Responds to Request for Addl Info Re 940428 Response to Violation Noted in Insp Repts 50-424/94-04 & 50-425/94-04 on 940228-0304.Rev to Procedure 26866-C Will Be Completed by 940701
ML20070R948
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/17/1994
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, LCV-0136-E, LCV-136-E, NUDOCS 9405230148
Download: ML20070R948 (2)


Text

.

~ - -..,

l I

Georgia Power Company 40 lnverness Center Parkway l

I f

Post Off ce Box 1205 i

j Birmengham Alabama 35201 Telephone 20s 877 7ygg b

C. K. McCoy Georgia Power Vce Presdent, Nuclear Vogtle Prosect ite southern electic system May 17, 1994 l

LCV-0136-E i

Docket Nos. 50-424 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING REPLY TO A NOTICE OF VIOLATION Pursuant to 10 CFR 2.201, Vogtle Electric Generating Plant (VEGP) submitted letter LCV-0136D, dated April 28,1994, in response to a violation identified in Inspection Reports 50-424,425/94-04 which concerned the inspection conducted on February 28, 1994, through March 4,1994.

In this response one of the corrective steps stated by Georgia Power Company (GPC) to be taken to avoid further violations was that procedure 26866-C would be revised prior to l

any additional differential pressure (D/P) testing of the remaining GL 89-10 Program i

motor operated valves (MOVs). This procedure revision will incorporate additional acceptance criteria which must be satisfied prior to returning the MOV to service and include an abbreviated methodology for initial evaluation to require extrapolation of the actual test data to design basis conditions. The procedure revision will be completed by July 1,1994.

Should you have any more questions in regards to this subject, please contact this office.

Sincerely, C. K. McCoy CKM/AFS nn.

9405230148 940517 PDR ADOCK 05000424 I d Q

PDR l-

t

'icorgia Power d i

U. S. Nuclear Regulatory Commission Page 2 of 2 xc:

Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle LCV-0136E e