Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073E222 + (08:55:41, 15 December 2024)
- ML20073E203 + (08:55:43, 15 December 2024)
- ML20073E219 + (08:55:43, 15 December 2024)
- ML20073E201 + (08:55:44, 15 December 2024)
- ML20073E195 + (08:55:46, 15 December 2024)
- ML20073E193 + (08:55:46, 15 December 2024)
- ML20073E188 + (08:55:47, 15 December 2024)
- ML20073E181 + (08:55:51, 15 December 2024)
- 05000370/LER-1991-001-06, :on 910311,failure to Comply W/Esf Actuation Sys Instrumentation Tech Spec.Caused by Inappropriate Action & Defective Procedure.Event Reviewed,Procedural Compliance Reemphasized & Station Mgt Notified of Event + (08:55:53, 15 December 2024)
- ML20073E172 + (08:55:54, 15 December 2024)
- ML20073E174 + (08:55:54, 15 December 2024)
- 05000336/LER-1983-009, Forwards LER 83-009/01T-0 + (08:55:55, 15 December 2024)
- ML20073E170 + (08:55:55, 15 December 2024)
- B10750, Interim Deficiency Rept SD-34 Re Interference & Possible Binding of Itt Grinnell Mechanical Snubbers Mfg Prior to Apr 1980.Initially Reported on 830304.Evaluation in Progress.Final Rept Will Be Submitted by 830701 + (08:55:56, 15 December 2024)
- ML20073E164 + (08:55:56, 15 December 2024)
- ML20073E163 + (08:55:58, 15 December 2024)
- 05000306/LER-1991-001-02, :on 910327,discovery That Particular Piping Insp Not Being Made in Accordance W/Asme Section Xi.Caused by Personnel Error.Procedure for ASME Section XI Revised & Work Request Written + (08:55:59, 15 December 2024)
- ML20073E155 + (08:56:00, 15 December 2024)
- ML20073E147 + (08:56:01, 15 December 2024)
- ML20073E143 + (08:56:02, 15 December 2024)
- ML20073E145 + (08:56:02, 15 December 2024)
- ML20073E130 + (08:56:03, 15 December 2024)
- ML20073E131 + (08:56:03, 15 December 2024)
- ML20073E129 + (08:56:04, 15 December 2024)
- ML20073E126 + (08:56:05, 15 December 2024)
- ML20073E120 + (08:56:06, 15 December 2024)
- ML20073E111 + (08:56:07, 15 December 2024)
- ML20073E107 + (08:56:07, 15 December 2024)
- ML20073E101 + (08:56:08, 15 December 2024)
- ML20073E104 + (08:56:08, 15 December 2024)
- ML20073E100 + (08:56:09, 15 December 2024)
- ML20073E089 + (08:56:10, 15 December 2024)
- ML20073E094 + (08:56:10, 15 December 2024)
- ML20073E087 + (08:56:11, 15 December 2024)
- ML20073E088 + (08:56:11, 15 December 2024)
- ML20073E083 + (08:56:12, 15 December 2024)
- 05000361/LER-1983-025-03, /03L-0:telephone Rept Made Re Failure of Reactor Trip Circuit Breakers to Trip on Undervoltage.Caused by Inadequacies in Certain Maint Activities.Return to Power Rept Scheduled for Submittal by Apr 1983 + (08:56:14, 15 December 2024)
- ML20073E072 + (08:56:14, 15 December 2024)
- 05000361/LER-1983-025, Forwards LER 83-025/03L-0.Detailed Event Analysis Submitted + (08:56:16, 15 December 2024)
- ML20073E068 + (08:56:16, 15 December 2024)
- BSEP-91-0177, Special Rept 1-SR-91-001:on 910326,limiting Conditions for Operation Initiated Due to Inoperable Fire Doors.Caused by Routine Usage.Fire Doors 207,107 & 214 Repaired & Restored on 910402.Station Fire Watches Were Maintained + (08:56:17, 15 December 2024)
- LIC-94-0186, Forwards Fort Calhoun Station Performance Indicators + (08:56:18, 15 December 2024)
- ML20073E051 + (08:56:18, 15 December 2024)
- 05000361/LER-1983-031-01, /01T-0:on 830323,potential Safety Concern Identified,Involving Calibr Shift of 2AO-V31 Modules Associated W/Core Protection Calculators.Caused by Problems W/Amplifier.Design Change Initiated to Replace Modules + (08:56:20, 15 December 2024)
- ML20073E037 + (08:56:21, 15 December 2024)
- 05000361/LER-1983-028-01, /01T-0:on 830323,potential Safety Concern Identified,Involving Calibr Shift of Foxboro 2AO-V31 Modules Associated W/Core Protection Calculators.Caused by Problems W/Amplifier.Design Change Approved to Replace Modules + (08:56:22, 15 December 2024)
- 05000373/LER-1991-002-08, :on 910326,Div 1,Group 4 Primary Containment Isolation Occurred,Causing Reactor Bldg Ventilation Inboard Dampers to Close.Caused by Loosening Electrical Connection. Temporary Sys Change Procedure Revised + (08:56:24, 15 December 2024)
- NPL-94-0354, Provides Listed Info in Response to RAI Re Anchorage Design for Pbnp DG Addition Project + (08:56:25, 15 December 2024)
- ML20073E012 + (08:56:26, 15 December 2024)
- NLS9100264, Forwards Scope & Objectives for 1991 Emergency Preparedness Exercise Scheduled for 910724-25 + (08:56:26, 15 December 2024)
- HL-1586, Responds to NRC Re Violations Noted in Insp Repts 50-321/91-04 & 50-366/91-04.Corrective Actions:Design Change Request 2H91-023 Implemented to Raise Condensate Storage Tank Level Switch Setpoints Approx 22 1/2 Inches + (08:56:27, 15 December 2024)
- ML20073E005 + (08:56:28, 15 December 2024)