Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076C373 + (08:01:00, 15 December 2024)
- ML20076C369 + (08:01:01, 15 December 2024)
- 05000458/LER-1991-002, :on 910216,ESF Actuation Occurred When Reactor Water Sample Containment Isolation Valve.Caused by Failure of Fuse Pressure High.Replacing Fuse & Reopening Reactor Water Sample Valve + (08:01:02, 15 December 2024)
- ML20076C365 + (08:01:03, 15 December 2024)
- ML20076C364 + (08:01:04, 15 December 2024)
- ML20076C351 + (08:01:05, 15 December 2024)
- ML20076C354 + (08:01:05, 15 December 2024)
- 05000373/LER-1983-075-03, /03L-0:on 830709,while Conducting LOS-PF-Q1, Quarterly Watertight Door Surveilance,Water Tight Door 17 Found Open & Broken.Caused by Broken Shear Pin in Gear Mechanism.Door Repaired + (08:01:07, 15 December 2024)
- ML20076C347 + (08:01:08, 15 December 2024)
- 05000373/LER-1983-080-03, /03L-0:on 830707,LPCS Water Leg Pump & Discharge Pressure Low Alarm Tripped.Caused by Frozen Pump W/Outboard Bearing Locked on Pump.Shaft,Bearings,Oil Seals & Mechanical Seal Replaced + (08:01:09, 15 December 2024)
- AECM-83-0470, Commits to Supply Addl Info Addressing NRC Concerns Re Revised Control Room Inleakage Dose Assessment & Modified Meteorological Assumptions within 6 Months.Discussion of Conservatisms in Revised X/Q Methodology Encl + (08:01:10, 15 December 2024)
- ML20076C329 + (08:01:11, 15 December 2024)
- ML20076C331 + (08:01:11, 15 December 2024)
- ML20076C326 + (08:01:12, 15 December 2024)
- ML20076C327 + (08:01:12, 15 December 2024)
- ML20076C325 + (08:01:13, 15 December 2024)
- ML20076C321 + (08:01:14, 15 December 2024)
- ML20076C322 + (08:01:14, 15 December 2024)
- 05000443/LER-1991-007, :on 910615,actuation of Control Room Emergency Air Cleanup & Filtration Subsystems Occurred.Caused by Personnel Error Due to Lack of Attention to Detail.Event Will Be Discuss W/Respective Operating Crews + (08:01:16, 15 December 2024)
- 05000316/LER-1983-064-03, /03L-0:on 830717,computer P-250 Which Logs Axial Flux Difference Failed.Caused by Personnel Error.Personnel Counseled + (08:01:18, 15 December 2024)
- A16764, Radiochemical Analysis of First Plateout Probe from Fort St Vrain High-Temp Gas-Cooled Reactor + (08:01:19, 15 December 2024)
- ML20076C314 + (08:01:20, 15 December 2024)
- 05000316/LER-1983-063-03, /03L-0:on 830709,steam Generator 2 Stop Valve MRV-220 Drifted Off Open Detents.Cause Not Stated.Detents Spring Tension Adjusted + (08:01:22, 15 December 2024)
- ML20076C310 + (08:01:23, 15 December 2024)
- ML20076C308 + (08:01:24, 15 December 2024)
- 05000366/LER-1983-062-03, /03L-0:on 830720 & 25,core Max Fraction of Limiting Power Density Exceeded Fraction of Rated Thermal Power.Caused by Peaks in Core Flux.Average Power Range Monitor Adjusted + (08:01:25, 15 December 2024)
- 05000316/LER-1983-062-03, /03L-0:investigation Determined 830616 & 24 Events Re Control Room Cable Vault Fire Detection Instrumentation Reportable.Events Caused by Pyralarm Detectors Alarming W/ No Adverse Conditions.Fire Watch Established + (08:01:27, 15 December 2024)
- ML20076C299 + (08:01:28, 15 December 2024)
- ML20076C295 + (08:01:29, 15 December 2024)
- 05000280/LER-1983-032-03, /03L-0:on 830718,svc Water Pump 1-SW-P-10B Would Not Develop Sufficient Discharge Pressure.Caused by Valve Not Properly Sealed Due to Matl in Svc Water.Check Valve Flushed Out + (08:01:30, 15 December 2024)
- ML20076C279 + (08:01:32, 15 December 2024)
- ML20076C280 + (08:01:32, 15 December 2024)
- ML20076C275 + (08:01:33, 15 December 2024)
- ML20076C272 + (08:01:33, 15 December 2024)
- U-601847, Reactor Containment Bldg Integrated Leak Rate Test. W/ + (08:01:34, 15 December 2024)
- ML20076C269 + (08:01:35, 15 December 2024)
- 05000361/LER-1983-010-01, Creacus Train a Failed to Maintain Required Positive Pressure in Control Room During Testing & Declared Inoperable.Caused by Air Leakage Through Control Room Boundary.New Door Seals Installed + (08:01:36, 15 December 2024)
- ML20076C265 + (08:01:37, 15 December 2024)
- 05000362/LER-1983-051-03, /03L-0:on 830712,while in Mode 4,condenser Air Ejector Monitor 3RT-7870 Discovered to Have Low Flow During Routine Daily Surveillance & Declared Inoperable.Caused by Valve Manipulation by Unauthorized Personnel + (08:01:39, 15 December 2024)
- ML20076C253 + (08:01:40, 15 December 2024)
- ML20076C257 + (08:01:40, 15 December 2024)
- ML20076C241 + (08:01:41, 15 December 2024)
- ML20076C250 + (08:01:41, 15 December 2024)
- ML20076C236 + (08:01:42, 15 December 2024)
- ML20076C234 + (08:01:43, 15 December 2024)
- 05000389/LER-1983-036-03, /03L-0:on 830714 & 18,personnel Airlock Outer Door Seal Failed Routine Leak Test Surveillance.Caused by Improper Seating of Door Seal.Operating Mechanism Adjusted + (08:01:44, 15 December 2024)
- TXX-4023, Deficiency Rept Re Inadequate Overpressure Protection for Spent Fuel Pool Cooling HXs for Component Cooling Water. Pressure Relief Piping & Valve Component Configuration Evaluated + (08:01:45, 15 December 2024)
- ML20076C202 + (08:01:46, 15 December 2024)
- 05000416/LER-1983-085-03, /03L-0:on 830719,inadvertent LOCA Signal Received in Div II LOCA Logic & RHR Pump B Breaker Closed Repeatedly Following Isolation.Cause of LOCA Signal Due to Troubleshooting Investigation + (08:01:48, 15 December 2024)
- ML20076C189 + (08:01:51, 15 December 2024)
- STC-20-020, Notification of Acceptance to the Brachytherapy & Gamma Knife & Other Uses (H-313) Course - Virtually: August 3-7, 2020 + (08:01:52, 15 December 2024)