Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072T182 + (09:18:28, 15 December 2024)
- 05000277/LER-1994-006-02, :on 940804,no Firewatches Were in Areas During 50 Minute Period When Carbon Dioxide Fire Suppression Sys Was Inoperable.Caused by Inadequate Communication.Involved Individual Has Been Counselled + (09:18:29, 15 December 2024)
- ML20072T165 + (09:18:30, 15 December 2024)
- ML20072T153 + (09:18:31, 15 December 2024)
- ML20072T158 + (09:18:31, 15 December 2024)
- ML20072T145 + (09:18:32, 15 December 2024)
- ML20072T142 + (09:18:32, 15 December 2024)
- ML20072T139 + (09:18:33, 15 December 2024)
- ML20072T137 + (09:18:37, 15 December 2024)
- ML20072T135 + (09:18:37, 15 December 2024)
- ML20072T134 + (09:18:38, 15 December 2024)
- ML20072T122 + (09:18:42, 15 December 2024)
- ML20072T116 + (09:18:43, 15 December 2024)
- ML20072T111 + (09:18:44, 15 December 2024)
- ML20072T107 + (09:18:44, 15 December 2024)
- ML20072T100 + (09:18:45, 15 December 2024)
- ML20072T101 + (09:18:45, 15 December 2024)
- ML20072T098 + (09:18:46, 15 December 2024)
- 3F0994-04, Monthly Operating Rept for Aug 1994 for Crystal River Unit 3 + (09:18:47, 15 December 2024)
- ML20072T095 + (09:18:47, 15 December 2024)
- ML20072T088 + (09:18:48, 15 December 2024)
- ML20072T089 + (09:18:48, 15 December 2024)
- GO2-83-253, Interim Deficiency Rept Re Loss of ESF Loads on Under Voltage Trip.Initially Reported on 830228.Project Engineering Directive 218-E-4618 Issued to Implement Corrective Action.Next Rept Expected by 830624 + (09:18:49, 15 December 2024)
- ML20072T081 + (09:18:50, 15 December 2024)
- 05000328/LER-1991-003-03, :on 910301,discovered That Breaker for Operator for Cold Leg Accumulator 3 Locked in Closed Position.Caused by Inappropriate Personnel Actions.Breaker Restored to Correct Position & Addl Training Provided + (09:18:52, 15 December 2024)
- ULNRC-03066, Special Rept:On 940809,discovered Two Invalid a Failures During Troubleshooting Due to Air Start Solenoid Failures + (09:18:53, 15 December 2024)
- 0CAN049104, Submits Status of Corrective Actions Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Per Operational Safety Team Insp During Wk of 900910.Procedures Re Closing Fire Dampers Changed + (09:18:54, 15 December 2024)
- 2CAN049105, Discusses Steam Generator a Feedwater Nozzle Thermal Sleeve Degradation Discovered During Secondary Side Insp of Generator on 910326.Thermal Sleeve Will Be Replaced During Next Refueling Outage (Outage 2R9) + (09:18:54, 15 December 2024)
- 05000413/LER-1994-008, :on 940714,identified That Rn Valves 1RN-E13 & 1RN-E14 Were Properly Positioned But Not Properly Secured. Caused by Improper Work Practices.Properly Secured Valve 1RN-E14 & Verification of All Control Valves + (09:18:56, 15 December 2024)
- ML20072T058 + (09:18:57, 15 December 2024)
- BECO-91-047, Beco Annual Rept 1990, & Securities & Exchange Commission Form 10K + (09:18:59, 15 December 2024)
- ML20072T052 + (09:18:59, 15 December 2024)
- BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe + (09:19:00, 15 December 2024)
- ML20072T049 + (09:19:01, 15 December 2024)
- ML20072T045 + (09:19:01, 15 December 2024)
- 1CAN099401, LER 94-V01-00:on 940804,functional Test Procedure for Hydrogen Analyzer Was Not Adequate to Alert Plant Personnel.Caused by Personnel Oversight.Functional Test Procedure Has Been Revised + (09:19:03, 15 December 2024)
- ML20072T037 + (09:19:03, 15 December 2024)
- 05000298/LER-1994-017, :on 940809,engineering Evaluation May Not Have Been Responsive to Intent or Potential Ramifications of Condition Addressed by In.Caused by Failure of REC Ci Valve.Evaluation of re-assessment Is ongoing.W/940908 + (09:19:08, 15 December 2024)
- ML20072T017 + (09:19:09, 15 December 2024)
- 05000324/LER-1983-030-03, /03L-0:on 830314,both Recirculation Pumps Tripped. Caused by Slight Disturbance in Common Ref Leg.Trip Signal Reset + (09:19:11, 15 December 2024)
- 05000324/LER-1983-030, Forwards LER 83-030/03L-0 + (09:19:12, 15 December 2024)
- ML20072T008 + (09:19:13, 15 December 2024)
- 05000327/LER-1983-035-03, /03L-0:on 830304,feedwater Flow Channel Failed Low & Declared Inoperable.Caused by Permanent Compression Fitting Test Valve Blowing Off.Valve Properly Replaced + (09:19:14, 15 December 2024)
- ML20072S997 + (09:19:15, 15 December 2024)
- 05000327/LER-1983-035, Forwards LER 83-035/03L-0 + (09:19:16, 15 December 2024)
- ML20072S995 + (09:19:16, 15 December 2024)
- U-602337, Submits Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Bwrs + (09:19:17, 15 December 2024)
- ML20072S984 + (09:19:18, 15 December 2024)
- 0CAN049103, Revises 910121 Response to Violations Noted in Insp Repts 50-313/90-42 & 50-368/90-42.Corrective Actions:Procedure 1000.131, 10CFR50.59 Review Program Will Be Revised to Ensure Review Addresses Radiological Consequences + (09:19:19, 15 December 2024)
- BSEP-94-0320, Forwards Rev 18 to Industrial Security Plan,Including Title & Section Changes & Realignment of Functions & Responsibilities to Reflect Recent Reorganization within CP&L Nuclear Generation Group.Rev Withheld + (09:19:19, 15 December 2024)
- ML20072S964 + (09:19:20, 15 December 2024)
- ML20072S959 + (09:19:21, 15 December 2024)