Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078E705 + (05:43:56, 15 December 2024)
- TXX-9426, Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues + (05:43:56, 15 December 2024)
- ML20078E694 + (05:43:57, 15 December 2024)
- ML20078E691 + (05:43:58, 15 December 2024)
- ML20078E686 + (05:43:59, 15 December 2024)
- ML20078E680 + (05:44:00, 15 December 2024)
- 0CAN119402, Responds to Violations Noted in Insp Repts 50-313/94-20 & 50-368/94-20.Corrective Actions:Procedures Revised to Control ECP Level + (05:44:01, 15 December 2024)
- ML20078E669 + (05:44:01, 15 December 2024)
- NRC-94-4333, Documents 941027 Telcon Comments Re Proposed Rev to Control Room Habitability Section of SECY-94-084, Policy & Technical Issues Associated W/Regulatory Treatment of Nonsafety Sys in Passive Designs + (05:44:02, 15 December 2024)
- ML20078E659 + (05:44:03, 15 December 2024)
- ML20078E649 + (05:44:04, 15 December 2024)
- ML20078E625 + (05:44:05, 15 December 2024)
- ML20078E639 + (05:44:05, 15 December 2024)
- ML20078E606 + (05:44:06, 15 December 2024)
- ML20078E603 + (05:44:06, 15 December 2024)
- ML20078E601 + (05:44:07, 15 December 2024)
- ML20078E597 + (05:44:08, 15 December 2024)
- ML20078E567 + (05:44:09, 15 December 2024)
- ML20078E578 + (05:44:09, 15 December 2024)
- ML20078E552 + (05:44:10, 15 December 2024)
- ML20078E563 + (05:44:10, 15 December 2024)
- TXX-9428, Submits Results of Insp as Described in Re NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors. Thimble Tube Insps Completed at CPSES Unit 2 on 941018 + (05:44:11, 15 December 2024)
- 05000446/LER-1994-014, :on 941007,manual Reactor Trip Initiated.Caused by Digital Rod Position Indication Failure for Control Bank D Control Rod H-8.Loose Connector Will Be Corrected During Refueling Outage + (05:44:13, 15 December 2024)
- ML20078E535 + (05:44:13, 15 December 2024)
- ML20078E517 + (05:44:14, 15 December 2024)
- ML20078E516 + (05:44:15, 15 December 2024)
- ML20078E513 + (05:44:16, 15 December 2024)
- ML20078E504 + (05:44:17, 15 December 2024)
- ML20078E501 + (05:44:18, 15 December 2024)
- PY-CEI-NRR-1903, Requests Cancellation of Senior Operator License SOP-30518-2 Held by ML Wesley,Per 10CFR50.74(a).Wesley Reassigned to Position for Which Current Senior Operator License Not Needed + (05:44:18, 15 December 2024)
- ML20078E484 + (05:44:19, 15 December 2024)
- ML20078E481 + (05:44:20, 15 December 2024)
- ML20078E473 + (05:44:21, 15 December 2024)
- ML20078E475 + (05:44:21, 15 December 2024)
- ML20078E456 + (05:44:22, 15 December 2024)
- ML20078E468 + (05:44:22, 15 December 2024)
- ML20078E449 + (05:44:24, 15 December 2024)
- BVY-94-104, Responds to Operational Safeguards Response Evaluation Conducted at VT Yankee Nuclear Power Station.Util Purchasing Several Reinforced Concrete Structures (Planters) to Be Strategically Placed in Area Identified in Listed Issue + (05:44:25, 15 December 2024)
- ML20078E443 + (05:44:25, 15 December 2024)
- NRC-94-4337, Forwards Responses to NRC Requests for Addl Info on AP600 from NRC Ltrs of 940429,0714,0818 & 0902.Responses Associated W/Nrc 940429 & 0714 Ltrs Complete + (05:44:26, 15 December 2024)
- ML20078E429 + (05:44:28, 15 December 2024)
- 05000254/LER-1994-011-05, :on 940829,CRD L-11 Failed to Scram When Given Signal Due to Pipe Plug Inserted Into Solenoid Valve Due to Personnel Not Adhering to Procedure.Crd Inserted to Position 00 & Insps Conducted for Similar Obstructions + (05:44:29, 15 December 2024)
- ML20078E412 + (05:44:31, 15 December 2024)
- ML20078E380 + (05:44:32, 15 December 2024)
- ML20078E407 + (05:44:32, 15 December 2024)
- ML20078E371 + (05:44:33, 15 December 2024)
- 05000269/LER-1994-005-03, :on 941005,containment Isolation Valve 1RC-7 Rendered Technically Inoperable Due to Change Mgt.Valves 1RC-5 & 6 Closed & Electrically Deactivated & Mechanical Maint Team Involved Counseled + (05:44:35, 15 December 2024)
- 05000336/LER-1994-030, :on 941001,MSSV Setpoint Drift Occurred.Root Cause Unknown.Six of Ten Failed Valves Adjusted & Passed Subsequent Retests.Two Valves Passed Subsequent Tests W/O Adjustment + (05:44:37, 15 December 2024)
- 05000298/LER-1994-023, :on 941003,TS Violation Identified for Failure to Perform re-demonstration of DG-1 Operability.Caused by Inadequate Training.Training (Tailgate Sessions) W/Licensed Operations Personnel Will Be Performed + (05:44:39, 15 December 2024)
- ML20078E337 + (05:44:40, 15 December 2024)
- ML20078E333 + (05:44:41, 15 December 2024)