Provides Written Documentation to follow-up Licensee Verbal Request,Dtd 940909,for Enforcement Discretion from Waterford 3 TS Surveillance Requirements 4.8.1.1.2.d Re EDG Integrated Tests
ML20072T142
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/09/1994
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0160, W3F1-94-160, NUDOCS 9409150088
Download: ML20072T142 (2)


Text

--

=~=- ENTERGY T'al?'"""" '""

Mona LA 70%G M EC4 739 6774 R. F. Burski mm.

I4 Ahlf Ed't*!/

Vi;1'Od Tj 3 W3F1-94-0160 A4.05 PR September 9, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Request for Enforcement Discretion Technical Specification _4.8.1.1.2.d Electrical Power Systems Supplemental Information Gentlemen:

This letter provides written documentation'to follow-up Entergy Operations, Inc. 's verbal request on September 9,1994, regarding a request for enforcement discretion from Waterford 3 Technical Specification (TS)

Surveillance Requirements 4.8.1.1.2.d Emergency Diesel Generator integrated tests. This letter also supplements our written request W3F1-94-0159 dated September 9, 1994.

In our initial request we requested enforcement discretion to allow Waterford 3 to extend the Allowed Outage Time for TS Action Statement 3.8.1.1.b.

The purpose of this submittal is to change our initial request and request enforcement discretion on the surveillance requirements of TS 4.8.1.1.2.d to exclude AB bus. components for 7 days to allow approval of our proposed emergency technical specification change.

Upon approval of this amended request, Waterford 3 Emergency Diesel Generator B will be declared operable. The basis for this request as described in our initial submittal is not affected by this supplemental information. This amended request has been revieweo by the Plant Operations Review Committee and has been approved by the General' Manager -

Plant Operations.

zo\\

o 9409150088 940909 PDR ADOCK 05000382 l gQ P

PDR u

' r o o W )n dbd(

I

-s Request for Enforcement Discretion Technical Specification 4.8.1.1.2.d Electrical Power Systems Supplemental Information W3F1-94-0160 l

Page 2 l

September 9, 1994 i

l

\\

Should you have further questions concerning the attached information, please contact D.W. Vinci at (504) 739-6370.

l Very truly yours, g

1;

/

l R.F. Burski l

Director l

Nuclear Safety I

i RFB/PLC/ssf cc:

L.J. Callan, NRC Region IV J.W. Roe, NRC-NRR l

E.G. Adensam, NRC-NRR D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds Administrator Radiation Protection Division (State of Louisiana)

American Nuclear Insurers NRC Resident inspectors Office l

.