ENWERGY NORTH WEST P0. Box 968
- Richland, Washington 99352-0968 April 17, 2003 G02-03-065 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 REPORT OF COMPLIANCE WITH INTERIM COMPENSATORY MEASURES FOR DRY INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS
References:
- 1) Letter dated October 16, 2002, NRC to JV Parrish (Energy Northwest),
"Issuance of Order for Interim Safeguards and Security Compensatory Measures for Columbia Generating Station"
- 2) Letter G02-02-179, dated November 4, 2002, JV Parrish (Energy Northwest) to NRC, "Response to Order for Interim Safeguards and Security Compensatory Measures for an Independent Spent Fuel Storage Installation"
Dear Sir or Madam:
Pursuant to 10 CFR 50.4 and Enclosure 1,Section III.C.2 of Reference 1, Energy Northwest is hereby reporting full compliance with the interim compensatory measures specified in Section C of Enclosure 3 to Reference 1 has been achieved at Columbia Generating Station (Columbia).
These compensatory measures for Independent Spent Fuel Storage Installations (ISFSI) located within owner controlled areas have been implemented at Columbia in consideration of the guidance provided to the Commission by the Nuclear Energy Institute on October 18, 2002. Energy Northwest acknowledges that these prudent, interim measures are required to address the current threat environment that exists following the terrorist attacks of September 11, 2001 in a consistent manner throughout the nuclear ISFSI community. Energy Northwest also acknowledges that the requirements contained in the Order will remain in effect until notification from the Commission that a significant change in the threat environment has occurred, or until the Commission determines that other changes are needed.
REPORT OF COMPLIANCE WITH INTERIM COMPENSATORY MEASURES FOR DRY INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS Page 2 of 2 Should you have any questions or desire additional information regarding this matter, please call Ms. CL Perino at (509) 377-2075.
Respectfully, JV Parrish Chief Executive Officer Mail Drop 1023 cc: EW Merschoff-NRC - RIV TC Poindexter - Winston & Strawn SJ Collins, Director-NRC - NRR NRC Sr. Resident Inspector - 988C BJ Benney - NRC - NRR GM Tracy - NRC NSIR RN Sherman - BPA/1399
STATE OF WASHINGTON)
COUNTY OF BENTON
)
Subject:
Report of compliance with interim compensatory measures for dry Independent Spent Fuel Storage Installations I, JV Parrish, being duly sworn, subscribe to and say that I am the Chief Executive Officer for ENERGY NORTHWEST, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief that the statements made in it are true.
DATE 4 pi
- I --I 2003 JY arrish Chief Executive Officer Zs tMA On this date personally appeared before me JV-Paffish, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this L-'1-day of Em S 2003 Notary Public i an -for the STATE OF WASHINGTON Residing at 1
5= - a 'J '-'
My Commission expires_
a; - l 3- (')