ML20249B006
| ML20249B006 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/16/1998 |
| From: | Capra R NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20249B007 | List: |
| References | |
| NUDOCS 9806190273 | |
| Download: ML20249B006 (10) | |
Text
,. +. -
~
~
r"%,
f o,1 0 m..
8-NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3808548M PHILADELPHIA ELECTRIC COMPANY DOCKET NO. 50-352 LIMERICK GENERATING STATION UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.129 License No. NPF-39 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Philadelphia Electric Company (the licensee) dated January 27,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
~ The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
i 9906190273 990616 PDR A00cn 0S000352 P
PDR L
=
2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-39 is hereby amended to read as follows:
l Technical Specifications l
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.129, are hereby I
incorporated into this license. Philadelphia Electric Company sha!! operate the facility in j
accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date ofissuance and shall be implemented l
within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION O 8.
Ms Robert A. Capra, Director l
Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: June 16, 1998 t
._..__..._..m__.,___
ATTACHMENT TO LICENSE AMENDMENT NO.129 FACILITY OPERATING LICENSE NO. NPF-39 DOCKET NO. 50-352 Replace the following pages of the Appendix A Technical Spedfications with the attached pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change, Remove Inand 3/4 6-27 3/4 6-27 3/4 6-43a 3/4 6-43a
(
i
(
l L
l l
I
D I
1 1
2 2
2 5
5 5
9 9
9 P
5 5
5 5
5 5
5 5
4 4
4 6
3, S
5 5
5 5
5 5
3, 3,
3, 3,
3, 3,
ETO 9
1 9
5 9
5 9
5 9
9 5
N 2
1 2
3 2
3 2
3 2
2 3
)
S(
. AP LNA)
H A
C OG 0
G, G,
C l,
H, R
F F
SIF2 ISI(
C C
L L
B L
S P
E V
.P A)
L L
6 A
OF2 0
5 0
3 5
0 A
0 0
0 8
V SI(
8 4
6 2
4 6
/
4 6
8 I
.)
1 1
1 N
N
.EC O
XME I
AIS
)
T MT(
d A
e L
u O
)
)
n S
B B
i I
)
(
(
tn B
A A
A B
T
(
7 1
5 1
2 2
1 1
0 9
o N
C N
A 2
0 1
3 4
7 7
3 6
1
(
DO 5
0 0
0 0
0 0
0 0
0 0
E M
RI R 2
F F)
F F
F F
F F
F F
N ATE 1
l 10, I
l I
I l
l l
I I
OAI 1
A 2
2 5
5 5
9 9
9 2 C, BLR 1
1 T
TOR 5
5 5
5 5
5 5
5 4
4 4
~
3 N
USA V
V VB V
V V
V V
V V
V O
OIB H
H H(
H H
H H
H H
H H
6 C
3 YR E
A L
M N
B I
A O
R T
DI R P
RTE AAI OLR BOR A
NSA I IB TRAP H
S D
Y H
C U
N A
S R
L T
A R
U I
T F,
G P
L C
S S
EN S
F E
U Q
U NI R
N A
N N
A W
IL L
D O
H A
O H
O LO O
N N
M I
X X
L O
O O
A U
T E
T T
E F
TC P
I M
C S
C S
T T
I U
E E
U E
M ET N
C S
N S
N T
S N
UM TN O
U E
I I
I E
I S
T M
P B
P P
B I
N PM S
M R
M M
R N
O MN S
P P
P U
U U
U U
I I
UI E
M M
M P
T P
P T
M T
PA R
U U
U C
T P
P P
P I
I I
C C
C N
RN P
C C
C I
I I
U HO U
S S
S P
P P
C C
C F
RC S
C C
C H
H H
R R
R N
)
O 0,
I T
C, A
)
)
)
PR B
B B
B TE
(
(
(
(
EB A
A A
A B
NM 4
5 6
7 8
9 0
2 4
5 6
EU 0
0 0
0 0
0 1
1 1
1 1
PN 2
2 2
2 2
2 2
2 2
2 2
t*
b e
m E.
5-9W* h5d
TABLE 3.6.3-1 PRIMARY CONTAINMENT ISOLATION VALVES NOTATION NOTES (Continued)
- 35. These valves are in lines that are below the minimum water level in the suppression pool, are part of closed systems outside primary containment, and are in portions of lines which a water seal will be present following an accident. Therefore, 10CFR50,- Appendix J, Type C testing is not required.
- 36. This is a remote manual isolation valve.
Valve stroke time does not provide an input to the Safety Analysis.
