Text
s PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHIA. PA.19101 JOHN S. KEMPER
.. 7 % "?! "'f l _
Mr. Thomas E. Murley, Director United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406
Subject:
US NRC IE Letter, dated July 5,1983 RE: Site Inspection of May 29 - June 4,1983 Inspection Report No. 50-352/83-08 and'50-353/83-05 Limerick Generating Station, Units 1 & 2 File: QUAL l-2-2 (352/83-08 and 353/83-05)
Dear Mr. Murley:
In response to the subject letter regarding items identified during the subject inspection of construction activities authorized by NRC License No.
CPPR-106, -107, we transmit the following:
Attachment I - Response to Appendix A Also enclosed is an affidavit relating to the response.
Should you have any questions concerning these items, we would be pleased to discuss them with you.
Sincerely,
$.Nf JMC/mmk Attachments Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.
20555 S. K. Chaudhary/J. Grant, US NRC Resident Inspector B300040076 830728 DRADOCK05000g
j l
I COMMONWEALTH OF PENNSYLVANIA :
ss.
COUNTY OF PHILADELPHIA J
l JOHN S. KEMPER, being first duly sworn, desposes and says:
s' That he is Vice President of Philadelphia Electric Company, the holder of Construction Permits CPPR-106 and CPPR-107 for Limerick l
Generating Station Units 1 and 2; that he has read the foregoing i
Response to Inspection Report No. 50-352/83-08 and 50-353/83-05 and knows the contents thereof; and that the statements and matters set x forth therein are true and correct to the best of his knowledge,
. x information and belief.
J e
a,;
r b
- f. E dm s'
f i
Subscribed and sworn to before me this day or %. 19 f3
. j _-
Notary Public PATRICIA O. SCHOLL Notery Public, Philadelphia Philadelphia Co.
My Commission Expires Fehtuary 10, 1986 J
i
,)
I
?
i..
g s
j i
4 p
z
,n
=.
ATTACHMENT I RESPONSE TO APPENDIX A Violation A j
10 CFR 50, Appendix B, Criterion V requires that activities affecting.
quality shall be prescribed by documented instructions, procedures or drawings, of a type appropriate to the circumstances.
Bechtel Job Rule 8031-JR-M-17 requires that mechancial shock arrestors " installed in the horizontal position shall be labeled " Keep Off" to prevent them from being used as a step or ladder during construction.
Those requiring additional 4
temporary wrappings during construction operations shall be labeled with visible " Keep Off" signs."
Contrary to the above, on June 6, 1983, it was identified that horizontal shock arrestors, GBB-102-H34 and HBB-118-H40, were not labeled with " Keep Off" signs as required by the applicable project procedures.
Response to Violation A i
[
The pipe shock arrestors GBB-102-H34 and HBB-118-H40 have been labeled as required. Also, the board was removed on HBB-188-76.
Each of these snubbers have been satisfacto'rily inspected and stroked, hence, no damage
[.
resulted from the storage conditions.
t To prevent recurrence, the responsible superintendents, general foremen and foremen were.re-instructed in the requirements of Job Rule 8031-JR-M-17.