ML20070A042

From kanterella
Jump to navigation Jump to search
Submits 29th Quarterly Status Rept Re Facility Const Activities.No Significant safety-related Const Activities Performed at Plant,Although Limited Engineering Effort Continuing
ML20070A042
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/07/1991
From: Reynolds N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN
To: Bloch P, Bright G, Schink D
Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX
References
CON-#191-11289 OL, NUDOCS 9101170073
Download: ML20070A042 (1)


Text

-.

//ZEY WTNSTON & STIMW.&

hHr.C anenta.cs.s

. ns'on tiesa inne, 1400 L STREET. N W Cxce 0"<E -

uAs n ca449 owi tw4e' WAS%G'ON QC, 20005 350291 JAN 10 P3 :44 PIfo710.1',

d'a sse seco (202) 371 5700 IY

,I'"'*

NEW OxOMC8

^ a 's a s 0+:c v c-a t %u e,n rAC$ett (202) an 59go

.[ q M,: m >. 1 s M w aa carrr

..;s,s n t.4 Nea e x,n ica. w.

January 7, 1991 Peter B.

Bloch, Esquire David R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M University U.S. Nuclear Regulatory College Station, Texas 77843 Commission Washington, D.C.

20555 Mr. Glenn O.

Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Subj:

Washington Public : Power Supply System (WPPSS. Nuclear Project No. 1) Docket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1983, Memorandum and Order in the captioned proceeding, the Washington.Public Power Supply System hereby submits its twenty-ninth quarterly status report regarding construction ~ activities at WNP-1.

During the fourth quarter of 1990, no significant-safety-related. construction activities were. performed at WNP-1,-

although a limited-engineering effort was continuing.-

We do not anticipate any change in this level of activity during the next several months..

Since ly,

/

6 l

Nicholds 3.

olds Counsel or pp icant cc:

Service List p"ma 8%o yo

.-