ML20249B045
| ML20249B045 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/17/1998 |
| From: | Berkow H NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20249B046 | List: |
| References | |
| NUDOCS 9806220011 | |
| Download: ML20249B045 (8) | |
Text
c..
1 n eerg y
- a UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. Scee6 00M DUKE ENERGY CORPORATION NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE. INC.
DOCKET NO. 50-413 CATAWBA NUCLEAR STATION. li.NII_1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.166 License No. NPF-35 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Energy Corporation, acting for itself, North Carolina Electric Membership Corporation and Saluda River Electric Cooperative, Inc. (licenseec), dated May 22,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Cha.'ater I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been sat:sfied.
.4^
.. 2.
Accordingly the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-35 is nereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 166, which are attached hereto, are hereby incorporated into this license. Duke Energy Corporation shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION e
rt N. Berkow, Dircctor Project Directorate 11-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of issuance:
June 17, 1998
.__________m-__.__..__._--______.___.__m.__.
f
~~
.-.L#..,.
l.
~ ATTACHMENT TO LICENSE AMENDMENT NO.166 FACILITY OPERATING LICENSE NO. NPF-35 DOCKET NO. 50-413 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove Insert 3/4 4-9 3/4 4-9
._.a__.__.;..
a REACTOR COOLANT SYSTEM L3/4.4.3 PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.3 The. pressurizer shall be OPERABLE with a water volume of less.than or equal'to 1656 cubic feet and at least.two groups of pressurizer heaters each havir.g a' capacity of at least 150 kW.
APPLICABILITY: MODES 1, 2, and 3.
ACT10lf:
a.
With' one group of pressurizer heaters inoperable, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the
.following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. - With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the Reactor trip breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUT-DOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.3.1 The pressurizer water volume shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.4.3.2-The capacity.of each of the above required groups of pressurizer heaters shall-be verified by energizing'the heaters and measuring circuit current at least once per 92 days.
4.4.3.3 ' At least' once per 18 months, verify required pressurizer heaters are l
capable of beingf powered from an emergency power supply.
l K
'LCATAWBAl-UNIT I?
3/4.4 Amendment No.166'
pmtu y
k UNITED STATES g
j NUCLEAR REGULATORY CCMMISSION t
WASHINGTON, D.C. 206S0001 p%
/
DUKE ENERGY CORPORATION NORTH CAROLINA MUNICIPAL POWER AGENCY NO.1 PIEDMONT MUNICIPAL POWER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAR STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.158 License No. NPF-52 1.
The Nuclear Regulatory Commission (the Commission) has found that:
)
A.
The application for amendment to the Catawba Nuclear Station, Unit 2 (the facility) Facility Operating License No. NPF-52 filed by the Duke Energy Corporation, acting for itself, North Carolina Municipal Power Agency No.1 and
)
Piedmont Municipal Power Agency (licensees), dated May 22,1993, complies j
with the standards and requirements of the Atomic Energy Act of 1954, as l
amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applict.ble requirements have been satisfied.
L
n
, 2.
Accordingly, the license is hereby amended by page changes to the Technical '
Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-52 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.158, which are attached hereto, are hereby incorporated into this license. Duke Energy Corporation shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION erbert N. Berk w, Director roject Directorate ll Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes-Date ofissuance: June 17, 1998 L
l-
I ATTACHMENT TO LICENSE AMENDMENT NO.158 FACILITY OPERATING LICENSE NO. NPF-52 QQCKET NO. 50-414 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove insert 3/4 4-9 3/4 4-9
REACTOR COOLANT SYSTEM 3/4.4.3-PRESSURIZER LIMITING CONDITION FOR OPERATION-3.4.3 The pressurizer sha'l be OPERABLE with a water volume of less than or equal.to 1656 cubic feet and at least two groups of pressurizer heaters each having a capacity of at least 150 kW.
APPLICABILITY:~ MODES 1,'2, and 3.
ACTION:
- a.. With one group of pressurizer heaters inoperable, restore at.least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the
.following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With the pressurizer otherwise inoperable, be in at least HOT STANDBY
.with the Reactor trip breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUT-DOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.3.1 The pressurizer water volume shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.4.3.2 The capacity of each of the above required groups of pressurizer heaters shall be verified by energizing the heaters and measuring circuit
. current at least once per 92 days.
4.4.3.3. At least once per 18 months, verify required pressurizer heaters are l
capable of being powered from an emergency power supply.
l s
l CATAWBA-.. UNIT 2L
'3/4.4-9.
' Amendment No.l158 -
___. _ _________ _ _ _ _