Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070A193 + (15:10:04, 16 December 2024)
- ML20070A185 + (15:10:05, 16 December 2024)
- 05000416/LER-1982-110, Forwards LER 82-110/03L-0 + (15:10:06, 16 December 2024)
- ML20070A178 + (15:10:06, 16 December 2024)
- ML20070A169 + (15:10:07, 16 December 2024)
- ML20070A172 + (15:10:07, 16 December 2024)
- ML20070A164 + (15:10:08, 16 December 2024)
- ML20070A167 + (15:10:08, 16 December 2024)
- HL-4624, Forwards Rev 3 to Ei Hatch Nuclear Plant IST Program + (15:10:09, 16 December 2024)
- ML20070A149 + (15:10:10, 16 December 2024)
- ML20070A159 + (15:10:10, 16 December 2024)
- ML20070A144 + (15:10:13, 16 December 2024)
- ML20070A140 + (15:10:15, 16 December 2024)
- ML20070A132 + (15:10:17, 16 December 2024)
- 05000328/LER-1982-129-03, /03L-0:on 821103,letdown Orifice Containment Isolation Valve 2-FCV-62-73 Failed Shut.Caused by Control Fuses Failing Due to Shorted Coil in Relay 8149AX.Coil & Fuses Replaced.Valve Tested & Returned to Svc on 821104 + (15:10:18, 16 December 2024)
- ML20070A116 + (15:10:19, 16 December 2024)
- 05000328/LER-1982-129, Forwards LER 82-129/03L-0 + (15:10:20, 16 December 2024)
- ML20070A112 + (15:10:20, 16 December 2024)
- 05000325/LER-1982-120-03, /03L-0:on 821030,turbine Control Valve Fast Closure Control Oil Pressure Low Switch EHC-PSL-1759 Failed to Actuate.Cause Could Not Be Determined.Switch Exercised to Ensure Proper Operation + (15:10:22, 16 December 2024)
- ML20070A106 + (15:10:23, 16 December 2024)
- ML20070A105 + (15:10:23, 16 December 2024)
- ML20070A098 + (15:10:24, 16 December 2024)
- ML20070A100 + (15:10:24, 16 December 2024)
- ML20070A095 + (15:10:25, 16 December 2024)
- ML20070A094 + (15:10:25, 16 December 2024)
- ML20070A093 + (15:10:26, 16 December 2024)
- 05000325/LER-1982-120, Forwards LER 82-120/03L-0 + (15:10:27, 16 December 2024)
- ML20070A081 + (15:10:27, 16 December 2024)
- 1CAN069401, Forwards Application for Amend to License DPR-51,revising Limiting Condition for Operation,Surveillance Requirements & Bases for Emergency Feedwater Sys + (15:10:28, 16 December 2024)
- 05000416/LER-1982-112-03, /03L-0:on 821105,smoke Detector in East Switchgear & Piping Penetration Rooms of Auxiliary Bldg,Elevation 119 Ft,Alarmed & Would Not Reset.Caused by Dust in Detector. Detector Cleaned & Returned to Svc on 821108 + (15:10:29, 16 December 2024)
- ML20070A072 + (15:10:30, 16 December 2024)
- 05000416/LER-1982-112, Forwards LER 82-112/03L-0 + (15:10:31, 16 December 2024)
- RBG-40677, Updates 911223 Response to GL 88-20,Suppl 4,informing That as Discussed Recently W/Nrc,Submittal Date for IPEEE for Plant Revised from 940724 to 1231.Reason for Extension Listed + (15:10:31, 16 December 2024)
- ML20070A060 + (15:10:32, 16 December 2024)
- RBG-40675, Responds to NRC Re Violations Noted in Insp Rept 50-458/94-08.Corrective Action:Individuals Were Counseled on Procedural & Adminstered Disciplinary Action + (15:10:33, 16 December 2024)
- ML20070A057 + (15:10:33, 16 December 2024)
- 05000416/LER-1982-118-03, /03L-0:on 821104,smoke Detectors in Piping Penetration,Rhr C Pump & LPCS Rooms of Auxiliary Bldg Annunciated W/O Presence of Smoke or Fumes.Caused by Accumulation of Dust on Detectors + (15:10:35, 16 December 2024)
- 3F0694-15, Provides Info Requested in Suppl 6 to GL 89-10,re Program Status,Schedular Extension & Response to NRC + (15:10:37, 16 December 2024)
- ML20070A051 + (15:10:37, 16 December 2024)
- ML20070A042 + (15:10:38, 16 December 2024)
- ML20070A039 + (15:10:40, 16 December 2024)
- ML20070A036 + (15:10:41, 16 December 2024)
- ML20070A037 + (15:10:41, 16 December 2024)
- ML20070A033 + (15:10:49, 16 December 2024)
- 05000325/LER-1982-132-03, /03L-0:on 821105,routine Surveillance Revealed Lack of Position Indication for PCIV 1-B32-F042B Located at RIP-X-243A.Caused by Blown Valve Operator Solenoid Power Supply Fuse.Fuse Replaced + (15:10:51, 16 December 2024)
- ML20070A028 + (15:10:52, 16 December 2024)
- 05000416/LER-1982-118, Forwards LER 82-118/03L-0 + (15:10:53, 16 December 2024)
- ML20070A014 + (15:10:58, 16 December 2024)
- ML20070A012 + (15:10:59, 16 December 2024)
- 05000325/LER-1982-132, Forwards LER 82-132/03L-0 + (15:11:00, 16 December 2024)
- ML20070A010 + (15:11:00, 16 December 2024)
- 05000321/LER-1982-097-01, /01T-0:on 821116,spent Fuel Rod Broken During Visual Insp of Several Spent Fuel Bundles.Caused by Severely Degraded Cladding at Point of Separation Due to Corrosion. Rod Will Be Placed Back Into Bundle & Bundle Flagged + (15:11:02, 16 December 2024)