Text
.--
4*
i9
$ENTERCOR
\\
ENERGY PERRY NUCLEAR POWER PLANT Mail Mdress:
Robert A.Stratman PO BOX 97 VICE PRESIDENT NUCLEAR
. 10 CENTER ROAD PERRY, OHIO 44081 (216) 2594737 May 13, 1994 i
PY-CEI/0 EPA-0201L i
j Ohio EPA Division of Vater Pollution Control 4
i Enforcement Section, ES/MOR 1800 Vatermark Drive Columbus, Ohio 43266-0149 l
Gentlemen, Enclosed are the NPDES monthly report forms for the month of April, 1994.
~
Also enclosed is a revised March form for outfall 3IB00016004. The flow rate reported on the original March form did not include fire service water.
Fire service water had been rerouted on March 9 to support piping repairs. The current fire service water flow path bypasses the outfall flow meter. This flov is not metered, yet it still exits the plant at this outfall. Flov has been maintained at 3.3 HGD. This flow has been added to the existing flow on the revised form and vill be added for the duration of the piping repairs.
All sampling and analysis requirements were met during March.
l 4
If you have questions or require additional information, please contact Donna Tizzano at (216) 280-5514.
Very truly yours, jfSt h Ot%
I 4
)
J RAS:DGT:sc Enclosures cc NRC Project Manager i
NRC Resident Inspector Office IfC Document Control Desk NRC Region III 230002 Cleveland Electric tiluminating 9405230153 94ogi h" 3 Operating Companies Toledo Edison DR ADOCK 05000 40 PDR
-