Responds to NRC Re Violations Noted in IE Insp Repts 50-352/83-08 & 50-353/83-05.Corrective Actions:Pipe Shock Arrestors GBB-102-H34 & HBB-118-H40 Labeled.Snubbers Inspected & Stroked
ML20077G344
Person / Time
Site: Limerick  
Issue date: 07/25/1983
From: Kemper T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20077G336 List:
References
NUDOCS 8308040076
Download: ML20077G344 (3)


Text

s PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHIA. PA.19101 JOHN S. KEMPER

.. 7 % "?! "'f l _

Mr. Thomas E. Murley, Director United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406

Subject:

US NRC IE Letter, dated July 5,1983 RE: Site Inspection of May 29 - June 4,1983 Inspection Report No. 50-352/83-08 and'50-353/83-05 Limerick Generating Station, Units 1 & 2 File: QUAL l-2-2 (352/83-08 and 353/83-05)

Dear Mr. Murley:

In response to the subject letter regarding items identified during the subject inspection of construction activities authorized by NRC License No.

CPPR-106, -107, we transmit the following:

Attachment I - Response to Appendix A Also enclosed is an affidavit relating to the response.

Should you have any questions concerning these items, we would be pleased to discuss them with you.

Sincerely,

$.Nf JMC/mmk Attachments Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.

20555 S. K. Chaudhary/J. Grant, US NRC Resident Inspector B300040076 830728 DRADOCK05000g

j l

I COMMONWEALTH OF PENNSYLVANIA :

ss.

COUNTY OF PHILADELPHIA J

l JOHN S. KEMPER, being first duly sworn, desposes and says:

s' That he is Vice President of Philadelphia Electric Company, the holder of Construction Permits CPPR-106 and CPPR-107 for Limerick l

Generating Station Units 1 and 2; that he has read the foregoing i

Response to Inspection Report No. 50-352/83-08 and 50-353/83-05 and knows the contents thereof; and that the statements and matters set x forth therein are true and correct to the best of his knowledge,

. x information and belief.

J e

a,;

r b

f. E dm s'

f i

Subscribed and sworn to before me this day or %. 19 f3

. j _-

Notary Public PATRICIA O. SCHOLL Notery Public, Philadelphia Philadelphia Co.

My Commission Expires Fehtuary 10, 1986 J

i

,)

I

?

i..

g s

j i

4 p

z

,n

=.

ATTACHMENT I RESPONSE TO APPENDIX A Violation A j

10 CFR 50, Appendix B, Criterion V requires that activities affecting.

quality shall be prescribed by documented instructions, procedures or drawings, of a type appropriate to the circumstances.

Bechtel Job Rule 8031-JR-M-17 requires that mechancial shock arrestors " installed in the horizontal position shall be labeled " Keep Off" to prevent them from being used as a step or ladder during construction.

Those requiring additional 4

temporary wrappings during construction operations shall be labeled with visible " Keep Off" signs."

Contrary to the above, on June 6, 1983, it was identified that horizontal shock arrestors, GBB-102-H34 and HBB-118-H40, were not labeled with " Keep Off" signs as required by the applicable project procedures.

Response to Violation A i

[

The pipe shock arrestors GBB-102-H34 and HBB-118-H40 have been labeled as required. Also, the board was removed on HBB-188-76.

Each of these snubbers have been satisfacto'rily inspected and stroked, hence, no damage

[.

resulted from the storage conditions.

t To prevent recurrence, the responsible superintendents, general foremen and foremen were.re-instructed in the requirements of Job Rule 8031-JR-M-17.

i a

k

+

I 1/1

~'

50-352/83-08 D-50-353/83-05 m

.g h

f'

-\\

j*

d' y(..,

f v.

"m

.