Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248J897 + (18:07:55, 16 March 2025)
- NUREG-1334, Amend 5 to License NPF-76,replacing Combined Tech Specs (NUREG-1334) w/NUREG-1346 + (18:08:09, 16 March 2025)
- ML20248J844 + (18:08:14, 16 March 2025)
- ML20248J840 + (18:08:19, 16 March 2025)
- 05000483/LER-1998-004, :on 980502,TS Violation Due to Missed TS 4.2.5.4 Calibration of FW Temp Detectors Was Noted.Caused by Engineer Error.Revised Procedure to Ensure TS Is Calibrated within 7 Days of Performing Surveillance + (18:08:22, 16 March 2025)
- ML20248J835 + (18:08:25, 16 March 2025)
- ML20248J825 + (18:08:28, 16 March 2025)
- ML20248J819 + (18:08:31, 16 March 2025)
- 05000325/LER-1989-006, :on 890309,fire Door 203 Found Open But Proper Associated Fire Barrier Penetration Limiting Condition for Operation & Hourly Firewatch Were Not in Effect.Caused by Personnel Error.Individual Counseled + (18:08:33, 16 March 2025)
- 05000354/LER-1989-006-01, :on 890310,26 R Frequency Surveillance Procedures Exceeded Tech Spec Overdue Dates by Intervals of 1 to 10 Days.Caused by Less Conservative Interpretation. Schedule of Surveillance Procedures Reviewed + (18:08:49, 16 March 2025)
- 05000483/LER-1998-005, :on 980430,mispositioning of warm-up Steam Supply Valves to Tdafwp Results in TS 3.0.4 Violation During Refuel 9.Caused by ABHV0048 & ABHV0049 Not Being Opened Upon Sys Restoration.Revised Procedures + (18:08:54, 16 March 2025)
- TXX-8918, Advises That Case Documented Request for Action Re Facility Unit 1 1982 RCS Cold Hydrostatic Test Extended to 890424 + (18:08:59, 16 March 2025)
- IR 05000369/1998002 + (18:09:04, 16 March 2025)
- L-89-004, Forwards Response to NRC Re Violations Noted in Insp Rept 70-1151/88-19 on 881226-28.Response Withheld (Ref 10CFR2.790) + (18:09:07, 16 March 2025)
- NPL-98-0459, Responds to NRC Re Violations Noted in Insp Repts 50-266/98-06 & 50-301/98/06.Corrective Actions:Individual Involved in Event Was Immediately Counseled on Appropriate Procedure Use & Adherence Requirements + (18:09:30, 16 March 2025)
- IR 05000327/1998003 + (18:09:45, 16 March 2025)
- 05000324/LER-1989-005-02, :on 890313,HPCI Removed from Svc Due to Limitorque Torque Switches Set Too High.Caused by Software Error Which Caused Indicated Output Torque to Read High. Setting Adjusted.Also Reported Per Part 21 + (18:09:53, 16 March 2025)
- 05000322/LER-1989-002, :on 890309,full Reactor Protection Sys (RPS) Actuation Occurred While Attempting to Restore Power to RPS Bus B,Causing Reactor Trip.Caused by Personnel Error While Troubleshooting.Trip Setpoints Adjusted + (18:09:59, 16 March 2025)
- ML20248J677 + (18:10:02, 16 March 2025)
- IR 05000245/1996009 + (18:10:03, 16 March 2025)
- ML20248J673 + (18:10:05, 16 March 2025)
- ML20248J669 + (18:10:08, 16 March 2025)
- IR 05000312/1989004 + (18:10:14, 16 March 2025)
- IR 05000483/1998006 + (18:10:17, 16 March 2025)
- NSD-NRC-98-5646, Forwards Proprietary Results of AP600 Design Assurance Review,Per Commitment Contained in W Response to Violations Noted in Insp Rept 99900404/97-02. Proprietary Portion of Document Was Sent to Westinghouse + (18:10:18, 16 March 2025)
- ML20248J635 + (18:10:24, 16 March 2025)
- IR 05000458/1998005 + (18:10:26, 16 March 2025)
- ML20248J626 + (18:10:30, 16 March 2025)
- IR 05000445/1997018 + (18:10:31, 16 March 2025)
- ML20248J622 + (18:10:34, 16 March 2025)
- IR 05000327/1998001 + (18:10:35, 16 March 2025)
- ML20248J609 + (18:10:39, 16 March 2025)
- IR 05000298/1998012 + (18:10:43, 16 March 2025)
- 05000220/LER-1998-011-01, :on 980503,inadvertent Actuation of RPS Circuitry Occurred Due to Personnel Error.Fuse Was Replaced & SDC Was Placed Into Svc + (18:10:55, 16 March 2025)
- TAC:L32014 + (18:11:16, 16 March 2025)
- NRC-89-0052, Supplemental Reload Licensing Submittal for Fermi Plant Unit 2,Reload 1,Cycle 2 + (18:11:21, 16 March 2025)
- IR 05000331/1998004 + (18:11:35, 16 March 2025)
- 05000341/LER-1989-007, :on 890307,increasing Trend Observed in Vibration of Number 8 Bearing on Main Turbine Generator. Cause Undetermined.Turbine Balanced in Subsequent Outage. Disassembly &/Or Insp of Portions Planned + (18:11:39, 16 March 2025)
- IR 05000482/1998007 + (18:11:49, 16 March 2025)
- ML20248J413 + (18:11:56, 16 March 2025)
- IR 05000395/1998003 + (18:12:26, 16 March 2025)
- 05000313/LER-1998-002-03, :on 980505,automatic Actuation of CREVS Occurred Due to Higher than Normal Radiation at Detector When Filtration/Vacuum Assembly Was Moved in Adjacent Area. Revised Procedures to Add Noted Precautions + (18:12:33, 16 March 2025)
- ML20248J283 + (18:12:47, 16 March 2025)
- IR 05000344/1988039 + (18:12:54, 16 March 2025)
- TAC:M98441 + (18:12:57, 16 March 2025)
- 05000313/LER-1989-008, :on 890122,determined That When Bypass Valve GCH-29 Normally Open,Ability of Radiation Monitors to Perform Required Functions Not Ensured.Caused by Error in Design Change in Bypass Line & Valve + (18:13:00, 16 March 2025)
- TAC:67016 + (18:13:01, 16 March 2025)
- ML20248J228 + (18:13:06, 16 March 2025)
- ML20248J224 + (18:13:10, 16 March 2025)
- ML20248J217 + (18:13:14, 16 March 2025)
- ML20248J215 + (18:13:16, 16 March 2025)