Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069B319 + (16:14:24, 16 December 2024)
- ML20069B303 + (16:14:48, 16 December 2024)
- ML20069B305 + (16:14:48, 16 December 2024)
- ML20069B300 + (16:14:59, 16 December 2024)
- ML20069B299 + (16:14:59, 16 December 2024)
- ML20069B295 + (16:15:00, 16 December 2024)
- ML20069B289 + (16:15:01, 16 December 2024)
- ML20069B290 + (16:15:01, 16 December 2024)
- L-81-528, Final Deficiency Rept Re Indications in End Prep of Valve I-MV-08-1A,initially Reported 811117.Discontinuities in Weld Metal Not Completely Removed When Valve Cut Out of Line. Incident Determined Not Reportable + (16:15:02, 16 December 2024)
- ML20069B287 + (16:15:02, 16 December 2024)
- ML20069B284 + (16:15:03, 16 December 2024)
- TAC:42216 + (16:15:04, 16 December 2024)
- ML20069B275 + (16:15:11, 16 December 2024)
- ML20069B274 + (16:15:11, 16 December 2024)
- ML20069B258 + (16:15:28, 16 December 2024)
- 05000316/LER-1981-065, Forwards LER 81-065/04L-0 + (16:15:35, 16 December 2024)
- ML20069B242 + (16:15:43, 16 December 2024)
- ML20069B241 + (16:15:43, 16 December 2024)
- 05000369/LER-1981-179, Forwards LER 81-179/03L-0.Detailed Event Analysis Encl + (16:15:45, 16 December 2024)
- ML20069B229 + (16:15:45, 16 December 2024)
- AECM-81-494, Second Interim Deficiency Rept Re Lower Flow Rate in ESF Electrical Switchgear Room Cooling Sys,Initially Reported 810303.Measurement of Flow Rates at Various Locations Continuing.Next Rept by 820131 + (16:15:46, 16 December 2024)
- W3P83-0547, Forwards Proposed Rev to FSAR Committing to Set of Low Power Natural Circulation Tests in Satisfaction of Operator Training Requirements of NUREG-0737,Item I.G.1 + (16:15:46, 16 December 2024)
- 05000261/LER-1981-031-01, /01T-0:on 811201,pressurizer Power Operated Relief Valve Block Valves Were Determined Not to Meet Design Specs. Valve Motor Operators Failed to Shut Valves Completely Following 811130 Transient.Block Valves Closed Manually + (16:15:48, 16 December 2024)
- 05000364/LER-1981-049-03, /03L-0:on 811109,B2G Sequencer on Diesel Generator 2B Failed to Meet Time Requirements for Picking Up Step 5 While Performing Operability Test.Caused by Setpoint Drift of Agastat Timer.Timer Adjusted + (16:15:51, 16 December 2024)
- 05000324/LER-1983-025-03, /03L-0:on 830216,closed Position Indication for Drywell to Suppression Pool Vacuum Breaker X18C Could Not Be Achieved.Caused by Problem W/Vacuum Breaker Closed Position Limit Switch LB-240-794.Problem Will Be Investigated + (16:15:53, 16 December 2024)
- ML20069B202 + (16:15:54, 16 December 2024)
- 05000324/LER-1981-127, Forwards LER 81-127/03L-0 + (16:15:55, 16 December 2024)
- ML20069B198 + (16:15:55, 16 December 2024)
- 05000296/LER-1981-068, Forwards LER 81-068/03L-0 + (16:15:57, 16 December 2024)
- 05000324/LER-1983-025, Forwards LER 83-025/03L-0 + (16:15:58, 16 December 2024)
- 05000364/LER-1981-047-03, /03L-0:on 811109,indicator PI3371B of Steam Generator 2B Pressure Instrumentation Loop to Hot Shutdown Panel Failed Low.Caused by Loop Power Supply Card Failure. Card Replaced + (16:15:59, 16 December 2024)
- ML20069B183 + (16:16:00, 16 December 2024)
- ML20069B180 + (16:16:01, 16 December 2024)
- ML20069B182 + (16:16:01, 16 December 2024)
- 05000302/LER-1983-006-03, /03L-0:on 830203,during Control Rod Exercise Surveillance,Absolute Position Indication for Rod 6,group 2 Failed to Indicate +/-2% Motion Per Tech Spec Requirements. Caused by Failed Reed Switch.Tube Replaced + (16:16:05, 16 December 2024)
- 05000321/LER-1981-126-03, /03L-0:on 811123,A71-K1C Reactor low-low Level Relay Found Inoperable.Caused by Component Failure Due to Insulation Breakdown in Coil.Relay Replaced + (16:16:07, 16 December 2024)
- 05000321/LER-1981-126, Forwards LER 81-126/03L-0 + (16:16:08, 16 December 2024)
- 05000324/LER-1981-126-03, /03L-0:on 811119,during Routine Surveillance, Control Room Chart recorder/indicator,2-CAC-AR-1263,model Mark Ii,Discovered Showing Downscale Trend in Drywell Oxygen Concentration.Caused by Failure to Perform Required Maint + (16:16:10, 16 December 2024)
- ML20069B161 + (16:16:11, 16 December 2024)
- ML20069B157 + (16:16:12, 16 December 2024)
- ML20069B159 + (16:16:12, 16 December 2024)
- 05000296/LER-1981-067-03, /03L-0:on 811116,continuous Air Monitor 3-RM-90-249 Failed to Sample Turbine Room Roof Exhaust W/ Fans in Operation.Caused by Worn Std V-belt for Schwitzer Model 325 Vacuum Pump.Belt Replaced & Monitor Tested + (16:16:14, 16 December 2024)
- ML20069B154 + (16:16:15, 16 December 2024)
- 05000302/LER-1983-006, Forwards LER 83-006/03L-0 + (16:16:16, 16 December 2024)
- 05000324/LER-1981-126, Forwards LER 81-126/03L-0 + (16:16:17, 16 December 2024)
- 05000296/LER-1981-067, Forwards LER 81-067/03L-0 + (16:16:18, 16 December 2024)
- 05000328/LER-1981-143-03, /03L-0:on 811115,w/shutdown Banks Withdrawn, Reactor Tripped on lo-lo Steam Generator Level Due to Failure of 2-LCV-3-171.Caused by Dirty Solenoid.Solenoid Cleaned & Cover Replaced + (16:16:20, 16 December 2024)
- 05000328/LER-1981-143, Forwards LER 81-143/03L-0 + (16:16:24, 16 December 2024)
- 05000321/LER-1981-130-03, /03L-0:on 811130,during Normal Power Operation,Rhr Heat Exchanger 1E11-B001B Was Taken Out for Insp of RHR Svc Water Side.Rhr Svc Water Isolated from RHR Heat Exchanger B for Maint.Subsystem Determined Inoperable on 811203 + (16:16:26, 16 December 2024)
- ML20069B113 + (16:16:27, 16 December 2024)
- 05000321/LER-1981-130, Forwards LER 81-130/03L-0 + (16:16:28, 16 December 2024)
- ML20069B108 + (16:16:31, 16 December 2024)