Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070E109 + (14:50:41, 16 December 2024)
- HL-4636, Provides plant-specific Applicability Forms from App B of NEDO-32205,Rev 1 for Units 1 & 2,per GL 92-01, Reactor Vessel Structural Integrity + (14:50:42, 16 December 2024)
- ML20070E105 + (14:50:42, 16 December 2024)
- ML20070E095 + (14:50:43, 16 December 2024)
- ML20070E091 + (14:50:44, 16 December 2024)
- ML20070E086 + (14:50:46, 16 December 2024)
- ML20070E088 + (14:50:46, 16 December 2024)
- ML20070E085 + (14:50:47, 16 December 2024)
- U-602306, Responds to NRC Re Violations Noted in Insp Rept 50-461/94-06.Corrective Actions:Replaced Both Gauges That Were Found to Be Indicating higher-than-actual Pressure & Reset Pressure Regulator + (14:50:48, 16 December 2024)
- ML20070E072 + (14:50:48, 16 December 2024)
- ML20070E070 + (14:50:49, 16 December 2024)
- ML20070E071 + (14:50:49, 16 December 2024)
- ML20070E066 + (14:50:50, 16 December 2024)
- 1CAN079401, Confirms plant-specific Applicability of TRs BAW-2178P & BAW-2192P,as Well as BAW-2222 to ANO Unit 1,in Response to Request for Verification of Info Re GL 92-01,Rev 1, Reactor Vessel Structural Integrity + (14:50:51, 16 December 2024)
- ML20070E062 + (14:50:51, 16 December 2024)
- NG-94-0669, Application for Amend to License DPR-49,authorizing Addition to Control Bldg Chiller Operability & Surveillance Requirements + (14:50:52, 16 December 2024)
- SVP-94-034, Forwards Response to NRC 940520 Request for Addl Info Re Stuck Rod at Braidwood Station Unit 2 + (14:50:52, 16 December 2024)
- ML20070E048 + (14:50:53, 16 December 2024)
- ML20070E043 + (14:50:54, 16 December 2024)
- ML20070E041 + (14:50:55, 16 December 2024)
- ML20070E040 + (14:50:55, 16 December 2024)
- NG-94-1595, Application for Amend to License DPR-49,clarifying Requirement for Audit of Conformance to Tss,Deleting Requirement for Safety Committee Oversight of Audits & Allowing Designation of Signature Authority + (14:50:57, 16 December 2024)
- ML20070E037 + (14:50:57, 16 December 2024)
- ML20070E025 + (14:50:58, 16 December 2024)
- NG-94-2451, Application for Amend to License DPR-49,modifying Surveillance Testing of ESW Sys by Deleting Flow Rate Test & Requirement to Test Pumps Each Week When River Water Temp Exceeds 80 F + (14:50:58, 16 December 2024)
- 05000331/LER-1994-009, :on 940609,hi Flow Alarm Was Received on Control Room Panel 1C03 Due to Failed Differential Pdt. Replaced Pdt W/Model That Is Not Conducive to Entrapment of Water in Its Housing & Procedure Revised + (14:51:03, 16 December 2024)
- ML20070E015 + (14:51:04, 16 December 2024)
- HL-4627, Informs NRC That Licensee Considers Eop/Fsar Conflicts Closed & Plans No Further Action + (14:51:05, 16 December 2024)
- 05000413/LER-1994-007, :on 940608,operations Discovered Past Due Rept Surveillance Interval Exceeded for TS Surveillance 4.7.6.b for Train A.Caused by Inadequate Verbal Communication.Lead Personnel Instructed to Closely Monitor Test + (14:51:06, 16 December 2024)
- ML20070E006 + (14:51:08, 16 December 2024)
- 05000263/LER-1994-005, :on 940608,safety/relief Valve Was Found to Be Disconnected from Valve Operator.Causes Unknown.New Fitting Was Installed on Safety Relief Valve + (14:51:10, 16 December 2024)
- ML20070E002 + (14:51:12, 16 December 2024)
- ML20070D998 + (14:51:13, 16 December 2024)
- 0CAN109004, Discusses 900431 Meeting for Insp of Fire Protection Program & Questions Raised Re Adequacy of 12-volt Dc Emergency Light Sys to Illuminate Access/Egress Paths to Equipment Required for Alternate Shutdown + (14:51:14, 16 December 2024)
- ML20070D992 + (14:51:14, 16 December 2024)
- ML20070D988 + (14:51:15, 16 December 2024)
- ML20070D982 + (14:51:16, 16 December 2024)
- ML20070D981 + (14:51:17, 16 December 2024)
- ML20070D976 + (14:51:18, 16 December 2024)
- ML20070D975 + (14:51:19, 16 December 2024)
- RC-94-0175, Monthly Operating Rept for June 1994 for VC Summer Nuclear Station + (14:51:20, 16 December 2024)
- ML20070D974 + (14:51:20, 16 December 2024)
- ML20070D960 + (14:51:21, 16 December 2024)
- ML20070D959 + (14:51:21, 16 December 2024)
- ML20070D954 + (14:51:22, 16 December 2024)
- ML20070D949 + (14:51:22, 16 December 2024)
- ML20070D947 + (14:51:23, 16 December 2024)
- ML20070D940 + (14:51:24, 16 December 2024)
- ML20070D938 + (14:51:25, 16 December 2024)
- ML20070D933 + (14:51:25, 16 December 2024)
- 05000458/LER-1994-015, :on 940606,fuse Blew While Test Equipment Manual Initiation Was Being Installed.Caused by Failure of Soldered Joint in Amphenol Connector.Blown Fuse Was Replaced & Faulty Connector Repaired + (14:51:27, 16 December 2024)