Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077G526 + (06:34:13, 15 December 2024)
- ML20077G521 + (06:34:14, 15 December 2024)
- ML20077G516 + (06:34:15, 15 December 2024)
- ML20077G509 + (06:34:18, 15 December 2024)
- ML20077G500 + (06:34:19, 15 December 2024)
- ML20077G497 + (06:34:20, 15 December 2024)
- 05000271/LER-1983-017-03, /03L-0:on 830629,time Delay Unit 10A-KY5-1 Failed to Actuate in Required Time During RHR Sys Surveillance. Caused by Faulty Time Delay Unit.Entire Time Delay Unit Replaced + (06:34:21, 15 December 2024)
- B10841, Forwards Amend 3 to Environ Rept - OL Stage,Consisting of Section 7.1.9 Re Accidents Beyond Design Bases + (06:34:22, 15 December 2024)
- 05000266/LER-1983-004-03, /03L-0:on 830621,breaker Serving MOV-826B Found Open During Normal Operation & Redundant Valve MOV-826C Not Tested Prior to Disabling MOV-826B.Probably Caused by Personnel Accidentally Opening Breaker + (06:34:23, 15 December 2024)
- 05000237/LER-1983-022-03, No Position Indication Found for Core Spray Injection Valve Mo 1402-25B.Caused by Equipment Failure & Inadequate Procedure.Breaker Replaced & Corrected Data Sheet Added to Procedure + (06:34:26, 15 December 2024)
- ML20077G470 + (06:34:27, 15 December 2024)
- ML20077G452 + (06:34:31, 15 December 2024)
- 05000373/LER-1983-073-01, /01T-0:on 830714,RWL 129-inch Test Signal to Pressure Switch 1B21-NO37A Failed to Initiate ECCS Pumps. Cause Unknown.Switched Leads Correctly Landed & Hourly Security Patrol of ECCS Panel Initiated + (06:34:32, 15 December 2024)
- ML20077G443 + (06:34:33, 15 December 2024)
- 05000237/LER-1983-043-03, Narrow-range Gemac (2-640-29A) & wide-range Yarway (2-263-160A) Reactor Water Level Indicators Pegged High.Caused by Loose Packing Nut on Pressure Switch 2-263-111A.Nut Tightened + (06:34:35, 15 December 2024)
- ML20077G410 + (06:34:36, 15 December 2024)
- ML20077G408 + (06:34:36, 15 December 2024)
- ML20077G404 + (06:34:37, 15 December 2024)
- 05000282/LER-1991-006-01, :on 910525,discovered That Selector Switch for Radiation Monitor R-35 in Reset Position Due Personnel Error.Switch Returned to Operate Position + (06:34:39, 15 December 2024)
- 05000339/LER-1983-057-03, /03L-0:on 830706,containment Inner Personnel Air Lock Seal Leakage Detected.Caused by Dirty Seals from Containment Entries.Seals Cleaned & Lubricated + (06:34:40, 15 December 2024)
- 05000382/LER-1990-004-01, :on 900408,partial Actuation of Emergency Feedwater Sys Occurred During Scheduled Functional Test of Pps.Caused by Test Circuit Malfunction.Matrix Test Module Relay Hold Pushbutton Assembly Replaced + (06:34:42, 15 December 2024)
- 05000316/LER-1983-055-01, /01T-0:on 830704,NESW Fire Protection Valve ZRV-13 Found Leaking Into Drain Line on HV-CFT-2,containment Auxiliary Charcoal Filter Fan 2.Caused by Sand Preventing Proper Valve Seating.Valve Cleaned + (06:34:44, 15 December 2024)
- 05000289/LER-1989-002, :on 891114,radiator Fan Right Angle Gear Drive Bearing Lubrication Discovered Inadequate Due to Formation of Sludge in Lubrication Lines.Caused by Inadequate Procedure.Plant Procedures Revised + (06:34:50, 15 December 2024)
- 05000259/LER-1983-042-03, /03L-0:on 830629,reactor Bldg Elevation 621 Fire Protection Panel 1-25-303,Zone S,W & X Trouble Alarm Sounded.Caused by Spring Loaded 8A Fuse Holder Releasing. Fuse & Fuse Holder Repaired + (06:34:52, 15 December 2024)
- 05000424/LER-1990-021, :on 901202,special Condition Surveillance Not Performed When Rod Position Deviation Monitor Inoperable. Caused Personnel Error.Personnel Under Went Positive Discipline Re Compliance W/Procedures + (06:34:54, 15 December 2024)
- 05000277/LER-1991-018, :on 910523,Tech Spec 3.0.C Entered & Plant Shutdown Initiated Due to Belief That Diesel Generators Inoperable.Caused by Misclassification of EDG Day Tank. Engineering Review Performed + (06:34:56, 15 December 2024)
