ML20072T089
| ML20072T089 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/31/1994 |
| From: | Bowling M, Stall J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 94-542, NUDOCS 9409150060 | |
| Download: ML20072T089 (12) | |
Text
'
VinoixrA I?i,ucrnrc Axn Powen COMI'ANY n icu >ioxu, Vinoin A count September 12, 1994
)
U. S. Nuclear Regulatory Commission Serial No.
94 542 Attention: Document Control Desk NL&P/GSS Washington, D.C. 20555 Docket Nos.
50-338 i
50-339 i
License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of August 1994.
i Very truly yours, k'
M. L. Bowling, Manager Nuclear Licensing and Programs Enclosure cc:
U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station
'n n(> g 94o915oo60 940831 DR ADOCK 0500 8
pl
i VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT l
MONTH:
Aucust YEAR:
1994 Approved:
I gp-stauon Manager
=
j r
l OPERATING DATA REPORT DOCKET NO..
50-338
(
DATE: September 2, 1994 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.
Un i t N ame :................................ N o r t h Anna 1 2.
Deporting Period:........................ August 1994 3.
Licensed Thermal Power (MWt):.............
2,893 4 Nameplate Rating (Gross MWe):.............
994 5.
Design Electrical Rating (Net MWe):.......
907 6.
Maximum Deperdable Capacity (Gross MWe):..
948 7.
Maximum Dependable Capacity (Net MWe):,...
900 8.
If changes occur in capacity Ratings (!tems No. 3 thru 7) since last report, give reasons:_N/A 9.
Power level to which restricted, if any (het MWe): __N/A
- 10. Reasons for restrictions, if any:
N/A This Month Y-t-D Cumulatit e f
- 11. Hours in Reporting 'reriod........................
744.0 5,831.0 141,947.0
- 12. NLstber of Hours Reac tor was Cri ti cal....................
744.0 5,(>31.0 106,236.7
- 13. Reactor Reserve Shutdown Hours...........................
0.0 0.0 6,826.8
- 14. Hours Generator 0n-Line...........................
744.0 5,831.0 103,271.9
- 15. Unit Reserve Shutoown Hours...........
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)..................... 1,451,209.9 15,812,43*.4 274,264,667.8
- 17. Gross Electrical Energy Generated (MWH)...
476,985.0 5,213,330.0 90,128,687.0
- 18. Net Electrical Energy Generated (MWH)....................
444,679.0 4,946,363.0 85,352,948.0 l
- 19. Unit Service Factor.....................................
100.0%
100.0%
72.8%
- 20. Unit Availability Factor...............
100.0'I 100.0%
72.8%
- 21. Unit Capacity Factor (using MDC Net)...................
66.4%
94.3%
67.3%
- 22. Unit Capacity Factor (using DER Net)................
65.9%
93.5%
66.3%
- 23. Forced Outage Rate.......
0.0%
0.0%
10.2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Refueling, 09/09/94, 48 days l
l l
l l
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Commercial Operation):
)
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION t
. ~..
m.
j 1
AVERAGE DAILY UNIT POWER LEVEL i
Docket No.:
50-338 Unit:
NA-1 Date:
September 2, 1994
Contact:
J. A.
Stall Phone:
(703) 894-2101 i
MONTH:
Aucust 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER '
LEVEL (MWe-Ne t)
LEVEL (MWe-Net) 1 680 17 588 2
677 18 586 3
666 19 584 4
645 20 582 5
649 21 581 6
651 22 574 7
648 23 565 8
646 24 563 9
644 25 560 10 629 26 557 11 616 27 552 12 615 28 510 I
l 13 612 29 511-l 14 610 30 509 15 610 31 507 l
16
, 602
+
l Instructions:
On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month.
Compute to the nearest j
whole megawatt.
l l
i I
l NORTH ANNA POWER STATION UNIT NO.:
1 f
MONTH:
August
SUMMARY
OF OPERATING EXPERIENCE l
Page 1 of 1 Listed below in chronological sequence is a
summary of operating l
experiences for this month which required load reductions or resulted in l
significant non-load related incidents.
l l
Date Time Data August 01, 1994 0000 Began month with unit at 76% power, 730 MWe in a
power coastdown for upcoming refueling outage.
j August 31, 1994 2400 Ended month with unit at 60.3% power, 550 MWe in a power coastdown for upcoming refueling l
outage.
l I
l l
l l
1 l
I i
I i
Page 1
of 1
i UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 a
Report Month August Unit Name:
NA-1 I
Year:
1994 Date: September 2, 1994
Contact:
J.
