ML20070A042
| ML20070A042 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/07/1991 |
| From: | Reynolds N WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN |
| To: | Bloch P, Bright G, Schink D Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX |
| References | |
| CON-#191-11289 OL, NUDOCS 9101170073 | |
| Download: ML20070A042 (1) | |
Text
-.
//ZEY WTNSTON & STIMW.&
hHr.C anenta.cs.s
. ns'on tiesa inne, 1400 L STREET. N W Cxce 0"<E -
uAs n ca449 owi tw4e' WAS%G'ON QC, 20005 350291 JAN 10 P3 :44 PIfo710.1',
d'a sse seco (202) 371 5700 IY
,I'"'*
NEW OxOMC8
^ a 's a s 0+:c v c-a t %u e,n rAC$ett (202) an 59go
.[ q M,: m >. 1 s M w aa carrr
..;s,s n t.4 Nea e x,n ica. w.
January 7, 1991 Peter B.
Bloch, Esquire David R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M University U.S. Nuclear Regulatory College Station, Texas 77843 Commission Washington, D.C.
20555 Mr. Glenn O.
Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Subj:
Washington Public : Power Supply System (WPPSS. Nuclear Project No. 1) Docket No. 50-460-OL Gentlemen:
In accordance with the October 14, 1983, Memorandum and Order in the captioned proceeding, the Washington.Public Power Supply System hereby submits its twenty-ninth quarterly status report regarding construction ~ activities at WNP-1.
During the fourth quarter of 1990, no significant-safety-related. construction activities were. performed at WNP-1,-
although a limited-engineering effort was continuing.-
We do not anticipate any change in this level of activity during the next several months..
Since ly,
/
6 l
Nicholds 3.
olds Counsel or pp icant cc:
Service List p"ma 8%o yo
.-