Therefore, verification of isolation time is not required. Valve performance is monitored in accordance with Technical Specification 4.0.5.
i t
l LIMERICK - UNIT 1 3/4 6-43a Amendment No. ff0,129
. 7 ~ ;--
T_
~ ~ ~
4 pa r*49 k
UNITED STATES y
s NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 4 001
- ses*
PHILADELPHIA ELECTRIC COMPANY DOCKET NO. 50-353 LIMERICK GENERATING STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 90 License No. NPF-85 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Philadelphia Electric Company (the licensee) dated January 27,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
I E
1 l
.._.__...__.m.
d 2-
- 2.
AccordinC y, the license is amended by changes to the Technical Specifications as l
indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-85 is hereby amended to read as follows:
Technical sascific.st;cns The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 90, are hereby incorporated in the license. Philadelphia Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION 00
",%Y Robert A. Capra, Director Project Directorate 1-2 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: June 16, 1998 I
l
ATTACHMENT TO LICENSE AMENDMENT NO. 90 FACILITY OPERATING LICENSE NO. NPF-85 DOCKET NO. 50-353 Replace the following pages of the Appendix A Technical Specifications with the attached pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
Remove JDand 3/4 6-27 3/4 6-27 3/4 6-43a 3/4 6-43a J
i j
P 7
3, S
6 6
6 6
6 6
E 3,
3, 3,
3, 3,
3, TO 9
1 9
6 9
6 9
6 9
9 6
N 2
1 2
3 2
3 2
3 2
2 3
)
S(
H A
C OG 0
G, G,
R C
L, H,
SIF2 F
F ISI(
C C
L L
8 L
S E
V P
L P
A
.A)
V L
6 OF2 N
SI(
O I
.)
I
.EC
)
T XME 0
0 0
A d
A AI S 8
5 6
3 5
6
/
0 0
0 e
L MT(
1 4
1 2
4 1
N 4
6 8
8 u
O n
S i
I tn T
)
)
o N
B B
C E
)
(
(
(
M B
A A
A B
(
7 1
5 I
2 2
1 1
0 9
I N
A 2
0 1
3 4
7 7
3 6
1 1
A DO 5
0 0
0 0
0 0
0 0
0 0
T RIR 2
F F)
F F
F F
F F
F F
3 N
ATE 2
2 20, 2
2 2
2 2
2 2
2 O
OAI 6
C BLR 1
1 2 C, 2
2 5
5 5
9 9
9 5
5 5
5 5
4 4
4 3
TOR 5
5 5
Y USA V
V VB V
V V
V V
V V
V R
OIB H
H H(
H H
H H
H H
H H
E A
L M
B_
I A
R N
T.
P O
DIR RTE AAI A
OLR BOR T
NSA R
IIB AP HS D
Y H
C U
N A
S R
L A
R U
I T
E.
T G
P L
C S
S EN S
F E
U D
U NI R
N A
N N
A W
IL L
D O
H A
O H
O LO O
N N
M I
X I
X L
O O
O A
U T
E T
T E
F TC P
I M
C S
C S
T T
I U
E E
U i
M ET N
C S
N S
N T
S t
U TN O
U E
I I
I M
E I
S T
M P
B P
P B
I P
S M
R M
M R
N MM N
S P
P P
U U
U U
U I
O I
UI E
M M
M P
T P
P T
M T
PA R
U U
U C
T P
P P
P I
I I
C C
C N
RN P
C C
C I
I I
U HO U
S S
S P
P P
C C
C F
RC S
C C
C H
H H
R R
R N
)
O D,
I T
C, A
)
)
)
RR B
B B
B TE
(
(
(
(
EB A
A A
A 8
NM 4
5 6
7 8
9 0
2 4
5 6
EU 0
0 0
0 0
0 1
1 1
1 1
PN 2
2 2
2 2
2 2
2 2
2 2
$;;: n 1[ c$ "
k
>j o.
g$8
' 1 l!
TABLE 3.6.3-1 PRIMARY CONTAINMENT ISOLATION VALVES NOTATION HQILS (Continued)
- 36. These valves are in lines that are below the minimum water level in the suppression pool, are part of closed systems outside primary containment, and are in portions of lines which a water seal will be present following an accident. Therefore, 10CFR50, Appendix J, Type C testing is not required.
- 37. This is a remote manual isolation valve.
Valve stroke time does not provide an input to the Safety Analysis.
Therefore, verification of isolation time is not required. Valve performance is monitored in accordance with Technical Specification 4.0.5.
t j
LIMERICK - UNIT 2 3/4 6-43a Amendment No. 73,90
._-_ _