Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065T689 + (23:51:34, 16 December 2024)
- JAFP-82-0020, Forwards Monthly Operating Rept for Dec 1981 + (23:51:35, 16 December 2024)
- ML20065T684 + (23:51:35, 16 December 2024)
- ML20065T675 + (23:51:36, 16 December 2024)
- 05000317/LER-1981-025, Forwards LER 81-025/03L-0 + (23:51:37, 16 December 2024)
- ML20065T671 + (23:51:38, 16 December 2024)
- 05000265/LER-1990-012-08, :on 901124,automatic Function of HPCI Pump Flow Indicating Controller (FIC) 2-2340-1 Failed Due to Unknown Causes.Hpci Declared Inoperable & Sys Outage Rept Initiated + (23:51:40, 16 December 2024)
- ML20065T667 + (23:51:41, 16 December 2024)
- ML20065T666 + (23:51:41, 16 December 2024)
- ML20065T651 + (23:51:42, 16 December 2024)
- ML20065T663 + (23:51:42, 16 December 2024)
- ML20065T645 + (23:51:43, 16 December 2024)
- ML20065T648 + (23:51:43, 16 December 2024)
- ML20065T637 + (23:51:44, 16 December 2024)
- ML20065T635 + (23:51:45, 16 December 2024)
- W3P90-1919, Forwards Basis for 901224 Request for Temporary Waiver of Compliance from Tech Spec 3/4.3.4, Turbine Overspeed Protection, Surveillance Requirements 4.3.4.2a & B, Demonstrating Operability of Overspeed Protection Sys + (23:51:46, 16 December 2024)
- 05000328/LER-1990-017-02, :on 901123,reactor Trip Occurred as Result of low-pressurizer Pressure.Caused by Misunderstanding by Lead Reactor Operator & Failure to Maintain T Average & T Ref During Shutdown + (23:51:47, 16 December 2024)
- ML20065T615 + (23:51:49, 16 December 2024)
- ML20065T612 + (23:51:49, 16 December 2024)
- ML20065T611 + (23:51:50, 16 December 2024)
- PY-CEI-NRR-1272, Informs That Generic Ltr 89-10,Suppl 2 MOV Program Description & Schedule for Facility Complete & Available Onsite for Review + (23:51:50, 16 December 2024)
- 05000328/LER-1990-018-01, :on 901121,limiting Condition for Operation Entered RHR cross-tie Valve to Closed to Perform Maint to Correct Valve Torque Switch Setting.Caused by Inadequate Training of Personnel.W/Undated Ltr + (23:51:56, 16 December 2024)
- ML20065T601 + (23:51:57, 16 December 2024)
- ML20065T600 + (23:51:57, 16 December 2024)
- ML20065T599 + (23:51:58, 16 December 2024)
- ML20065T597 + (23:51:58, 16 December 2024)
- ML20065T595 + (23:51:59, 16 December 2024)
- ML20065T596 + (23:51:59, 16 December 2024)
- 0CAN088213, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-13 & 50-368/82-10.Corrective Actions: Administrative Procedure 1000.28 Revised During 820414 & 0621 for Installation & Removal of Jumpers + (23:52:00, 16 December 2024)
- ML20065T594 + (23:52:00, 16 December 2024)
- ML20065T587 + (23:52:07, 16 December 2024)
- ML20065T586 + (23:52:11, 16 December 2024)
- ML20065T585 + (23:52:12, 16 December 2024)
- ML20065T584 + (23:52:12, 16 December 2024)
- ML20065T577 + (23:52:13, 16 December 2024)
- ML20065T574 + (23:52:14, 16 December 2024)
- ML20065T573 + (23:52:15, 16 December 2024)
- ML20065T572 + (23:52:15, 16 December 2024)
- ML20065T570 + (23:52:16, 16 December 2024)
- ML20065T571 + (23:52:16, 16 December 2024)
- ML20065T566 + (23:52:19, 16 December 2024)
- 05000277/LER-1990-003-01, :on 900310,primary Containment Leakage Rate Limit Exceeded Tech Spec Requirements Due to Excessive Through Seat Leakage on Main Steam Line Drain Isolation Valves MO-74 & MO-77 + (23:52:21, 16 December 2024)
- ML20065T564 + (23:52:22, 16 December 2024)
- ML20065T563 + (23:52:23, 16 December 2024)
- 05000352/LER-1990-027-01, :on 901120,reactor Scram Signal Occurred When Intermediate Range Monitor F Spiked Upscale Causing RPS Channel B Half Scram.Caused by Equipment Problem Coincident W/Performance of RPS Surveillance Procedure + (23:52:25, 16 December 2024)
- ML20065T561 + (23:52:26, 16 December 2024)
- ML20065T559 + (23:52:26, 16 December 2024)
- 05000352/LER-1990-031-01, :on 901203,contract Fire Watch Coordinator Discovered That Surveillance Test Procedure ST-7-022-371-1, Unit 1 Fire Door Daily Position Check, Not Performed on 901202 + (23:52:28, 16 December 2024)
- ML20065T554 + (23:52:29, 16 December 2024)
- ML20065T552 + (23:52:30, 16 December 2024)
- 05000352/LER-1990-028-01, :on 901126,instrumentation & Controls Personnel Discovered That Facility Tech Specs Required Surveillance Requirements Not Met for Two Intermediate Range Monitors.W/ + (23:52:32, 16 December 2024)
- 05000353/LER-1990-019-01, :on 901101,various Actuations of Primary Containment & Reactor Vessel Isolation Control Sys,Esf & Channel B RPS half-scram Occurred.Caused by Damaged Connector in Inverter Circuitry + (23:52:35, 16 December 2024)