Forwards Test Schedule for Purge & Vent Valves.Purge & Vent Valve Operability Qualification Info Will Be Submitted by 830701
ML20073E072
Person / Time
Site: Limerick  
Issue date: 04/12/1983
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8304140329
Download: ML20073E072 (3)


Text

s i

PHILADELPHIA ELECTRIC COMPANY 2301 M A RK ET STR EET P.O. BOX 8699 OOI PHILADELPHI A. PA.19101 r2:53 84i.4so2 so m s.< r m.m vin n.m m April 12, 1983 Docket Nos. 50-352 50-353 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Request for Additional Information Regarding Operability Qualification of Purge and Vent Valves

References:

1) Letter, A Schwencer to E. G. Bauer, Jr.,

dated July 30, 1982

2) Letter, J. L. Kemper to A. Schwencer, dated January 3, 1983

Dear Mr. Schwencer:

In the Reference 2) letter we provided our schedules regarding SQRT and PVORT; and as discussed in our meetings on March 4, 1983, with hTC personnel involved in equipment qualification, our current schedule indicates that NRC SQRT and PVORT reviews can be supported during October 1983.

It is expected that at that time 85 to 90% of the equipment to be reviewed will be installed and qualified.

Regarding Purge and Vent Valve Operability Qualification information addressed by Attachments 4 and 5 of Reference 1, the requested information will be submitted to you by July 1, 1983.

The Limerick Purge and Vent Valve Operability Program was also described and discussed at the above mentioned March 4, 1983, meeting. The remaining test items for completing the program are outlined on the attachment.

Should any additional information be required, please do not hesitate to contact us.

Very truly yours, IkM[

8304140329 830412 POR ADOCK 05000352 A

PDR Attachment i

Copy to: See attached service list.

cc: Judge Lawrence Brenner Judge Richard F. Cole Judge Peter A. Morris Troy B. Conner, Jr., Esq.

Ann P. Hodgdon Mr. Frank R. Romano Mr. Robert L. Anthony Mr. Marvin I. Lewis Judith A. Dorsey, Esq.

Charles W. Elliott, Esq.

Mr. Alan J. Nogee Robe r t W. Adle r, Es q.

Mr. Thomas Gerusky Director, Pennsylvania Emergency Management Ager.cy Mr. Steven P. Hershey James M. Neill, Esq.

Donald S. Bronstein, Esq.

Mr. Joseph 11. White, III Walter W. Cohen, Esq.

Robert J. Sugarman, Esq.

Rodney D. Johnson Atomic Safety and Licensing Appeal Board Atomic Safety and Licensing Board Panel Docket and Service Section

)

-_O

e Test Schedule for Limerick Generating Station Purge & Vent Valves Vendor:

Clow Corp.

Model Type 6" & 24" Lugged Wafer Stop Valves Actuator Types - Bettis Air Actuator & Limitorque Motor Operator Test Fac ility :

NTS, Saugus, California Activity Sched. Date 1.

Dynamic Testing; Air Operators (6" & 24")

3-14 thru 4-7-83 2.

Static Load Test; Air Operated Actuator &

4-12 thru Va lve (6" & 24")

4-18-83 3.

Static Load Test; Motor Operated Actuator 3-28 thru

& Valve (6" 6 24")

4-1-83 i