI-P-013).
While-there are. differences between the 'various revisions of the 1S1 Plan for the ; respective VEGP? unit',
the criteria on which the Plans' are based remain. unchanged..
During our review, nine relief requestsLwere identified which require-:
evaluation - and/or. revision.
Changes.to the ISID Plan'and/or~ Programj documents. incorporating'any necessary. changes-will:be made during,aifuture revision-of.the affected document (s).
Three copios of the enclosed information'are provided for yourireview.JTwo Administrator for NRC Region 11 and EG&G-Idaho.
1 copies of the subject information are being provided1to both the Regional' i
0h#
l 0n033 O
nL.
+01ooamos,oon 3 q \\ p^
n> Sgkh PDR ADoCK 05000424 L'
- j
'r rx u.
/-.
[
I
^
e
p p
s f
j u. S. Nuclear Regulatory Commission MSV-00318'
. Page 2-Should there be any. questions 1.n this' regard, please contact this office.
1 Sincerely,'
sd.) hvYh W. G. Hairston,.III' p
WGH,Ill/JAE/gb
Enclosure:
~.Vogtle Electric Generating Plant,. Units 1 and 2,. Identification -
.of Significant ISI Plan _ Differences:(6: volumes)
'xc:
Georala Power Comoanv Mr. C._ K. McCoy' (w/o encl. )
. Mr. J. A. Bailey- (w/o encl.)
Mri G.- Bockhold, Jr.- (w/ encl.)
Mr. R. M. 0 dom- (w/o encl.)
Mr. P. D. Rushton (w/o encl.)
Mr. L. A. Ward (w/ encl.)
NORMS.(w/enci.)
U. S. Nuclear Reaulatory CommissionL.
Mr.=S. D. Ebneter, Regional-Administrator b/ encl.)-
i Mr. D. S. Hood, Licensing Project Manager, NRR (w/ encl.)
Mr..-B. R..Bonser, Senior. Resident -Inspector, Vogtle (w/ encl.) z t-EG&G-Idaho.~ Inc.
Mr. B. Brown (w/ encl.).