Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070S088 + (14:10:29, 16 December 2024)
- ML20070S085 + (14:10:30, 16 December 2024)
- ML20070S083 + (14:10:31, 16 December 2024)
- ML20070S072 + (14:10:31, 16 December 2024)
- ML20070S058 + (14:10:32, 16 December 2024)
- ML20070S066 + (14:10:32, 16 December 2024)
- BECO-91-042, Submits Initial Response to NRC Safety Evaluation of Util Response to Station Blackout Rule Dtd 910213.Station blackout-related Mods Scheduled for Refueling Outage 8 Include Shutdown Bus Energization + (14:10:33, 16 December 2024)
- ML20070S047 + (14:10:34, 16 December 2024)
- ML20070S046 + (14:10:34, 16 December 2024)
- ML20070S034 + (14:10:35, 16 December 2024)
- 05000316/LER-1982-118-03, /03L-0:on 821229,lower Containment Airborne Monitor ERS-2400 High Alarm Setpoint for Channel 2401 Left at Higher than Allowable Value During Functional Testing. Caused by Nonconservative Condition,Increasing Reading + (14:10:36, 16 December 2024)
- ML20070S012 + (14:10:37, 16 December 2024)
- 05000316/LER-1982-118, Forwards LER 82-118/03L-0 + (14:10:38, 16 December 2024)
- 05000254/LER-1983-003-03, /03L-0:on 830118,during Reactor Water Level Calibr Procedure Qis 10-1,switch LIS-1-263-58A Tripped Below Tech Specs.Caused by Instrument Setpoint Drift.Level Switch Recalibr + (14:10:39, 16 December 2024)
- 05000373/LER-1982-177-03, /03L-0:on 821230,RHR Full Flow Test Valve a 1E12-F024A Did Not Close Fully When Sys Was Being Shut Down. Caused by Unadjusted Light Switch Cam on Throttlable Valve. Closing Torque Switch Replaced + (14:10:41, 16 December 2024)
- ML20070R998 + (14:10:42, 16 December 2024)
- 05000373/LER-1982-177, Forwards LER 82-177/03L-0 + (14:10:43, 16 December 2024)
- LD-94-036, Forwards Comments of Chapter 4 of Sys 80+ Final SER, NUREG-1462 for Technical Accuracy & Consistency w/CESSAR-DC + (14:10:43, 16 December 2024)
- 05000254/LER-1983-003, Forwards LER 83-003/03L-0 + (14:10:44, 16 December 2024)
- ML20070R985 + (14:10:45, 16 December 2024)
- ML20070R986 + (14:10:45, 16 December 2024)
- ML20070R978 + (14:10:46, 16 December 2024)
- ML20070R982 + (14:10:46, 16 December 2024)
- 05000255/LER-1983-001-01, /01T-0:on 830112,while Raising Boron Concentration in T-82B (B Safety Injection Tank),Tank Became Inoperable Due to Low Tank Level.Caused by High Tank Level & Leakage from Loop Check Valve + (14:10:48, 16 December 2024)
- 05000255/LER-1983-001, Forwards LER 83-001/01T-0 + (14:10:49, 16 December 2024)
- ML20070R965 + (14:10:49, 16 December 2024)
- ML20070R962 + (14:10:50, 16 December 2024)
- ML20070R964 + (14:10:50, 16 December 2024)
- 0CAN039109, Submits Addl Info in Response to Violations Noted in Insp Repts 50-313/89-39 & 50-368/89-39.Corrective Actions: Inventory of Entire Subj Vendor Documentation Files & Index of Vendor Documentation Completed + (14:10:51, 16 December 2024)
- ML20070R948 + (14:10:52, 16 December 2024)
- RBG-34-666, Forwards Marsh & Mclennan to NRC Summarizing Present Level of Nuclear Property Insurance Coverage for Facility + (14:10:52, 16 December 2024)
- 05000315/LER-1983-003-03, /03L-0:on 830103,fire Door 385 Would Not Latch Upon Closing Due to Bent Door Knob Spindle.Cause Undetermined.Knob Spindle Replaced & Door Closer Adjusted + (14:10:54, 16 December 2024)
- ML20070R942 + (14:10:55, 16 December 2024)
- RBG-34-663, Advises That Util Selected Second Certified Lab to Perform Tests on Util Random,Followup,Reason to Believe Urine Specimens & Blood Bac Samples.Action Prompted by Unsatisfactory Performance Test Results + (14:10:55, 16 December 2024)
- 05000315/LER-1983-003, Forwards LER 83-003/03L-0 + (14:10:56, 16 December 2024)
- ML20070R935 + (14:10:57, 16 December 2024)
- ML20070R933 + (14:10:58, 16 December 2024)
- ML20070R934 + (14:10:58, 16 December 2024)
- ML20070R931 + (14:10:59, 16 December 2024)
- BSEP-94-0181, Forwards Typed TS Pages Re Relocation of Instrument Response Time Tables to Ufsar,Per GL 93-08 as Stated in 940414 Application for Amends to Licenses DPR-62 & DPR-71 + (14:10:59, 16 December 2024)
- ML20070R928 + (14:11:00, 16 December 2024)
- ML20070R926 + (14:11:01, 16 December 2024)
- BSEP-94-0179, Provides Info Requested in Re Rev 1 to Generic Ltr 92-01, Reactor Vessel Structural Integrity, 10CFR50.54(f) + (14:11:02, 16 December 2024)
- ML20070R919 + (14:11:02, 16 December 2024)
- ML20070R918 + (14:11:04, 16 December 2024)
- 05000315/LER-1982-108-03, /03L-0:on 821227,security Officer on Tour Found Carbon Dioxide Switch for 4-KV Switchgear Room in Isolate Position W/No Personnel in Room.Caused by Misunderstanding of Responsibility for Requesting Security Guard + (14:11:05, 16 December 2024)
- BSEP-91-0120, Responds to Violations Noted in Insp Repts 50-324/90-48 & 50-325/90-48.Corrective actions:NDEP-425, Ultrasonic Exam Procedure for Piping Sys Revised to Strengthen Calibr Techniques & Indication Recording Levels + (14:11:06, 16 December 2024)
- ML20070R908 + (14:11:07, 16 December 2024)
- 05000315/LER-1982-108, Forwards LER 82-108/03L-0 + (14:11:08, 16 December 2024)
- 05000461/LER-1994-003, :on 940415,reactor Thermal Power Level Exceeded 100 Percent of Rate Thermal Power Due to Unexpected Reactor Recirculation System Flow Control Transient.Corrective Action:Replaced Solenoid & Controller Module + (14:11:09, 16 December 2024)
- ML20070R896 + (14:11:10, 16 December 2024)
- 05000271/LER-1991-004, :on 910228,incomplete Surveillance Testing of Reactor Protective Sys Logic Instrument Channels Noted.Due to Inadequate Procedure.Procedure Writers Guide Revised & Surveillance Tests Reviewed + (14:11:12, 16 December 2024)