Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20249B431 + (17:26:26, 16 March 2025)
- 05000336/LER-1998-011-01, :on 980519,determined That Valves Had Been Closing Completely Under No Flow Conditions.Caused by Improper Valve Setup & Failure to Verify Adequate Valve Closure.Valves Disassembled + (17:26:33, 16 March 2025)
- ML20249B396 + (17:26:39, 16 March 2025)
- 05000325/LER-1998-003-02, :on 980515,identified That Four of Eleven SRVs Exceeded TS Setpoint Limits.Cause of Setpoint Drift Being Evaluated.Srv Pilot Valve Assemblies Replaced W/Certified Spares Prior to Startup of Unit 1 + (17:26:41, 16 March 2025)
- 05000368/LER-1998-002-04, :on 980520,EFAS Automatically Actuated to Maintain Water Level in a Sg.Caused by Inadequate self- Checking of Plant Response by Control Room Operations Personnel.Operations Personnel Counseled + (17:26:43, 16 March 2025)
- ML20249B382 + (17:26:48, 16 March 2025)
- 05000285/LER-1998-005, :on 980520,161 Kv Transmission Line Circuit Breakers Tripped.Caused by Inappropriate Actuation of Deluge Sys for Transformer T1A-3.Transformer T1A-3 Was Checked to Ensure No Damage to Transformer Occurred + (17:26:57, 16 March 2025)
- IR 05000219/1998080 + (17:26:58, 16 March 2025)
- 05000277/LER-1998-003-01, :on 980513,failure to Meet TS for Main Control Room Emergency Ventilation,Was Identified.Caused by Failure to Follow GP-25 Procedure Guidance.Main Control Room Emergency Ventilation Relays Inspected for Loose Screws + (17:27:03, 16 March 2025)
- 05000277/LER-1997-010, :on 971229,failure of 2A Reactor Feedpump Turbine to Trip,Occurred.Caused by Main Control Room pushbutton.2A RFPT Trip Device Repaired,Reinstalled & Tested to Prove Operability + (17:27:05, 16 March 2025)
- 05000368/LER-1998-003-01, :on 980520,determined That Surveillance of Control Element Assembly Position Was Not Being Performed for One Control Element Assembly Group,Per Ts.Caused by Inadequate Verification.Change Implemented + (17:27:10, 16 March 2025)
- 05000277/LER-1997-009-01, Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys + (17:27:18, 16 March 2025)
- IR 05000155/1998003 + (17:27:31, 16 March 2025)
- ML20249B302 + (17:27:33, 16 March 2025)
- TXX-9814, Forwards Monthly Operating Repts for May 1998 for CPSES, Units 1 & 2.During Reporting Period,No Failures or Challenges to PORVs of SVs Occurred + (17:27:43, 16 March 2025)
- 05000423/LER-1998-030, :on 980515,noted That Channel Calibr of Hydrogen Recombiners Did Not Meet Requirements of SR 4.6.4.2.b.Caused by Deficient Initial or Subsequent Reviews. Modified Hydrogen Recombiner Channel Calibr Procedures + (17:27:48, 16 March 2025)
- ML20249B244 + (17:27:51, 16 March 2025)
- IR 05000245/1998206 + (17:28:03, 16 March 2025)
- 05000293/LER-1998-010, :on 980514,inadequate Surveillance Was Performed for Containment Cooling Flow Rate.Caused by Failure to Consider All safety-related Modes of Operation for Pump Sys.Problem Rept Was Written + (17:28:11, 16 March 2025)
- ML20249B175 + (17:28:18, 16 March 2025)
- ML20249B108 + (17:28:36, 16 March 2025)
- IR 05000423/1997082 + (17:29:03, 16 March 2025)
- ML20249B075 + (17:29:14, 16 March 2025)
- ML20249B073 + (17:29:17, 16 March 2025)
- ML20249B072 + (17:29:18, 16 March 2025)
- ML20249B060 + (17:29:26, 16 March 2025)
- IR 05000317/1998004 + (17:29:28, 16 March 2025)
- ML20249B047 + (17:29:31, 16 March 2025)
- ML20249B045 + (17:29:33, 16 March 2025)
- IR 05000423/1997083 + (17:30:22, 16 March 2025)
- 05000373/LER-1997-005-04, Forwards LER 97-005-04,IAW 10CFR50.73(a)(2)(ii).Commitments Made by Util,Encl + (17:30:49, 16 March 2025)
- TAC:M98778 + (17:30:51, 16 March 2025)
- ML20249B010 + (17:31:01, 16 March 2025)
- ML20249B006 + (17:31:08, 16 March 2025)
- IR 05000382/1997025 + (17:31:18, 16 March 2025)
- IR 05000482/1998010 + (17:31:20, 16 March 2025)
- 05000302/LER-1997-042-01, Forwards LER 97-042-01,which Discussed Inadequate Engineering Evaluation That Resulted in Loss of One Diverse RCS Leak Detection Capability.Long Term Resolution to Subject Condition,Provided + (17:31:35, 16 March 2025)
- 05000412/LER-1998-010-01, :on 980421,noted That non-safety Related Mechanical Seal Assembly Was Installed in Quench Spray Pump a 2QSS-P21A.Caused by Inadequate Knowledge & Training. Replacement Gland Seal Plates Were Procured + (17:31:53, 16 March 2025)
- ML20249A890 + (17:32:02, 16 March 2025)
- ML20249A888 + (17:32:06, 16 March 2025)
- L-98-120, Forwards Rev 1H to BVPS Unit 1 IST Program for Pumps & Valves, for Review & Approval.Rev 1H Is New Pump Relief Request (PRR-5) for Use of Expanded Acceptance Criteria Ranges for Diesel Generator Fuel Oil Transfer Pumps + (17:32:14, 16 March 2025)
- ML20249A845 + (17:32:26, 16 March 2025)
- ML20249A831 + (17:32:38, 16 March 2025)
- ML20249A821 + (17:32:42, 16 March 2025)
- IR 05000298/1998002 + (17:32:46, 16 March 2025)
- ML20249A805 + (17:32:49, 16 March 2025)
- TAC:MA0125 + (17:32:52, 16 March 2025)
- ML20249A781 + (17:32:57, 16 March 2025)
- ML20249A766 + (17:33:02, 16 March 2025)
- ML20249A761 + (17:33:04, 16 March 2025)
- ML20249A755 + (17:33:06, 16 March 2025)