Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1991-70, Improper Installation of Instrumentation Modules + (15:18:28, 16 January 2025)
- Information Notice 1991-73, Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve + (15:18:29, 16 January 2025)
- Information Notice 1991-74, Changes in Pressurizer Safety Valve Setpoints Before Installation + (15:18:30, 16 January 2025)
- Information Notice 1991-47, Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test + (15:18:31, 16 January 2025)
- IR 05000324/2003003 + (15:18:36, 16 January 2025)
- Information Notice 1991-48, False Certificates of Conformance Provided by Westinghouse Electric Supply Company for Refurbished Commercial-Grade Circuit Breakers + (15:18:37, 16 January 2025)
- Information Notice 1991-49, Enforcement of Safety Requirements for Radiographers + (15:18:38, 16 January 2025)
- BW030034, Core Operating Limits Report, Braidwood Unit 1 Cycle 11 + (15:18:39, 16 January 2025)
- IR 05000413/2003002 + (15:19:33, 16 January 2025)
- L-2003-082, Annual Radiological Environmental Operating Report for Calendar Year 2002 + (15:19:34, 16 January 2025)
- ML031190420 + (15:19:35, 16 January 2025)
- ML031190415 + (15:19:37, 16 January 2025)
- ML031190412 + (15:19:38, 16 January 2025)
- Information Notice 1991-77, Shift Staffing at Nuclear Power Plants + (15:19:39, 16 January 2025)
- Information Notice 1991-76, 10 CFR Parts 21 & 50.55(e) Final Rules + (15:19:40, 16 January 2025)
- Information Notice 1991-80, Failure of Anchor Head Threads on Post-Tensioning System During Surveillance Inspection + (15:19:41, 16 January 2025)
- Information Notice 1991-81, Switchyard Problems That Contribute to Loss of Offsite Power + (15:19:41, 16 January 2025)
- Information Notice 1991-50, A Review of Water Hammer Events After 1985 + (15:19:45, 16 January 2025)
- Information Notice 1991-51, Inadequate Fuse Control Programs + (15:19:45, 16 January 2025)
- Information Notice 1991-83, Solenoid-Operated Valve Failures Resulted in Turbine Overspeed + (15:19:46, 16 January 2025)
- ML031190386 + (15:19:47, 16 January 2025)
- IR 05000275/2003005 + (15:20:54, 16 January 2025)
- Information Notice 1991-85, Potential Failures of Thermostatic Control Valves for Diesel Generator Jacket Cooling Water + (15:20:55, 16 January 2025)
- ML031190375 + (15:20:55, 16 January 2025)
- Information Notice 1991-52, Nonconservative Errors in Overtemperature Delta-Temperature Setpoint Caused by Improper Gain Settings + (15:20:56, 16 January 2025)
- ML031190369 + (15:20:57, 16 January 2025)
- Information Notice 1991-53, Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components + (15:20:58, 16 January 2025)
- Information Notice 1989-48, Design Deficiency in the Turbine-Driven Auxiliary Feedwater Pump Cooling Water Systems + (15:20:58, 16 January 2025)
- Information Notice 1989-47, Potential Problems with Worn or Distorted Hose Clamps on Self-Contained Breathing Apparatus + (15:20:59, 16 January 2025)
- Information Notice 1989-46, Confidentiality of Exercise Scenarios + (15:21:00, 16 January 2025)
- HNP-03-043, Annual Environmental Operating Report + (15:21:01, 16 January 2025)
- Information Notice 1989-45, Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts + (15:21:01, 16 January 2025)
- Information Notice 1989-43, Permanent Deformation of Torque Switch Helical Springs in Limitorque SMA-Type Motor Operators + (15:21:02, 16 January 2025)
- ML031190352 + (15:21:03, 16 January 2025)
- Information Notice 1991-54, Foreign Experience Regarding Boron Dilution + (15:21:04, 16 January 2025)
- ML031190342 + (15:21:04, 16 January 2025)
- ML031190332 + (15:21:05, 16 January 2025)
- IR 05000361/2003002 + (15:21:09, 16 January 2025)
- ML031190326 + (15:21:13, 16 January 2025)
- Information Notice 1991-55, Failures Caused by Improperly Adjusted Test Link in 4.6 Kv General Electric Switchgear + (15:21:14, 16 January 2025)
- Information Notice 1991-57, Operational Experience on Bus Transfers + (15:21:15, 16 January 2025)
- ML031190276 + (15:21:16, 16 January 2025)
- Information Notice 1991-56, Potential Radioactive Leakage to Tank Vented to Atmosphere + (15:21:17, 16 January 2025)
- DCL-2003-530, Transmittal of First Quarter 2003 Report on Discharge Monitoring at Diablo Canyon Power Plant + (15:21:18, 16 January 2025)
- IR 05000254/2003003 + (15:21:30, 16 January 2025)
- Information Notice 1991-58, Dependency of Offset Disc Butterfly Valves Operation on Orientation with Respect to Flow + (15:21:35, 16 January 2025)
- ML031190244 + (15:21:36, 16 January 2025)
- Information Notice 1991-59, Problems with Access Authorization Programs + (15:21:36, 16 January 2025)
- ML031190237 + (15:21:37, 16 January 2025)
- Information Notice 1991-60, False Alarms of Alarm Ratemeters Because of Radiofrequency Interference + (15:21:38, 16 January 2025)
- 05000397/LER-2003-006, Regarding Failure to Restore Emergency Diesel Generator within TS Completion Time & Subsequent Plant Shutdown + (15:21:42, 16 January 2025)
- ML031190230 + (15:21:43, 16 January 2025)