Amend 183 to License DPR-20,revises Auxiliary Feedwater Sys TS to Allow Two AFW Flow Control Valves in One Train to Be Inoperable for Up to 72 Hours
ML20249A888
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/10/1998
From: Robert Schaaf
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20249A889 List:
References
NUDOCS 9806190057
Download: ML20249A888 (3)


Text

  1. M4

~~

' 4 UNITED STATES p

s "

j NUCLEAR REGULATORY COMMISSION

\\.....[2 WASHINGTON, D.C. 3000H001 CONSUMERS ENERGY COMPANY DOCKET NO. 50-255 PALIGADES Pl. ANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.183 License No. DPR-20 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Consumers Energy Company (the licensee) dated March 13,1998, as supplemented March 30,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1:

B.

The facility will operate in conformity with the application, the provisions of the

' Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfed.

- 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to the license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-20 is hereby amended to read as follows:

The Technical Specifications contained in Appendix A, as revised through Amendment No.183

, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Consumers Energy Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of issuance.

FOR THE NUCL REGULAT RY COMMISSION

=

Robert G. Schaaf, Project Manager Project Directorate 111-1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation L

Attachment:

. Changes to the Technical.

. Specifications Date of Issuance: June 10, 1998-9906190057 99 % 10 5

L POR A00cK 0S000255 n.

P PDR O

ATTACHMENT TO LICENSE AMENDMENT NO. 183 s

i FACILITY OPERATING LICENSE NO. DPR-20 l

DOCKET NO. 50-255 l

l Revise Appendix A Technical Specifications by removing the pages identifed below and inserting the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

REMOVE INSERT 3-38a 3-38a 4

3.5 STEAM AND FEEDWATER SYSTEMS (Cont'd)

L 3.5.2 (Continued) l c.

The fire water makeup to the Auxiliary Feedwater Pump Suction (P-8A and P-88) may be inoperable for a period of 7 days provided the pump service water makeup to P-8C, pump P-8C, and its l

corresponding flow control valves are operable.

d.

The service water makeup to the Auxiliary Fcedwater Pump Suction l

(P-80) may be inoperable for a period of 7 days provided the fire water. makeup to P-8A & P-88, pumps P-8A and P-8B and their corresponding flow control valves are operable.

e.

One or two flow control valves may be inoperable for a period of l

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the corresponding redundant flow control valves I

and an associated pump in the other train are operable.

3.5.3 With the Primary Coolant System at a temperature greater than 300*F and if the system does not satisfy the requirements of Specification 3.5.1 or the conditions of Specification 3.5.2 except as noted in

-Specification 3.5.4, the reactor shall be placed in hot standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, hot shutdown within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.5.4 With all Auxiliary Feedwater Pumps inoperable immediately initiate corrective action to restore at least one Auxiliary Feedwater Pump to OPERABLE status as soon as possible and reduce power within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the lowest stable power level consistent with reliable Main Feedwater System operation.

i 3-38a Amendment No.

%, Mt.183 i

-l