ML20065T666

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Failure to Examine Structural Steel Detail Drawings Against Ae Drawings for Changes or Conflicts.Initially Reported on 820622.Contractor Instructed to Review Drawings for Conflicts.Next Rept by 830211
ML20065T666
Person / Time
Site: Marble Hill
Issue date: 10/22/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-15, SVP-0050-82, SVP-50-82, NUDOCS 8211020631
Download: ML20065T666 (2)


Text

e .

bm3 PUBLIC SERVICE INDIANA S. W. Shields October 22, 1982 Senior Vice President - S82-15 Nuclear Division SVP-0050-82 Mr. James G. Keppler Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U.S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 22, 1982 Mr. T. D. Geib of Public Service Company of Indiana, Inc.

(PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). The primary civil contractor, Newberg-Marble Hill (NMH) was utilizing the structural steel fabricator's detail drawings for erection and inspection of structural steel. This fabricator had gone out of business and no longer reviewed the architect-engineer's, Sargent & Lundy, drawings for design changes or conflicts. The NMH quality assurance program did not provide for this review and the potential therefore exists that a number of design changes may not be shown on detail drawings used by NMH production and inspection personnel to erect structural steel.

PSI has instructed NMH to review the detail drawings against Sargent &

Lundy's design drawings for revisions and potential conflicts during future con struction activities. PSI has also instructed Sargent & Lundy to review the detail drawings against their design drawings and advise PSI of any changes that might be necessary to bring the previously erected structural steel into conformance with the plant design.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before February 11, 1983. If you have any questions on this report, please feel free tt, .ontact me.

Sincerely, 8211020631 821022 S. W. SHIELDS gDRADOCK 05000546 PDR SWS:TDG:bmh 7

P. O. Box 190, New Washington, Indiana 47162 812. 289.1000 OCT 2 51982

1 PUBUC SERVICE INDIANA Le t ter : J. G. Keppler October 22, 1982 S82-15 SVP-0050-82 cc: Director of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 J. E. Konklin J. J. Harrison