8 /71 0 m

9 PRit CIPAL STAFF QA EtJF gg waAo scs 2000 Second Aven Emdison me ca WiQ g

J A

PA0 i3p

}__

July 12, 1983 Mi- -

OL FILEm i

Y0 SWK1kD02 Mr. J. E. Konklin g'

Chief-Reactor Project Section lA U. S. Nuclear Regulatory Commission 799 Koosevelt Road Glen Ellyn, IL 60137

Subject:

Preoperational Test PRET.E4100.001 -

High Pressure Coolant Injection System

Dear Mr. Konklin:

i The subject Preoperational Test is being initiated on or about August 1, 1983. By copy of this letter, a copy of test procedure PRET.E4100.001 Rev. 1, is being transmitted to the Chief of Test Programs Section. A copy of this procedure has also been provided for Mr. Paul Byron, NRC Resident Inspector.

This is a revision that is presently under review with TRC and there will be minor changes made to it.

If you have any further questions or need additional information s please contact Mr. T. Nickelson, Startup Engineer.

{

1 Yours very truly, C. F.

/

F. E. Agosti Manager - Startup Testing FEA/lma cc:

L. Reyes, Chief, Test Programs Section P. Byron (NRC Resident Inspector)

T. Alessi A. Wegele W. Fahrner P. Fessler W. Holland P. Woodley W. Jens File 11.4.1.1 T. Mintun File E4100 T. Nickelson ARMS L. Schuerman 58 - 341

[

8308040255 830712 JUL 2 01983 PDR ADOCK 05000341 L

~

lW N

A

. _ _ _ _ _ _.