Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069B832 + (16:10:33, 16 December 2024)
- ML20069B828 + (16:10:34, 16 December 2024)
- ML20069B830 + (16:10:34, 16 December 2024)
- 05000302/LER-1982-003-01, /01T-0:on 820128,RCS Pressure Boundary Leak Found in Valve Body of MUV-43.Caused by Thermally Induced Cyclic fatigue.MUV-43 Removed.New Valve Will Be Installed in Improved Location + (16:10:36, 16 December 2024)
- ML20069B824 + (16:10:38, 16 December 2024)
- ML20069B822 + (16:10:38, 16 December 2024)
- B14848, Responds to Generic Ltr 92-01,Rev 1, Reactor Vessel Structural Integrity, Specifically Verification of Reactor Vessel Integrity Database.Response Accurately Reflected in Database W/Listed Exception + (16:10:39, 16 December 2024)
- ML20069B820 + (16:10:39, 16 December 2024)
- ML20069B812 + (16:10:42, 16 December 2024)
- ML20069B811 + (16:10:43, 16 December 2024)
- ML20069B808 + (16:10:44, 16 December 2024)
- ML20069B807 + (16:10:44, 16 December 2024)
- ML20069B805 + (16:10:45, 16 December 2024)
- PY-CEI-NRR-0026, Addresses SER Confirmatory Issue 36 Re 3-h Fire Rating for Gypsum Walls.Research Five Technology Group of Gold Bond Bldg Products Ltr Supplying Verification of 3-h Fire Rating Encl + (16:10:46, 16 December 2024)
- 05000325/LER-1982-014-03, /03L-0:on 820127,post-accident Monitors 2-CAC-AQH-1260-1 & 3 & 1262-1 & 3 Showed Upscale Indications,Along W/Several Unit 1 Monitors.Caused by Moisture Accumulation in Sampling Chanbers.Moisture Removed + (16:10:47, 16 December 2024)
- ML20069B801 + (16:10:48, 16 December 2024)
- ML20069B798 + (16:10:49, 16 December 2024)
- ML20069B797 + (16:10:50, 16 December 2024)
- 05000325/LER-1982-014, Forwards LER 82-014/03L-0 + (16:10:51, 16 December 2024)
- ML20069B793 + (16:10:51, 16 December 2024)
- CNL-20-025, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision + (16:10:52, 16 December 2024)
- PY-CEI-NRR-0022, Forwards Responses to NRC Questions 420.03,420.05 & 420.06.Questions Also Identified as SER Open Item 13, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation & 14, Control Sys Failure + (16:10:52, 16 December 2024)
- 05000324/LER-1982-021-03, /03L-0:on 820129,routine Comparison of Suppression Chamber Water Level Indicators on RTGB Revealed 1.5 Inch Discrepancy Between Narrow & Wide Range Instruments.Caused by Inoperability of RTGB Level Instruments + (16:10:54, 16 December 2024)
- ML20069B785 + (16:10:55, 16 December 2024)
- LIC-94-0097, Forwards Fort Calhoun Station Performance Indicators for Apr 1994 + (16:10:56, 16 December 2024)
- ML20069B784 + (16:10:56, 16 December 2024)
- 05000324/LER-1982-021, Forwards LER 82-021/03L-0 + (16:10:57, 16 December 2024)
- ML20069B773 + (16:10:57, 16 December 2024)
- ML20069B770 + (16:10:58, 16 December 2024)
- ML20069B766 + (16:10:59, 16 December 2024)
- ML20069B765 + (16:10:59, 16 December 2024)
- ML20069B764 + (16:11:00, 16 December 2024)
- ML20069B763 + (16:11:01, 16 December 2024)
- ML20069B761 + (16:11:01, 16 December 2024)
- ML20069B760 + (16:11:05, 16 December 2024)
- ML20069B755 + (16:11:06, 16 December 2024)
- ML20069B756 + (16:11:06, 16 December 2024)
- ML20069B750 + (16:11:07, 16 December 2024)
- ML20069B754 + (16:11:07, 16 December 2024)
- ML20069B745 + (16:11:09, 16 December 2024)
- ML20069B741 + (16:11:09, 16 December 2024)
- ML20069B738 + (16:11:10, 16 December 2024)
- 05000454/LER-1994-004-09, :on 940423,discovered That Oc Waste Gas Decay Had Not Been Sampled After Radioactive Matls Added.Caused by Poor Work Practices & Inadequate Training.Corrective Action:Personnel Retrained + (16:11:12, 16 December 2024)
- PY-CEI-NRR-0023, Responds to Equipment Qualification Branch 830204 Request for Addl Info Re SER Confirmatory Issue 7, Generic BWR Safety/Relief Valve Operability Test Results & TMI Action Item II.D.1, Reliability Engineering + (16:11:13, 16 December 2024)
- ML20069B718 + (16:11:13, 16 December 2024)
- B14853, Responds to NRC RAI Transmitted Via ,Requesting That Util Confirm That Use at Eol Will Be Greater than 50 ft-lbs,per Responses to GL 92-01,Rev 1, Rv Structural Integrity + (16:11:17, 16 December 2024)
- ML20069B695 + (16:11:17, 16 December 2024)
- 05000354/LER-1994-006-02, :on 940426,actuation of Nuclear Steam Supply Shutoff System (NS4) Occurred Due to Equipment Failure. Corrective Action:Failed Heater Was Replaced & Engineering Is Currently Reviewing Fault Protection Scheme + (16:11:19, 16 December 2024)
- PY-CEI-NRR-0024, Requests That Intermittent Containment Purge Be Permitted Up to Limit of 4,750 H Per Yr.Results of re-evaluation of Requirements for Intermittent Containment Purge Supporting Resolution of SER Outstanding Issue 10 Encl + (16:11:20, 16 December 2024)
- ML20069B665 + (16:11:21, 16 December 2024)
- ML20069B668 + (16:11:21, 16 December 2024)
- ML20069B663 + (16:11:22, 16 December 2024)