- HL-1692, Provides Response to Re Violations Noted in Insp Repts 50-321/91-04 & 50-366/91-04.Corrective Actions:Hpci Sys Left W/Suppression Pool as Suction Source Until CST Level Switch Setpoints Changed + (06:34:57, 15 December 2024)
- ML20077G363 + (06:34:57, 15 December 2024)
- ST-HL-AE-3798, Notifies That License for Kp Mulligan Senior Reactor Operator Should Be Discontinued.Will Continue Present Position as Shift Technical Advisor & Does Not Require Senior Reactor Operator License + (06:34:58, 15 December 2024)
- JPN-91-026, Forwards Response to SALP Rept 50-333/89-99 Covering Oct 1989 to Jan 1991,per SALP 910604 Meeting.Efforts to Upgrade Procedures to Add Human Performance Enhancements Will Continue to Address Category 2 Rating in Plant Operations + (06:34:59, 15 December 2024)
- ML20077G351 + (06:34:59, 15 December 2024)
- ML20077G348 + (06:35:00, 15 December 2024)
- ML20077G344 + (06:35:00, 15 December 2024)
- ELV-02851, Forwards Safeguard Info Task Force Final Rept Re Implementing Program to Minimize Future Safeguards + (06:35:01, 15 December 2024)
- ML20077G343 + (06:35:01, 15 December 2024)
- ML20077G327 + (06:35:02, 15 December 2024)
- 05000338/LER-1983-037-03, /03L-0:on 830626,conditioning Module TC-MM 100A-1 to Meteorological 33-ft Temp Chart Recorder Drifted by 1.15 F.Caused by Instrument Drift.Module Recalibr + (06:35:03, 15 December 2024)
- 05000341/LER-1991-012, :on 910525,full Scram Signal Occurred.Caused by Damaged Fuse Holder.Damaged Fuse Holder in IRM G Replaced & Fuse Properly Seated + (06:35:05, 15 December 2024)
- 05000348/LER-1991-006, :on 910524,inadvertent OTDT Reactor Trip Occurred During Testing.Caused by Failure to Request Drawing Rev When Spare RTD Was Placed in Svc.Appropriate Maint & Plant Mod Personnel Trained + (06:35:11, 15 December 2024)
- 05000341/LER-1991-011, :on 910523,control Ctr HVAC Sys Shifted in Recirculation Mode.Caused by Spurious Spike of Radiation Monitor.Radiation Monitor Reset & Work Request Initiated + (06:35:13, 15 December 2024)
- NRC-94-0130, Comment Supporting Proposed Rule 10CFR2,51 & 54 Re NPP License Renewal + (06:35:17, 15 December 2024)
- 05000353/LER-1991-009-02, :on 910521,loose Wire in Potential Transformer Sensing Network of EDG Resulted in Test Failure Occurrence. Caused by Loose Wire.Edg Wire in Potential Transformer Sensing Network Terminated + (06:35:18, 15 December 2024)
- 05000353/LER-1989-010-01, :on 891013,HPIC Sys Declared Inoperable.Caused by Personnel Error Resulting in Condensate Accumulating Inside Hpic Turbine Exhaust Pipe.Immediately Following Event Hpic Removed from Svc + (06:35:20, 15 December 2024)
- ML20077G299 + (06:35:24, 15 December 2024)
- NG-94-4468, Comment Supporting Proposed Rule 10CFR2,51 & 54 Re NPP License Renewal.Util Encourages NRC to Give Consideration to NUMARC Recommendation That Rule Include Addl Criterion Permitting Generic Exclusion of Redundant Structures + (06:35:25, 15 December 2024)
- 05000413/LER-1991-011, :on 910526,feedwater Sys Isolation Occurred During Racking Out Activities of a Reactor Trip Bypass Breaker.Cause Unknown.Design Study in Progress + (06:35:26, 15 December 2024)
- NRC-94-0128, Comment Supporting & Opposing Sections of Proposed GL Re Reconsideration of NPP Security Requirements for an Internal Threat, + (06:35:27, 15 December 2024)
- 05000324/LER-1991-003-03, :on 910521,ESF Actuation Occurred.Caused by Erroneous Trip in RCIC Steam Line Break Isolation.Condition Cleared W/O Corrective Actions + (06:35:29, 15 December 2024)
- 05000373/LER-1983-069-03, /03L-0:on 830620,dampers OVE07&B,8YB & 9YB Failed in Safe Positions Due to Power Supply Interruption.Caused by Use of Fast Blow Fuse Instead of Slow Blow Fuse.Fast Blow Fuse Replaced w/slow-blow Type + (06:35:31, 15 December 2024)
- ML20077G284 + (06:35:32, 15 December 2024)
- ML20077G285 + (06:35:32, 15 December 2024)
- ML20077G274 + (06:35:33, 15 December 2024)