ML20077G410
| ML20077G410 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/22/1983 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| REF-SSINS-6820 IEB-83-05, IEB-83-5, NUDOCS 8308040224 | |
| Download: ML20077G410 (1) | |
Text
_
t AAB MSC00 Sin Electnc eowen couesnr 231 W. MICHIGAN, P.O. BOX 204,6 MICHIGAN, WI S3201 July 22, 1983
{
5m R
t Mr. J. G. doppler, Regional Administrator Office of Inspection and Enforcement, t
Region III I
U. S. NUCLEAR REGULATORY COMMISS!0N F
799 Roosevelt Road i
Glen Ellyn, Illinois 60137 h
Dear Mr. Keppler:
DOCKETS 50-266 AND 50-301 RESPONSE TO IE BULLETIN 83-05 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 b
r.
L In response to IE Bulletin No. 83-05, "ASME Nuclear Code Pumps and Spara Parts Manufactured by the Hayward Tyler Pump Company", dated May 13, 1983, Wisconsin Electric has reviewed its records and as a result of this review we have concluded that no purchases from Hayward Tyler Pump Company of any kind, either E
directly or indirectly, have been made.
Accordingly, and as rsquested by the Point Beach NRC Resident Inspector, we are pro-E viding this negative response to the subject bulletin.
a
=
Very,truly yours
-5
.[h-
.1 (1
A E
Y, Vice President-4inclear Power C. W. Fay Copies to NRC Resident Inspector NRC Document Control Desk, Washington, D. C.
(w/ original) m b-i I
i 8308040224 830722
)
~
jul 2 51983 PDR ADOCK 05000266 G
P D_R.
{