A.
Stall 4
2
- No entry this month.
4 1
4 i
a f
k 4
i 1
l l
1
UNIT SHUTDOWNS AND POWER ~ REDUCTIONS DOCKET NO.:
50-338
~
UNIT NAME:
NA-1 DATE: September 2, 1994 l
REPORT MONTH: August 1994 CONTACT:
J.
A.
Stall PHONE: (703) 894-2101 l
1 2
3 4
5 i
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 1
oNo entry this month.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
i H=Other (explain)
Exhibit H - Same Source y
.v-.
....-.2 v.
m
.m.
Q l
1 OPERATING DATA REPORT DOCKET No.:
50-339 DATE: September 2, 1994 CONTACT:
J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.
Uni t N ame:............................. N or t h Anna 2 2.
Reporting Period:....................... August 1994 3.
Licensed Thermal Power (MWt):.............
2893 4.
Nameplate Rating (Gross MWe):........
979 5.
Design Electrical Rating (Net MWe):.
907 6.
Maximum Dependable capacity (Gross MWe):..
935 1
7.
Maximum Dependable Capacity (Net MWe):....
887 l
8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: _N/A I
i 9.
Power level to which restricted, if any (Net MWe): _ N/A
- 10. Reasons for restrictions, if any:
N/A l
l l
This Month Y-t-D Cumulative i
I l
- 11. Hours in Reporting Period.............................
744.0 5,831.0 120,215.0
- 12. Number of Hours Reactor was Critical....................
744.0 5,630.9 100,004.5
- 13. Reactor Reserve Shutdown Hours.........
0.0 95.7 6,508.9 l
- 14. Hours Generator on-Line................................
744,0 5,589.3 98,906.7
- 15. Unit Reserve Shutdown Hours.........
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)
.. 2,151,923.3 15,931,372.0 268,157,029.7 j
- 17. Gross Electrical Energy Generated (MWH)...
693,395.0 5,149,100.0 87,744,576.0 l
- 18. Net Electrical Energy Generated (MWH).........
658,355.0 4,892,638.0 83,942,339.0
- 19. Unit Service Factor.......
100.0%
95.9%
82.3%
- 20. Unit Availability Factor.....................
100.0%
95.9%
82.3%
l
- 21. Unit capacity Factor (using MDC Net)....
99.8%
94.6%
77.5%
- 22. Unit Capacity Factor (using DER Net).....
97.6%
92.5%
77.0%
- 23. Forced Outage Rate...........
0.0%
4.1%
5.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_ Refueling, 03/11/95, 60 days l
l
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
I l
. =.-
L AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit:
NA-2 Dates September 2, 1994
Contact:
J.
A.
Stall Phone:
(703) 894-2101 J
MONTH:
Aucust 1994 l
i l
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL L (MWe-Net) 1 884 17 886 2
884 18 886 3
883 19 886 4
883 20 886 5
883 21 886 6
886 22 888 7
886 23 890 8
886 24 889-9 885 25 885 10 885 26 885 11 884 27 885 12 879 28 885 13 884 29 884 r
i 14 883 30 884 s
i 15 884 31 885 16 886
)
Instructions:
On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month.
Compute to the nearest l
whole megawatt.
l l
1 i
l
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
August l
SUMMARY
_OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in l
significant non-load related incidents.
Date Time Data l
August 01, 1994 0000 Began month with unit at 100% power, 925 MWe.
August 12, 1994 0858 Commenced unit ramp-down for TVFT.
i l
0943 Unit stable at 91.5% power, 865 MWe for TVFT.
1023 TVFT completed satisfactorily.
1032 Commenced unit ramp-up to 100% power.
1136 Unit stable at 100% power, 926 MWe.
August 31, 1994 2400 Ended month with unit at 100% power, 930 MWe.
l I
l I
i l
i l
(
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 i
i l
Report Month August Unit Name:
NA-2 1
Year:
1994 Date: September 2, 1994
Contact:
J.
A.
Stall
- No entry this month.
l l
r 1
l l
i
DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: September 2,'1994 REPORT MONTH: August 1994 CONTACT:
J.
A.
Stall PHONE: (703) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence UNIT SHUTDOWNS AND POWER REDUCTIONS
- No entry this month.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F-Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
.