Amend 222 to License NPF-3,revising TS Section 3/4.2
ML20249A761
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/11/1998
From: Hansen A
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20249A762 List:
References
NUDOCS 9806180198
Download: ML20249A761 (4)


Text

nero g

  • 4 UNITED STATES s

j NUCLEAR REGULATORY COMMISSION f

a WASHINGTON, D.C. 3064 6 0001

'+9.....,o TOLEDO EDIS0N COMPANY CENTERIOR SERVICE COMPANY Alm THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION. UNIT NO. I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.222 License No. NPF-3 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by the Toledo Edison Company, Centerior Service Company, and The Cleveland Electric Illuminating Company (the licensees) dated August 26, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon def.tnse and security or to the health and safety or the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-3 is hereby amended to read as follows:

9806180198 980611 PDR ADOCK 05000346 P

PM

!.L__----_

a f (2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 222, are hereby incorporated in the license.

l The Toledo Edison Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than 120 days after issuance.

I FOR THE U.S. NUCLEAR REGULATORY COMMISSION Allen G. Hansen, Project Manager Project Directorate III-3 l

Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: June 11, 1998 l

l

i a

ATTACHMENT TO LICENSE AMENDMENT NO. 222 FACILITY OPERATING LICENSE NO. NPF-3 DOCKET NO. 50-346 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

Bemove Insert TS 3/4 2-13 TS 3/4 2-13 i

i l

t t

l

[.

POWER DISTRIBUTION LIMITS DNB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB related parameters shall be maintained within the limits shown on Table 3.2-2.

a.

Reactor Coolant Hot Leg Temperature b.

Reactor Coolant Pressure c.

Reactor Coolant Flow Rate APPLICABILITY: MODE 1 ACTION:

If any parameter above exceeds its limit, restore the parameter to within its l

limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.2.5.1 Each of the parameters of Table 3.2-2 shall be verified to be within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.5.2 The Reactor Coolant System total flow rate shall be determined to be within its limit by measurement at least once per 18 months.

l l

DAVIS-BESSE, UNIT 1 3/4 2-13 Amendment No. 54,12h 222